Electrical permit history — 1102 E 36th St

1102 E 36th St, Tucson — built 2022, with 58 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

1102 E 36th St

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 2022 — 2020s multifamily stock · 58 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service work shows in the record we read — unremarkable for a building of this age, whose service was sized to modern code at construction. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyFinaled permit foundLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00297 — Fire Alarm & Detection Systems - NEW FIREA ALARM SYSTEM; Fire Alarm Systems - New Sq Ft: 184141; Fire Alarm Systems - # New Stories: 1
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    A trade permit was pulled in 2021. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 61,563 sq ft (assessor’s building area ÷ recorded stories — approximate)
Usable for solar, planning estimate
≈ 43,100 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 470 kW — roughly 1,180 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 770,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$62,000–$100,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 1.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
132131370
Year constructed
2022 (assessor record)
Permitting authority
Tucson
Zoning
PAD-15
Property type
Apartments 25 - 99 Units 3 Or More Story
Building area
184,689 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air

The building area, cooling and heating above come from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 58 building permits for this parcel dated between 2007 and 2025. By category the work is right-of-way (row) permit - general (8), fire automatic extinguishing system (8), development package (7) and temporary certificate-of-occupancy (tco) (6). 28 of them carry a final inspection; the other 30 were issued, expired or are still open, which is not the same as work completed. There is 1 code-enforcement case recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 132131370. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85713 · Commercial & industrial reports · Homes in 85713 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E 36TH ST hold 834 City permits on record, 270 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (59 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2025TZ-CMP-1225-00229Zoning ComplianceComplete
2024recordRight-of-Way (ROW) Permit - GeneralComplete
2024recordRight-of-Way (ROW) Permit - GeneralVoid
2024recordRight-of-Way (ROW) Permit - GeneralVoid
2024recordRight-of-Way (ROW) Permit - GeneralInspections
2024recordRight-of-Way (ROW) Permit - UtilityComplete
2024recordRight-of-Way (ROW) Permit - GeneralComplete
2024recordRight-of-Way (ROW) Permit - GeneralIssued
2024recordRight-of-Way (ROW) Permit - GeneralComplete
2024recordRight-of-Way (ROW) Permit - GeneralComplete
2024recordRight-of-Way (ROW) Permit - UtilityVoid
2024recordRight-of-Way (ROW) Permit - UtilityVoid
2024recordRight-of-Way (ROW) Permit - UtilityVoid
2024DP20-0045Development PackageComplete
2024recordRight-of-Way (ROW) Permit - UtilityComplete
2023TC-CFO-0723-00091Temporary Certificate-of-Occupancy (TCO)Issued
2023TC-CFO-1123-00227Temporary Certificate-of-Occupancy (TCO)Denied
2023TC-CFO-1123-00229Temporary Certificate-of-Occupancy (TCO)Canceled
2023T21CM04378Commercial New Building PermitComplete
2023TC-CFO-1123-00210Temporary Certificate-of-Occupancy (TCO)Issued
2023TC-CFO-1023-00202Temporary Certificate-of-Occupancy (TCO)Issued
2023TC-CFO-0723-00096Temporary Certificate-of-Occupancy (TCO)Issued
2023TC-RES-0323-04014Residential Trade PermitExpired
2023recordROW Permit - Residential Temporary UseComplete
2022T22CM05033Commercial New Building PermitComplete
2022recordROW Permit - Residential Temporary UseVoid
2022T22FC00619Fire Automatic Extinguishing System PermitComplete
2022T22FC00618Fire Automatic Extinguishing System PermitComplete
2022T22FC00617Fire Automatic Extinguishing System PermitComplete
2022T22FC00462Fire Automatic Extinguishing System PermitComplete
2022T22BU00247Commercial Pool/Spa PermitComplete
2022T22OT00427Permanent Sign PermitComplete
2022T22FC00297Fire Alarm System PermitComplete
2021T21FC00895Fire Automatic Extinguishing System PermitComplete
2021T21FC00898Fire Automatic Extinguishing System PermitComplete
2021T21FC00896Fire Automatic Extinguishing System PermitComplete
2021T21FC00897Fire Automatic Extinguishing System PermitComplete
2021T21CM04377Commercial New Building PermitComplete
2021T21CM04376Commercial New Building PermitComplete
2021T21CM04334Commercial New Building PermitComplete
2021DP21-0078Development PackageComplete
2021T21CM05591Commercial Trade PermitComplete
2021T21PRE0156Pre-Application ConferenceCanceled
2020T20PRE0166Pre-Application ConferenceCanceled
2020T20PI00008Private Improvement AgreementApproved
2020DP20-0127Development PackageAwaiting Submittal
2020T20DV02773ENVIRONMENTALNOVERIFY
2020DP20-0083Development PackageApproved
2019S19-063Subdivision/PlatsApproved
2019T19PRE0157Pre-Application ConferenceCanceled
2019S19-059 Land Split/Lot SplitComplete
2019DP19-0081Development PackageIssued
2019T19OT00322Floodplain Use PermitSubmitted
2018T18PI00033Private Improvement AgreementIn Review
2018T18PRE0008Pre-Application ConferenceCanceled
2016S16-034 Subdivision/PlatsWithdrawn
2015DP15-0224Development PackageApproved
2012DP12-0065 Development PackageWithdrawn
2007C9-06-32 RezoningEffectuated

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 132131370 — 58 City permits on file from 2007 to 2025 and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area, cooling, heating, roof, walls on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.