Electrical permit history — 1500 E Tucson Marketplace Bl
1500 E Tucson Marketplace Bl, Tucson — built 2025, with 32 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1500 E Tucson Marketplace Bl
Built 2025 — 2020s commercial stock · 32 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 1500 E Tucson Marketplace Bl (aztucsonelectricalsolutions.com/property/132131290/1500-e-tucson-marketplace-bl-tucson-az-85713) · Public records last checked 2026-08-16
- Parcel
- 132131290
- Built
- 2025 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- PAD-15
- Assessor use
- Power Center
- Parcel size
- 12.84 acres
- Building area
- 100,913 sq ft (assessor record)
- Sewer
- Connection on file (2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0126-00022 — Need to install fire line to connect to fire suppression system.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2025-07-16 | $10,100,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-05-22 (TC-CFO-0526-00095) — PLEASE PAY TCO EXTENSION FEE UNDER TC-CFO-0326-00059. ONCE PAID TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 06/26/26. PLEASE REQUEST TCO EXTENSION UNDER TC-CFO-0326-00059 IN JUNE PRIOR TO 06/26/2026 IF NEEDED. Revision 4: 2/26/26 Ground Up Retail Building.
Permit history (32)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-05-22finaled | TC-CFO-0526-00095City permit record | Certificate of OccupancyPLEASE PAY TCO EXTENSION FEE UNDER TC-CFO-0326-00059. ONCE PAID TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 06/26/26. PLEASE REQUEST TCO EXTENSION UNDER TC-CFO-0326-00059 IN JUNE PRIOR TO 06/26/2026 IF NEEDED. Revision 4: 2/26/26 Ground Up Retail Building | Complete | |
| 2026-04-24finaled | TC-CFO-0426-00078City permit record | Certificate of OccupancyTCO EXTENSION- PLEASE PAY TCO FEES UNDER TC-CFO-0326-00059 Revision 4: 2/26/26 Ground Up Retail Building | Complete | |
| 2026-04-24 | TW-DEVCON-0426-0009City permit record | TW New Area DevelopmentBass Pro Shops Outdoor World - 1st Revision - 2nd submittal | Inspections | |
| 2026-04-09expires 2026-11-03 | TS-PRM-0426-00125City permit record | Sign - PermanentInstall 3 lighted signs onto existing pylon sign. | Issued | |
| 2026-04-06finaled | TF-FOP-0426-00454City permit record | Fire OperationalExplosive Permit | Complete | |
| 2026-03-27expires 2026-08-26 | TC-CFO-0326-00059City permit record | Certificate of OccupancyPLEASE PAY TCO FEE TC-CFO-0326-00059. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30 DAYS AND WILL EXPIRE 08/26/26. Please request TCO extension in AUGUST Prior to 08/26/26 if needed. Revision 4: 2/26/26 Ground Up Retail Building | Issued | |
| 2026-03-25finaled | TC-CFO-0326-00058City permit record | Certificate of OccupancyRevision 4: 2/26/26 Ground Up Retail Building | Complete | |
| 2026-03-20finaled | TF-FOP-0326-00395City permit record | Fire OperationalThis is for the flammable and combustible permit that we were asked to apply for. | Complete |
Show 24 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-02-16expires 2026-09-28 | TS-PRM-0226-00056City permit record | Sign - PermanentInstall two painted murals on roof | Issued | |
| 2026-02-09finaled | TC-CFO-0226-00036City permit record | Certificate of OccupancyLEVEL CHANGE- PAY TCO FEES UNDER TC-CFO-0326-00058 Ground Up Retail Building | Complete | |
| 2026-01-16finaled | TR-UTL-0126-00107City permit record | Right-of-Way (ROW) - UtilityP.371300 - ACCESS EXISTING MH 19280, HH 21670, MH 21961, MH 22931 FOR SPLICING | Complete | |
| 2026-01-14finaled | TF-FCP-0126-00022City permit record | Fire ConstructionNeed to install fire line to connect to fire suppression system. | Inspections complete | |
| 2026-01-09expires 2026-09-08 | TC-COM-0126-00037City permit record | Commercial BuildingModifications of existing electrical distribution to provide power to new store fixtures. | Inspections | |
| 2026-01-08 | TC-COM-0126-00030City permit record | Trade permitVOID: DS – Wrong Permit Type. We were unable to process your request for internal store fixture under a Commercial Trade Permit. The scope requires that this permit be submitted under a Commercial Addition Alteration Permit. This permit will be voided. For questions please contact Drew.Szentesy@tucsonaz.gov or Building_Official@tucsonaz.gov Modification of existing electrical distribution to provide power to new store fixtures. | Void | |
| 2026-01-02finaled | TS-PRM-0126-00001City permit record | Fence / wallInstall 13 illuminated wall signs and 4 non-illuminated wall signs. | Inspections complete | |
| 2025-12-17finaled | TF-FCP-1225-01039City permit record | Fire ConstructionADDING CELLULAR DIALER TO AN EXISTING SYSTEM | Complete | |
| 2025-12-15expires 2026-08-22 | TC-COM-1225-02258City permit record | Commercial BuildingInstallation of Back of House Racking and shelving out of Customer Touch | Issued | |
| 2025-09-18expires 2027-07-01 | TC-COM-0925-01704City permit record | Commercial BuildingInfill installation of 5 EV chargers in parking lot and Canopy | Issued | |
| 2025-07-22 | TZ-CMP-0725-00132City permit record | Zoning Verification LetterZoning letter for 1500 E Tucson Marketplace Blvd | Void | |
| 2025-06-26finaled | TF-FCP-0625-00513City permit record | Fire ConstructionClimatec, LLC is pleased to provide this Turnkey (TK) proposal for the new Fire Alarm System for the ‘Bass Pro-Shops Outdoor World’ project. | Complete | |
| 2025-06-13expired 2026-03-05 | TF-FCP-0625-00477City permit record | Fire ConstructionInstall a new wet sprinkler system to meet NFPA 13 city codes and regulations. | Inspections | |
| 2025-04-07expired 2026-06-15 | TC-UTL-0425-00026City permit record | Pool / spaGround up development for new retail store. REV1_Sewer Line Revisions-The proposed sewer line was revised from an 8-inch to a 6-inch diameter pipe. Cleanout and Manhole Modifications-The spacing for sewer cleanouts was adjusted to at least 100 feet between each cleanout. Manholes were updated to incorporate a 6-inch wye connection and a cleanout. | Inspections | |
| 2024-10-09 | TR-ROW-1024-01186City permit record | Right-of-Way (ROW)This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. | Void | |
| 2024-08-16finaled | TD-DEV-0824-00235City permit record | Development PackageGrading permit only for a new commercial ground up retail project | Complete | |
| 2024-06-14expires 2027-08-10 | TC-COM-0624-01147City permit record | Commercial BuildingRevision 4: 2/26/26 Ground Up Retail Building | Issued | |
| 2024-04-29expires 2029-04-30 | TD-DEV-0424-00140City permit record | Development PackageRev 1 - EV units, parking log, sewer update, started 12.22.2025 ** Ground up development for new retail store. | Issued | |
| 2022-12-07applied 2021-10-20 · finaled 2023-06-27 | T21OT00827Sign | Permanent Sign(called "monument 2") 1 monument sign at 60 sqft per SDRC case (for SE corner of MLK and Tucson Mark | Complete | |
| 2022-12-01 | TS-PRM-1222-00052Sign | Permanent SignNew Monumnet under approved master sign program T22SA00048 | Fees Due | |
| 2022-12-01 | TS-PRM-1222-00051Sign | Permanent SignNew monument sign as approved under master sign program | Fees Due | |
| 2020-04-07finaled | DP20-0073City permit record | Development PackageSITE/GRADING/SWPPP - Woodspring Suites at Tucson Marketplace. | Complete | |
| 2019-03-04finaled | DP19-0054City permit record | Development PackageSITE/GRADING/SWPPP - Shops E2, Tucson Marketplace, Phase 6. | Complete | |
| 2015-10-08 | DS15-24Design modification | Zoning Verification LetterTSMR - TSMR TS 7-01.4.3.C modify material for a temporary sidewalk | Approved |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 132131290 — 32 permits on file from 2015 to 2026 (5 certificate of occupancy, 4 fire construction, 4 commercial building, 4 development package) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).