Electrical permit history — 3460 S Kino Pw

3460 S Kino Pw, Tucson — built 2021, with 23 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3460 S Kino Pw

Build year not published — permits on file from 2021 · 23 permits on record; no permitted panel/service or HVAC work among them

Parcel
132131260
Built
2021 (earliest permit on file)
Jurisdiction
Tucson
Zoning
PAD-15
Assessor use
Power Center - Restaurant
Parcel size
1.05 acres
Sewer
Connection on file (2024) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 3460 S Kino Pw, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0723-00849 — Installation of commercial kitchen fire suppression system
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2025-09-16 (TZ-CMP-0925-00165) — Please list all of the parcels in the letter..

Permit history (23)

Permit history for this parcel — 8 of 23 records
DateRecordWhatStatusValue
2025-09-16finaledTZ-CMP-0925-00165City permit recordZoning Verification LetterPlease list all of the parcels in the letter.Complete
2024-04-18finaledTR-ROW-0424-00430City permit recordRight-of-Way (ROW)The contractor will be swapping out old sensor cameras & replacing them with new modern traffic sensor cameras for vehicular traffic for the City of Tucson for Abel Rosales. Walkways for pedestrians will be available. Will be working for one hour at the intersection. One day job.Complete
2023-07-10finaledTF-FCP-0723-00849City permit recordFire ConstructionInstallation of commercial kitchen fire suppression systemComplete
2023-06-21finaledTF-FCP-0623-00792City permit recordFire ConstructionADDING SINGLE MODULE FOR ANSUL HOOD MONITORINGComplete
2023-06-20finaledTF-FCP-0623-00785City permit recordFire ConstructionEXPEDITE-Add 29 Sprinklers To New TIComplete
2023-03-15finaledTC-CFO-0323-00043City permit recordCertificate of OccupancyTI: FIRST WATCH; We are requesting a level 4 TCO based upon comments from Fire that duct detectors need to be monitored by the fire alarm. This will need re-engineering and resubmittal by our FA contractor.Complete
2023-02-14finaledTF-FCP-0223-00392City permit recordFire ConstructionTie-in of new devices to existing fire alarm systemComplete
2023-02-10finaledTF-FCP-0223-00388City permit recordFire ConstructionEXPEDITE - Kitchen fire suppression system installComplete
Show 15 older records
Permit history for this parcel — remaining 15 records
DateRecordWhatStatusValue
2023-01-18finaledTF-FCP-0123-00305City permit recordFire ConstructionFIRE SPRINKLER (TI)Complete
2023-01-18finaledTS-PRM-0123-00136City permit recordSign - PermanentInstall 6 sets of exterior illuminated building signsComplete
2022-12-30expired 2023-06-28TC-COM-1222-00390City permit recordCommercial Building70 VOLT SPEAKER SYSTEM FOR BACKGROUND MUSICExpired
2022-12-22expired 2023-06-20TC-COM-1222-00351City permit recordCommercial BuildingVOIDED DUPLICATE PERMIT USE PERMIT TC-COM-1222-00390 70 VOLT SPEAKER SYSTEM FOR BACKGROUND MUSICVoid
2022-12-22expired 2023-06-20TC-COM-1222-00353City permit recordCommercial BuildingHood fire systems installationVoid
2022-10-06finaledT22FC00691City permit recordFire ConstructionAutomatic Fire Extingshing Sys - NFP to provide a new fire sprinkler system to the new Shell Bldg. #9.Complete
2022-08-08finaledT22FC00548City permit recordNew constructionUnderground fire line for new building (Lot 9).Final
2022-04-20finaledT22OT00286City permit recordFence / wallWall signs / Mod PizzaComplete
2022-03-21DP22-0062City permit recordDEVPKGSite - First Watch, The Daytime Cafe. Tenant build-out. New interior partitions, new HVAC, electrical, and mechanical systems, new commercial kitchen equipment, and new interior finishes and furnishings, patio railings and furniture. Shell and structural system are existing.Void
2022-03-14finaledT22CM01860City permit recordCommercial BuildingTI: FIRST WATCHComplete
2022-03-03finaledT22CM01564City permit recordCommercial BuildingPrivate Sewer for Lots 6/8/9Complete
2022-03-01finaledT22CM01462City permit recordPool / spaTENANT IMPROVEMENT OF A FIRST-TIME BUILD-OUT INTERIOR SPACE IN A NEW MULTI-TENANT SINGLE-LEVEL BUILDComplete
2021-10-12finaledT21CM08081City permit recordCommercial BuildingNew Retail Bldg 9 - 3 bldgs same set of plans separate apps being provided, plans being uploaded oncComplete
2021-08-17expires 2027-06-26DP21-0213City permit recordDevelopment Package*Revision #3 (plumbing) started 6/21/2024* Site/Grading/Swppp - The Bridges Sub-Area B-3, Lots 6,8, and 9.Issued
2021-07-28finaledT21RW03536City permit recordROWINSTALL NEW TURN LANE AND ENTRANCE ALONG S KINO PW JUST SOUTH OF E TUCSON MARKETPLACE BL WORK ASSOCIATED WITH T20PI00004Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 132131260 — 23 permits on file from 2021 to 2025 (7 fire construction, 6 commercial building, 1 zoning verification letter, 1 right-of-way (row)) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).