Electrical permit history — 1155 E Palmdale St
1155 E Palmdale St, Tucson — built 1980, with 29 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1155 E Palmdale St
Built 1980 — 1980s commercial stock · last permitted panel/service work 2016 (finaled)
Permanent link: Electrical permit history for 1155 E Palmdale St (aztucsonelectricalsolutions.com/property/132171400/1155-e-palmdale-st-tucson-az-85714) · Public records last checked 2026-08-16
- Parcel
- 132171400
- Built
- 1980 (county record)
- Jurisdiction
- Tucson
- Zoning
- I-1
- Assessor use
- Warehouse W/Office/Retailplanned Park
- Parcel size
- 1.81 acres
- Building area
- 30,102 sq ft (assessor record)
- Sewer
- Connection on file (2002) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2016 permit was finalized; the permit description states “REPLACE 200 AMP 3 PHASE DISCONNECT”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2016 (10 years ago). City inspection record: ELECTRIC - FINAL approved 2016-05-05. Contractor of record: JMAC ELECTRIC LLC * APA *. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T16CM03385 — REPLACE 200 AMP 3 PHASE DISCONNECT
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2013 (13 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T13BU01175 — FIRE SPRINKLER
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
- Worth confirming
A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2004-08-11 | $1,100,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2024-10-28 (TC-COM-1024-02070) — Remove old 200 amp 480 volt disconnect Install new 200 Amp 480 volt disconnet..
Permit history (29)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2024-10-28 | TC-COM-1024-02070City permit record | Commercial BuildingRemove old 200 amp 480 volt disconnect Install new 200 Amp 480 volt disconnet. | Approved - awaiting customer attention | |
| 2024-10-28expired 2025-04-26 | TC-COM-1024-02073City permit record | Commercial BuildingVOIDED DUPLICATE PERMIT Replace old 200 amp 480 volt disconnect with new one in exact location. | Void | |
| 2023-10-30finaled | TF-FCP-1023-01260City permit record | Fire ConstructionTenant Improvement | Complete | |
| 2022-01-31finaled | T22RW00294City permit record | Pool / spa(2) 5'X5' Bell holes in dirt/concrete sidewalk to repair/replace gas line. Crews will be trenching across Palmdale Street and will also be working at 1135 E Palmdale St #100. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 7. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS 10. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | Final | |
| 2021-08-31finaled | T21RW04033City permit record | ROW(2) 5X5 BELLHOLES IN BLKTOP FRONT WITH AN APPROX. 4' X 60' TRENCH IN BLKTOP TO REPAIR/REPLACE GAS LINE. CREWS WILL BE WORKING ON E PALMDALE ST | Final | |
| 2018-07-17finaled | T18CM05553City permit record | COMBOELECTRIC UPGRADE UPTO 800 AMPS | Final | |
| 2016-05-05finaled | T16CM03385City permit record | COMBOREPLACE 200 AMP 3 PHASE DISCONNECT | Final | |
| 2014-07-17finaled | T14OT00931City permit record | Fence / wall2- IDENTICAL NON-ILLUM WALL SIGNS ON THE S, & W. ELEVS / C OF C ON DF 8/18/14 | Final |
Show 21 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2013-10-23finaled | T13BU01175City permit record | SPKLRFIRE SPRINKLER | Final | |
| 2013-10-04finaled | T13CM06094City permit record | COMBOTI: OFFICE | Final | |
| 2010-11-15finaled | T10EL02598City permit record | ELECTREPLACE METER BASE | Final | |
| 2010-06-07finaled | T10EL01362City permit record | ELECTREPLACE: METER BASE; T10DV03669 | Final | |
| 2008-03-12finaled | T08BU00482City permit record | SPKLRAdd 18 fire sprinklers | Final | |
| 2008-03-07finaled | T08BU00458City permit record | SPKLRAdd 1 fire sprinkler | Final | |
| 2008-01-10finaled | T08CM00090City permit record | COMBOTI:OFFICE | Final | |
| 2008-01-08expired 2008-08-04 | T08OT00046City permit record | SIGN14281 | Expired | |
| 2007-12-18finaled | T07OT02863City permit record | C-OF-OC OF O: E SSCC WHOLESALE ELECTRIC | C of o | |
| 2007-07-20finaled | T07EL01350City permit record | ELECTREPLACE:ELECTRIC METER DAMAGED BY LIGHTNING | Final | |
| 2006-01-13finaled | T06OT00118City permit record | SIGN10424 | Final | |
| 1999-02-16finaled | T99ME00202City permit record | MECHPRESSURE VESSEL CERTIFICATE:TUC-24675,24674,24673 | Final | |
| 1999-01-27expired 1999-11-30 | T99CM00353City permit record | COMBOTI:OFFICE | Expired | |
| 1998-07-16finaled | T98BU01768City permit record | SPKLRFIRE SPKR:RELOC 8 | Final | |
| 1998-04-08finaled | T98CM01482City permit record | COMBOTI:OFFICE & MANUFACTURING | C of o | |
| 1998-04-07expired 1998-10-04 | T98BU00860City permit record | TANKSTANK:250 GAL PROPANE | Expired | |
| 1998-04-01finaled | T98BU00833City permit record | SPKLRFIRE SPKR: ADD 2 | Final | |
| 1998-02-24finaled | T98BU00466City permit record | SPKLRFIRE SPKR:ADD 9 | Final | |
| 1998-02-24 | T98BU00467City permit record | SPKLRFIRE SPKR:RELOC 10 | Withdrwn | |
| 1998-02-17expired 1999-06-08 | T98CM00650City permit record | COMBOTI:MANUFACTURING (INSTALLING NEW EQUIPEMENT AND RELOCATING SPRAYBOOTHS) | Expired | |
| 1998-02-03 | T98CM00451City permit record | COMBOELECTRIC:INSTALL NEW EQUIPMENT:GAS LINE:NEW | Withdrwn |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (5)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2022-01-19 | T22DV00462Code enforcement case | Fire | Complian |
| 2011-02-08finaled | T11FR00381Code enforcement case | Fire | Complete |
| 2011-02-08 | T11FR00387Code enforcement case | Fire | Field |
| 2010-06-07 | T10DV03669Code enforcement case | Electrical | Complian |
| 2009-07-09finaled | T09FR02252Code enforcement case | Fire | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 132171400 — 29 permits on file from 1998 to 2024 (8 combo, 7 spklr, 3 elect, 2 commercial building) and 5 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).