Electrical permit history — 4555 S Campbell Av
4555 S Campbell Av, Tucson — built 2021, with 23 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
4555 S Campbell Av
Built 2021 — 2020s commercial stock · 23 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 4555 S Campbell Av (aztucsonelectricalsolutions.com/property/132190940/4555-s-campbell-av-tucson-az-85714) · Public records last checked 2026-08-17
- Parcel
- 132190940
- Built
- 2021 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Restaurant Fast Food
- Parcel size
- 1.51 acres
- Building area
- 4,580 sq ft (assessor record)
- Sewer
- Connection on file (2021) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentA newer 2026 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “EXPEDITE - New System installation”. Last permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00019 — CO2 DETECTION SYSTEM
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.
- Worth confirming
A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Most recent permit on record for this parcel: 2026-07-30 (TC-COM-0726-01202) — McDonald's relocate and install kitchen equipments. Add hood..
Permit history (23)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-07-30 | TC-COM-0726-01202City permit record | Commercial BuildingMcDonald's relocate and install kitchen equipments. Add hood. | In review | |
| 2026-07-28expires 2027-02-12 | TF-FCP-0726-00484City permit record | Fire ConstructionEXPEDITE - New System installation | Issued | |
| 2026-07-01 | TR-ROW-0726-00780City permit record | Right-of-Way (ROW)COX TO R&R 5253' AERIAL FIBER & PULL-THROUGH 406' TO INSTALL NEW CATV CONDUIT FOR SERVICE REPAIR ORDER | Needs resubmittal | |
| 2023-06-09finaled | TR-UTL-0623-01760City permit record | Right-of-Way (ROW) - UtilityPRJ252584-1- Cox submitting for traffic control permit to remove & replace aerial node equipment on existing aerial fiber. All existing. | Complete | |
| 2023-01-10finaled | TR-UTL-0123-00580City permit record | Right-of-Way (ROW) - UtilityINSTALLATION OF UNDERGROUND INFRASTRUCTURE TO FACILITATE INSTALLATION OF FIBER OPTIC CABLE FOR PIMA COUNTY | Complete | |
| 2022-10-04expired 2023-09-05 | T22OT00715City permit record | Sign - Permanent1-ILLUM dd SIGN | Issued | |
| 2022-02-14finaled | T22OT00112City permit record | Sign - Permanent1-illum DD sign | Complete | |
| 2022-01-11finaled | T22FC00019City permit record | FIRECONSCO2 DETECTION SYSTEM | Final |
Show 15 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-01-11finaled | T22FC00020City permit record | FIRECONSFIRE ALARM AND RELATED DEVICES. | Final | |
| 2022-01-11finaled | T22FO00030City permit record | FIREOPER3 POINT CO2 DETECTION SYSTEM WITH FIRE ALARM INTERFACES. | Final | |
| 2021-09-29finaled | T21RW04470City permit record | ROW(1) 5 ft X 5 ft bell hole in dirt front and 150 ft bore across E Benson Hwy to install gas line for new McDonald's Proof of notification is required at the time of the preconstruction meeting. | Final | |
| 2021-09-15finaled | T21RW04276City permit record | ROWStarting at TEP pole on the East side of S Campbell Ave South of E Benson HWY , tie in riser down pole trench/Bore South 135' placing conduit ,a CATV Ped and .625 coax tie in to customers existing 4" conduit PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | Final | |
| 2021-07-29finaled | T21FC00604City permit record | FIRECONS(3) Hookups of Ansul Suppression Systems. (2) 3 Gallon, (1) 6 Gallon. | Final | |
| 2021-07-07finaled | T21OT00499City permit record | Sign - PermanentILLUM SIGNS FOR NEW MCDONALDS | Complete | |
| 2021-07-07expired 2022-11-15 | T21OT00501City permit record | Sign - PermanentPole sign - requires SDRC review to exceed 12' height (22' height sought) and increase sign area fro | Expired | |
| 2021-06-21 | T21RW02993City permit record | ROW | Withdrwn | |
| 2021-06-21finaled | T21RW03006City permit record | Pool / spaFIRE HYDANT, FIRE SERVICE, WATER SERVICE FOR NEW MCDONALDS. TIE INTO EXISITING WATER MAIN RUNNING NORTH/SOUTH ON CAMPBELL. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS | Final | |
| 2021-06-03finaled | T21FC00447City permit record | FIRECONSNew Fire Sprinkler System for ground up construction | Final | |
| 2021-05-20finaled | T21RW02493City permit record | ROWTRAFFIC CONTROL ONLY FOR THE CONSTRUCTION / INSTALLATION OF OFFSITE IMPROVEMENTS ASSOCIATED WITH McDONALD'S USA, LLC - CAMPBELL AVENUE, PIA NO. T20PI00019, PLAN NO. I-2020-019. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | Final | |
| 2021-05-10expired 2021-12-08 | T21CM03943City permit record | Commercial BuildingTemporary power for construction - can an inspection for temporary power be added to existing buildi | Expired | |
| 2020-12-17finaled | T20CM08851City permit record | COMBONew Restaurant | C of o | |
| 2020-04-13finaled | DP20-0081City permit record | Development PackageSITE/GRADING/SWPPP - McDonalds, new restaurant. | Complete | |
| 2017-01-04finaled | T17RW00081City permit record | ROWSEWER REHABILITATION - NO EXCAVATION | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2019-11-21 | T19DV09015Code enforcement case | Vegetation | Referred |
| 2011-06-01 | T11DV03921Code enforcement case | Vegetation | Noverify |
| 2009-07-24 | T09DV04259Code enforcement case | Vegetation | Complian |
| 2007-04-27 | T07DV03844Code enforcement case | Vegetation | Cancel |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 132190940 — 23 permits on file from 2017 to 2026 (5 row, 4 sign - permanent, 4 firecons, 2 commercial building) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).