Electrical permit history — 4706 S Camino De La Plaza

4706 S Camino De La Plaza

  • Electrical service: no service or distribution permit on record. A 1975 building likely still has its original switchgear.
  • Watch for: built 1975; distribution gear this age is often past manufacturer support.
  • Other work on record: solar added 2024.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Possibly: no service or distribution work is on record for this 1975 building.

  • Electrical service & distributionWorth checkingNo service or distribution permit on record. A 1975 building likely still has its original switchgear. Obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown — worth establishing what is actually installed before a new tenant or a new rooftop unit. Worth knowing: a 2024 solar pv permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalWorth checkingNo permit on record names this system. Worth knowing: a 2024 solar pv permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as Evaporative and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyWorth checkingNo permit on record names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofWorth checkingNo permit on record names this system. The assessor records the roof as Built Up. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear.

  • Worth confirming

    Solar was permitted here in 2024. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Solar and energy potential

Solar was permitted here in 2024 — the arithmetic below is for the whole roof; an existing array changes what is left.

Roof footprint
≈ 2,237 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 1,600 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 15 kW — roughly 40 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 25,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $2,000–$3,500 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “I-10 and Valencia Rd”, is about 2.6 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
132162270
Year constructed
1975 (assessor record — effective construction year, which can move after a major remodel)
Permitting authority
Tucson
Zoning
R-1
Property type
Municipal Residential Property
Building area
1,290 sq ft
Cooling
Evaporative
Heating
Forced Air
Electrical service
No service or distribution permit on record. A 1975 building likely still has its original switchgear. (the era estimate is from the year built, 1975 — not a measurement)

Building area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2024. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 1 building permit for this parcel dated 2024. One solar permit. It carries a final inspection.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 132162270.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All institutional and public property · Commercial property in 85714 · Commercial & industrial reports · Homes in 85714 · Permit data by neighborhood

Planning facility electrical or compliance work here?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on S CAMINO DE LA PLAZA hold 39 City permits on record, 9 of them since 2022.

Counts and years from the same public records.

How this report was built

This is a reading of public records for parcel 132162270 — 1 City permit on file dated 2024 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof and walls on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Aug 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.