Electrical permit history — 2555 E Irvington Rd
2555 E Irvington Rd, Tucson — built 1973, with 52 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Manufactured home
2555 E Irvington Rd
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 1973 — manufactured home · HVAC 2001 (permit expired without a confirmed final)
Permanent link: Electrical permit history for 2555 E Irvington Rd (aztucsonelectricalsolutions.com/property/13219038d/2555-e-irvington-rd-tucson-az-85714) · Public records last checked 2026-08-19
Public record indicators for electrical planning
- Parcel
- 13219038D
- Year constructed
- 1973 (county record)
- Permitting authority
- Tucson
- Zoning
- MH-1
- Lot size
- 5.96 acres
- Sewer
- Connection on file (1972) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: FEMA flood zone X — minimal flood hazard, not a Special Flood Hazard Area. FIRM panel 04019C2291L, effective 2011-06-16. Open this property on FEMA’s official flood map ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 13219038D ↗ · the City of Tucson ↗
Is it time to upgrade?
- Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. That does not tell you the service is original — only that nothing has been permitted here recently. The build year is the better clue, and it is above.
- Heating & coolingPermitted — completion not confirmedA 2001 permit specifies this work (the permit description states “A/C:REPLACEMENT(APA)”), but the available record does not show a final inspection. The permit expired without a confirmed final status. Official status: Expired. Contractor of record: KELLY AIR CONDITIONING , *C. T01ME00065 — A/C:REPLACEMENT(APA)
- Water heaterGetting onLast permitted 2015 (11 years ago). T15CM01381 — REPLACE EXTERIOR WATER HEATER - MH PARK (APA)
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
- Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
This reads as a manufactured or mobile home. The electrical questions are different from a stick-built house: the service and meter usually sit on a separate pedestal, and the feeder from that pedestal to the home is where undersizing and corrosion show up first.
- Worth confirming
Bonding and grounding are the common finding on older units — the frame must be bonded, and the neutral and ground have to stay separated downstream of the service disconnect at the pedestal.
- Worth confirming
A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Routine
Adding an EV charger, a mini-split, or a casita usually means looking at the pedestal service and feeder capacity rather than the panel inside the home.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 52 building permits for this parcel dated between 1997 and 2026. By category the work is mh (39), right-of-way (row) - utility (4), row (3) and demolition. 22 of them carry a final inspection; the other 30 were issued, expired or are still open, which is not the same as work completed. There are 12 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (52): 2026 TR-UTL-0726-01109 · 2025 TC-DMO-1225-00241 · 2025 TR-UTL-0325-00435 · 2022 TR-UTL-1222-00531 · 2022 TR-UTL-1022-00072 · 2022 T22RW00841 · 2021 T21RW04698 · 2020 T20RW04211 · 2018 T18RW00287 · 2015 T15CM01381 · 2012 T12MH00058 · 2011 T11PL00186 · 2010 T10MH00082 · 2010 T10MH00069 · 2010 T10MH00035 · 2010 T10MH00036 · 2010 T10MH00037 · 2009 T09MH00126 · 2009 T09MH00009 · 2009 T09MH00010 · 2003 T03AN01172 · 2002 T02MH00021 · 2001 T01MH00627 · 2001 T01MH00616 · 2001 T01MH00593 · 2001 T01MH00544 · 2001 T01MH00495 · 2001 T01MH00284 · 2001 T01MH00264 · 2001 T01MH00243 · and 22 older — search the parcel at the office below
Code enforcement cases (12): 2025 CE-VIO1025-04641 · 2025 CE-VIO0725-02897 · 2023 CE-VIO0423-03097 · 2020 T20DV07308 · 2020 T20DV07315 · 2018 T18DV03861 · 2015 T15DV05997 · 2006 T06VL00145 · 2003 T03VL00446 · 2002 T02VL01234 · 2000 T00VL01713 · 1998 T98VL00113
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 13219038D. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All mobile-home parks · Commercial property in 85714 · Commercial & industrial reports · Homes in 85714 · Permit data by neighborhood
Planning work at this home?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this report was built
This is a reading of public records for parcel 13219038D — 52 permits on file from 1997 to 2026 (39 mh, 4 right-of-way (row) - utility, 3 row, 1 demolition) and 12 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-19; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
