Electrical permit history — 1680 E Tucson Marketplace Bl
1680 E Tucson Marketplace Bl, Tucson — built 2025, with 16 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1680 E Tucson Marketplace Bl
Built 2025 — 2020s commercial stock · 16 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 1680 E Tucson Marketplace Bl (aztucsonelectricalsolutions.com/property/132131390/1680-e-tucson-marketplace-bl-tucson-az-85713) · Public records last checked 2026-08-16
- Parcel
- 132131390
- Built
- 2025 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- PAD-15
- Assessor use
- Power Center
- Parcel size
- 3.19 acres
- Building area
- 59,478 sq ft (assessor record)
- Sewer
- Connection on file (2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0626-00387 — Dialer Installation and Programming
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2025-06-06 | $2,163,100 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-07-22 (TC-CFO-0726-00121) — 2nd Party - New construction hotel.
Permit history (16)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-07-22expires 2026-08-27 | TC-CFO-0726-00121City permit record | Certificate of Occupancy2nd Party - New construction hotel | Issued | |
| 2026-06-18finaled | TC-CFO-0626-00108City permit record | Certificate of Occupancy2nd Party - New construction hotel We are requesting level 1 to stock the building with FF&E. This is our subcontractor and no 'hotel' employees will be onsite. | Complete | |
| 2026-06-11finaled | TF-FCP-0626-00387City permit record | Fire ConstructionDialer Installation and Programming | Complete | |
| 2026-06-10 | TR-UTL-0626-00970City permit record | Right-of-Way (ROW) - UtilityPRJ312737-2: Cox to pull thru 1,771' of existing CATV conduit & bore 340' to install new CATV conduit for system tie. | Needs resubmittal | |
| 2026-04-24expires 2026-11-20 | TW-DEVCON-0426-0014City permit record | TW New Area DevelopmentLivAway Suites Hotel - Accepted, Signed & transmitted by NAD. | Inspections | |
| 2026-03-13finaled | TR-UTL-0326-00515City permit record | Right-of-Way (ROW) - UtilityPRJ312737-1: Cox to proof & pull thru 5,300' of existing CATV fiber for system tie. | Complete | |
| 2026-01-20expires 2026-12-26 | TS-PRM-0126-00019City permit record | Sign - PermanentInstall (4) sets of illuminated channel letters | Inspections | |
| 2025-09-24finaled | TF-FCP-0925-00820City permit record | Fire ConstructionInstallation of fire sprinkler system and standpipe in hotel | Complete |
Show 8 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-08-14expired 2026-03-18 | TF-FCP-0825-00661City permit record | Fire ConstructionEXPEDITE - Fire Line Permit | Inspections | |
| 2025-08-13 | TF-FCP-0825-00655City permit record | Fire ConstructionVOID - Submit a Fire Automatic Extinguishing System, Attach 2025 COT Business License & AZROC. Plans need to have installing contractor's information and service address. - Fire line Permit | Void | |
| 2025-07-16finaled | TF-FCP-0725-00576City permit record | Fire ConstructionTitan Alarm to install a fire alarm system | Complete | |
| 2025-06-13 | TZ-PMT-0625-00057City permit record | Zoning Permit AnnualTemporary use permit is for a job trailer, the job trailer will be onsite during the course of construction. | Expired | |
| 2025-02-13finaled | TZ-CMP-0225-00025City permit record | Zoning Verification LetterI need a zoning verification letter for the property located at 1680 E. Tucson Marketplace Blvd., Tucson, Arizona (parcel no: 132-13-074B). | Complete | |
| 2025-01-30finaled | TC-COM-0125-00202City permit record | Commercial Building2nd Party - New construction hotel | Complete | |
| 2025-01-07finaled | TD-DEV-0125-00003City permit record | Development PackageLivAway Suites Hotel | Complete | |
| 2024-10-09 | TR-ROW-1024-01186City permit record | Right-of-Way (ROW)This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. | Void |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 132131390 — 16 permits on file from 2024 to 2026 (5 fire construction, 2 certificate of occupancy, 2 right-of-way (row) - utility, 1 tw new area development) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
