Electrical permit history — 1097 E Palmdale St
1097 E Palmdale St, Tucson — built 1985, with 48 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1097 E Palmdale St
Built 1985 — 1980s commercial stock · 48 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 1097 E Palmdale St (aztucsonelectricalsolutions.com/property/13217118c/1097-e-palmdale-st-tucson-az-85714) · Public records last checked 2026-08-16
- Parcel
- 13217118C
- Built
- 1985 (county record)
- Jurisdiction
- Tucson
- Zoning
- I-1
- Assessor use
- Office Building/Industrial Park One Story
- Parcel size
- 2.56 acres
- Building area
- 34,108 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2018 (8 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T18FC00474 — INSTALL OF FIRE ALARM SYSTEM
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
- Worth confirming
A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Worth confirming
There is an electrical reconnect permit from 2004. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.
Most recent permit on record for this parcel: 2026-08-12 (TF-FOP-0826-01062) — Annual fire department inspection for CPIH Park Outpatient Clinic, Suites 150-190.
Permit history (48)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-08-12 | TF-FOP-0826-01062City permit record | Fire OperationalAnnual fire department inspection for CPIH Park Outpatient Clinic, Suites 150-190 | In review | |
| 2026-07-01finaled | TF-FOP-0726-00919City permit record | Fire OperationalDesert Palm MAT, Suite 130 | Complete | |
| 2025-06-24finaled | TF-FOP-0625-00897City permit record | Fire OperationalAnnual fire department inspection for CPIH Park Clinic, Suites 150-190 | Complete | |
| 2025-06-19finaled | TF-FOP-0625-00887City permit record | Fire OperationalYearly fire department inspection for Desert Palm MAT Clinic | Complete | |
| 2024-06-04finaled | TF-FOP-0624-00658City permit record | Fire OperationalAnnual Fire Department Inspection for Desert Palm MAT Clinic, Suite 130 | Complete | |
| 2024-06-04finaled | TF-FOP-0624-00659City permit record | Fire OperationalAnnual fire department inspection for Park Clinic, Suites 150-190 | Complete | |
| 2023-02-10expired 2023-08-09 | TC-DMO-0223-00058City permit record | DemolitionREMOVE THE EXISTING 65' MONOPOLE, TOWER FOUNDATION, CHAIN-LINK FENCE, GATE, CMU WALL, CONCRETE PADS, ICE-BRIDGE, H-FRAMES, GRAVEL, AND ASSOCIATED EQUIPMENT. RESTORE COMPOUND TO NATURAL GRADE AND CONDITION. | Issued | |
| 2023-01-13finaled | TR-UTL-0123-00611City permit record | Right-of-Way (ROW) - UtilityACCESS OF EX MH 18689 & HH 18778 FOR SPLICING AND TRENCH 6' | Complete |
Show 40 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-12-01finaled | TF-FOP-1222-00175City permit record | Fire OperationalYearly fire department inspection for Suites 150-190, B Occupancy outpatient clinic. | Complete | |
| 2022-11-30finaled | TF-FOP-1122-00169City permit record | Fire OperationalYearly fire department inspection for B Occupancy outpatient clinic | Complete | |
| 2021-11-17finaled | T21FO00812City permit record | FIREOPEROUTPATIENT/HEALTHCARE CLINIC | Final | |
| 2021-10-20finaled | T21FO00730City permit record | FIREOPEROUTPATIENT CLINIC | Final | |
| 2021-05-05finaled | T21RW02205City permit record | Pool / spaW/O# 2105740 - REPLACE MISSING FIRE HYDRANT IN FRONT OF ADDRESS IN ASPHALT @ 10 LF. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 8. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 11. MAINTAIN PEDESTRIAN ACCESS 12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. | Final | |
| 2021-04-29finaled | T21RW02081City permit record | ROWPed S of 1021 E Palmdale St, Head S and begin 1214' pull through existing 144ct fiber. Tie in to existing Cox Vault. Proof of notification is required at the time of the preconstruction meeting. | Final | |
| 2020-10-28finaled | T20FO00577City permit record | FIREOPERSUITE 150-190 INTEGRATED CLINIC | Final | |
| 2020-08-06finaled | T20FO00395City permit record | FIREOPERMAT CLINIC | Final | |
| 2019-10-25finaled | T19RW06558City permit record | ROWJOB WILL REQUIRE ACCESS TO HH #17894 TO PLACE FIBER | Final | |
| 2019-10-07finaled | T19FO00821City permit record | FIREOPEROutpatient/ Health Care Clinic | Final | |
| 2019-08-30finaled | T19CM06320City permit record | COMBOTI - PHARMACY | L of c | |
| 2019-08-30 | T19CM06321City permit record | COMBOTI - PHARMACY | Withdrwn | |
| 2019-08-27finaled | T19FO00674City permit record | FIREOPERCOUNSELING SERVICES | Final | |
| 2019-07-11finaled | T19FO00533City permit record | FIREOPERMethadone/Suboxone Clinic | Final | |
| 2019-03-14expired 2019-09-10 | T19OT00245City permit record | Fence / wall1-NON ILLUM WALL SIGN | Expired | |
| 2019-01-08finaled | T19RW00104City permit record | ROWAccess MH #18689 on the NE corner of S Park Ave & E Palmdale St. Access required to splice fiber. | Final | |
| 2018-11-27finaled | T18FO01048City permit record | FIREOPEROutpatient/ Health Care Clinic | Final | |
| 2018-08-13finaled | T18FO00669City permit record | FIREOPERCOUNSELING OFFICE | Final | |
| 2018-06-06finaled | T18FC00474City permit record | FIRECONSINSTALL OF FIRE ALARM SYSTEM | Final | |
| 2018-04-11finaled | T18CM02660City permit record | COMBOOFFICE | L of c | |
| 2017-07-18finaled | T17FO00609City permit record | FIREOPERSTATE LICENSED FACILITY-COUNSELING OFFICE | Final | |
| 2015-02-19expired 2015-09-06 | T15CM01123City permit record | COMBOCHANGE OUT A/C UNITS | Expired | |
| 2014-07-18expired 2015-01-20 | T14OT00938City permit record | Fence / wall1- METAL WALL SIGN | Expired | |
| 2010-06-15finaled | T10OT01299City permit record | SIGN18432 | Final | |
| 2010-04-07finaled | T10OT00756City permit record | C-OF-OC OF O:WAREHOUSE OFFICE | C of o | |
| 2008-10-28expired 2008-12-27 | T08EX00874City permit record | EXCAVEXCA:90' IN DIRT 15' EAST OF CURB ON PARK FOR 2" PVC CONDUIT FOR TIME WARNER | Closed | |
| 2006-10-23expired 2008-02-26 | T06CM05564City permit record | COMBONEW CELL TOWER | Expired | |
| 2004-04-03finaled | T04EL00668City permit record | Electrical reconnectElectrical reconnect | Final | |
| 2003-07-25finaled | T03OT01356City permit record | C-OF-OC OF O:OFFICE | Final | |
| 2003-07-24 | T03AN00719City permit record | ADDRNEW | Issued | |
| 2003-05-30finaled | T03EL01049City permit record | ELECTRECONNECT:ELECTRIC | Final | |
| 2001-07-24finaled | T01CM03615City permit record | COMBOTI:MEDICAL OFFICE | C of o | |
| 2000-08-09finaled | T00BU02380City permit record | BUILDTI:DOCTOR'S OFFICE | C of o | |
| 2000-08-08 | T00AN00602City permit record | ADDRNEW | Issued | |
| 2000-07-21finaled | T00OT00157City permit record | C-OF-OC OF O: OFFICE/WAREHOUSE | Final | |
| 2000-07-21finaled | T00OT00158City permit record | C-OF-OC OF O:OFFICE/WAREHOUSE | Final | |
| 2000-07-11 | T00OT00143City permit record | SITESITE: PARKING CALCULATIONS | Withdrwn | |
| 2000-01-07 | P00AN00076City permit record | ADDRNEW | Issued | |
| 2000-01-07finaled | T00CM00074City permit record | COMBOTI:OFFICE | C of o | |
| 1998-09-16finaled | T98OT00235City permit record | C-OF-OC OF O INSPECTION:CARONDELET MEDICAL GROUP | C of o |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2021-05-21 | T21DV03045Code enforcement case | Code enforcement case | Noverify |
| 2017-06-12 | T17DV02467Code enforcement case | Code enforcement case | Complian |
| 2009-06-18finaled | T09FR01996Code enforcement case | Fire | Complete |
| 2006-07-26finaled | T06FR02317Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 13217118C — 48 permits on file from 1998 to 2026 (10 fireoper, 8 fire operational, 7 combo, 5 c-of-o) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.