Electrical permit history — 905 E Macarthur Ci

905 E Macarthur Ci, Tucson — built 1998, with 22 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

905 E Macarthur Ci

Build year not published — permits on file from 1998 · last permitted panel/service work 2017 (finaled)

Parcel
132166490
Built
1998 (earliest permit on file)
Jurisdiction
Tucson
Zoning
I-1
Assessor use
Misc Commercial
Parcel size
1.80 acres
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2017 permit was finalized; the permit description states “INSTALL NEW 5/8 FULL SERVICE IN ASPHALT; 25 X 35 CUT”.

See the property

County aerial photograph centered on 905 E Macarthur Ci, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2017 (9 years ago). City inspection record: last recorded inspection 2017-12-11; no approved final is shown. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T17RW04881 — INSTALL NEW 5/8 FULL SERVICE IN ASPHALT; 25 X 35 CUT
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2026-07-17 (TC-UTL-0726-00117) — Minor development package revision to DP17-0133. Placing new building in existing yard..

Permit history (22)

Permit history for this parcel — 8 of 22 records
DateRecordWhatStatusValue
2026-07-17TC-UTL-0726-00117City permit recordNew constructionMinor development package revision to DP17-0133. Placing new building in existing yard.In review
2026-07-13TD-DEV-0726-00188City permit recordNew constructionVOID - duplicate permit to TD-DEV-0426-00110 ** Minor development package to place new building, 912 s.f., in existing yard.Void
2026-04-24TD-DEV-0426-00110City permit recordNew constructionMinor development package revision to DP17-0133. Placing new building in existing yard.In review
2024-12-20finaledTR-ROW-1224-01450City permit recordRight-of-Way (ROW)Maintenance permit, At existing Zayo HH locations an extra HH will be placed. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45. 2 Handholes to be placed in sidewalk / concreteComplete
2024-11-26TR-ROW-1124-01376City permit recordRight-of-Way (ROW)Maintenance permit, At existing Zayo HH locations an extra HH will be placed. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45.Needs resubmittal
2024-05-22finaledTR-ROW-0524-00603City permit recordRight-of-Way (ROW)Maintance Permit: possible dig ups, for conduit crushed pipes. At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00.Complete
2024-05-22finaledTR-ROW-0524-00607City permit recordRight-of-Way (ROW)Maintenance permit, At existing Zayo HH locations an extra HH will be placed. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45.Complete
2024-05-21TR-UTL-0524-01021City permit recordRight-of-Way (ROW) - Utility(Denied - Wrong Permit Type.. Please Submit for NEW permit request under "ROW -General"; when submitting please separate documents into Individual File for Upload ( Site/Construction File; Traffic Control Plan File; Supporting/Related Document File), Make sure to also list you Traffic Control Company under the Contacts.) Plan Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45.Void
Show 14 older records
Permit history for this parcel — remaining 14 records
DateRecordWhatStatusValue
2024-04-22TR-ROW-0424-00442City permit recordRight-of-Way (ROW)DENIED - Permit request exceed Mileage distance, does not list relevant Traffic Control or Contractor information.. Submit for NEW PERMITS (not to exceed 1 mile of contagious work area) per permit request. Make sure to reference Local Traffic Control Company for Barricade services, & Reference contractor with AZ ROC that will performing work. Include Traffic plans & Site plans limited to the permits designated work area.... Maintance Permit: possible dig ups, for conduit crushed pipes. At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. resume pulling cable through existing duct to STA 62+00. Place Zayo HH at STA 62+10. Continue cable pull to STA 88+90. Place Zayo HH at 89+00. Resume pull to STA 119+00, to STA 119+10. Continue pull along Euclid ave to STA 142+60 along 36th st. Place Zayo HH at STA 142+70. Continue pull along Park Ave to STA 152+50. Place HH at STA 152+60. Continue pull along Park Ave to STA 172+90, place HH at STA 173+00. Continue pull along, Park ave. STA 192+50. Place Zayo HH at STA 192+60, continue pull to STA 198+90, Place Zayo HH at STA 199+00. Pull cable through existing conduit to STA 226+90, place Zayo HH continue pull to STA 234+45.Void
2024-04-19TD-DEV-0424-00132City permit recordFence / wallGrading Permit Install (N) 190'-0" x 88' -0" fenced with headend for future use. Install (4) (N) fused disconnect for service to (4) (N) distribution panels Install (4) Fiber backhaulWithdrawn
2021-06-10DP21-0143City permit recordDEVPKGSite/Grading - I Smile Dentistry, new medical office.Plan ck
2021-02-26T21CM01713City permit recordCommercial BuildingNew 2600 SF Dental OfficeFees due
2020-11-20finaledT20RW06265City permit recordROWTRENCH DIRT 30 FT, PLACE 2" PVC CONDUIT FOR VERIZON BUSINESS CHANGED ADDRESS LISTED ON APP 4500 S PARK AVFinal
2020-08-17finaledT20RW04658City permit recordROWFrom TEP Pole E of 975 E Macarthur CI, head N and begin 323' aerial overlash 144ct fiber. Head SW 61' and continue aerial overlash 144ct fiber. Head W 1224' and continue aerial overlash 144ct fiber. Head S and continue 1065' aerial overlash 144ct fiber. Riser down pole, head E 10' pull through existing 48ct fiber in to out of ROW.Final
2018-01-11finaledT18RW00218City permit recordROWBore/ trench 1030ft placing 3-1.25 conduits and fiber starting at exist Zayo vault on west side of Park Ave125ft south of Fair Street. North 75ft, northwest 31ft, west 446ft south 117ft. Then also Starting at west side of Park Ave, 36ft north of MacArthur Cir. From here southwest 21ft then west along MacArthur Cir 322ft then north to site 17ft.Final
2017-12-07finaledT17RW05417City permit recordROWTEP WILL PARK ON FAIR ST BEHIND 905 E MACARTHUR CI TO WORK WITH POLE IN ROWFinal
2017-11-01finaledT17RW04881City permit recordROWINSTALL NEW 5/8 FULL SERVICE IN ASPHALT; 25 X 35 CUTFinal
2017-10-31finaledT17RW04841City permit recordROWCHANGE OVERHEAD POWER TO UNDERGROUND IN DIRT SHOULDER AND BORING UNDER SIDEWALKFinal
2017-07-11expired 2018-08-15T17CM05292City permit recordCOMBONEW TELCOM FACILITYExpired
2017-06-12finaledDP17-0133City permit recordDevelopment PackageSITE/GRADING - ZAYO TELECOMComplete
1998-04-07T98CM01470City permit recordCOMBOWAREHOUSEWithdrwn
1998-03-20T98BU00706City permit recordGRADINGGRADING:600 CY CUT & 4600 CY FILLWithdrwn

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2007-10-30T07DV11800Code enforcement caseVegetationComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85714 · Commercial & industrial reports · Homes in 85714 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 132166490 — 22 permits on file from 1998 to 2026 (6 row, 5 right-of-way (row), 3 new construction, 2 combo) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.