Electrical permit history — 9209 E Wrightstown Rd
9209 E Wrightstown Rd, Tucson — built 1975, with 42 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
9209 E Wrightstown Rd
Built 1975 — 1970s commercial stock · 42 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 9209 E Wrightstown Rd (aztucsonelectricalsolutions.com/property/13304009c/9209-e-wrightstown-rd-tucson-az-85715) · Public records last checked 2026-08-16
- Parcel
- 13304009C
- Built
- 1975 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-1
- Assessor use
- Privately Owned Academic School - Children
- Parcel size
- 11.76 acres
- Building area
- 13,977 sq ft (assessor record)
- Sewer
- Connection on file (2024) (county sewer connection records)
- Flood zone
- X (shaded) — 0.2% annual-chance flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2004 build permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2004 build permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyGetting onLast permitted 2010 (16 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T10BU01077 — Install 126' of 4" underground
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2005-06-16 | $1,400,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2024-06-21 (TC-COM-0624-01187) — Proposed private sewer plumbing. Eliminate septic tank connection and plumb to existing onsite private sewer for connection to public sewer..
Permit history (42)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2024-06-21finaled | TC-COM-0624-01187City permit record | Commercial BuildingProposed private sewer plumbing. Eliminate septic tank connection and plumb to existing onsite private sewer for connection to public sewer. | Complete | |
| 2014-07-25expired 2015-02-24 | T14CM04731City permit record | COMBORELOCATE MOP SINK - CHARTER SCHOOL | Expired | |
| 2010-07-14expired 2010-09-12 | T10EX00348City permit record | EXCAV100 FEET OF TRENCH | Closed | |
| 2010-07-06finaled | T10BU01077City permit record | SPKLRInstall 126' of 4" underground | Final | |
| 2010-06-11expired 2010-08-10 | T10EX00288City permit record | EXCAVEXCAV:1-25' DRIVEWAY W/ 2/25' RETURNS & CONC HEADE | Closed | |
| 2010-05-20finaled | T10PL00822City permit record | PLUMBPRIVATE SEWER | Final | |
| 2009-07-14finaled | T09BU01026City permit record | GRADSWPPGRADING:600CY CUT 2500CY FILL | Final | |
| 2009-07-14 | T09OT01433City permit record | FLOODPLNFLOODPLAIN USE PERMIT | Issued |
Show 34 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2009-04-13 | T09PL00645City permit record | PLUMBPRIVATE SEWER | Void | |
| 2009-03-17 | T09CM00601City permit record | COMBONEW CLASSROOM | Withdrwn | |
| 2008-12-29 | T08CM03994City permit record | COMBONEW MULTIPURPOSE BUILDING | Withdrwn | |
| 2008-07-23 | D08-0035City permit record | Development PackageTHE ACADEMY OF TUCSONOriginally approved 5/13/2009 | Approved | |
| 2007-04-24 | T07BU00901City permit record | Fence / wallADDT: WALL 250LF X 6' TO 8' HIGH | Withdrwn | |
| 2006-01-10finaled | T06OT00071City permit record | SIGN10394 | Final | |
| 2006-01-09 | T06OT00055City permit record | C-OF-OC OF O:CHARTER SCHOOL | Withdrwn | |
| 2006-01-09 | T06OT00056City permit record | C-OF-OC OF O:CHARTER SCHOOL | Withdrwn | |
| 2006-01-09 | T06OT00058City permit record | C-OF-OC OF O:CHARTER SCHOOL | Withdrwn | |
| 2006-01-09 | T06OT00059City permit record | C-OF-OC OF O:CHARTER SCHOOL | Withdrwn | |
| 2006-01-09 | T06OT00060City permit record | C-OF-OC OF O:CHATER SCHOOL | Withdrwn | |
| 2006-01-09 | T06OT00061City permit record | C-OF-OC OF O:CHARTER SCHOOL | Withdrwn | |
| 2006-01-09 | T06OT00062City permit record | C-OF-OC OF O:CHATER SCHOOL | Withdrwn | |
| 2004-08-09finaled | T04BU01962City permit record | BUILDFIRE ALARM | Final | |
| 2004-08-09finaled | T04BU01963City permit record | BUILDFIRE ALARM | Final | |
| 2004-08-09finaled | T04BU01964City permit record | BUILDFIRE ALARM | Final | |
| 2004-08-09finaled | T04BU01965City permit record | BUILDFIRE ALARM | Final | |
| 2004-08-09finaled | T04BU01966City permit record | BUILDFIRE ALARM | Final | |
| 2004-08-09finaled | T04BU01967City permit record | BUILDFIRE ALARM | Final | |
| 2004-08-09finaled | T04BU01968City permit record | BUILDFIRE ALALRM | Final | |
| 2004-06-30 | T04AN00629City permit record | ADDRNEW | Issued | |
| 2004-06-30finaled | T04OT01293City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-06-30finaled | T04OT01294City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-06-30finaled | T04OT01295City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-06-30finaled | T04OT01296City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-06-30finaled | T04OT01297City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-06-30finaled | T04OT01298City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-06-30finaled | T04OT01299City permit record | C-OF-OC OF O:CHARTER SCHOOL | C of o | |
| 2004-03-09finaled | T04OT00497City permit record | C-OF-OC OF O:SCHOOL ( T97CM03263) | C of o | |
| 1999-06-11finaled | T99CM02824City permit record | COMBODRINKING FOUNTAINS | Final | |
| 1998-01-13finaled | T98BU00065City permit record | SPKLRFIRE SPKR:60 4"UNDERGROUND PIPE | Final | |
| 1997-11-14expired 1998-01-13 | T97EX01407City permit record | EXCAVEXCAV:STREET CUT | Closed | |
| 1997-10-08finaled | T97CM03263City permit record | COMBOMODULAR:CLASSROOM | Final | |
| 1997-02-28finaled | T97BU00042City permit record | SPKLRFIRE SPKR:14 NEW:130LF 4"UNDERGRND PIPE | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 13304009C — 42 permits on file from 1997 to 2024 (15 c-of-o, 7 build, 5 combo, 3 excav) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).