Electrical permit history — 3358 E 36th St
3358 E 36th St, Tucson — built 1958, with 15 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
3358 E 36th St
Built 1958 — 1950s commercial stock · last permitted panel/service work 2025 (finaled); a newer 2026 permit is issued
Permanent link: Electrical permit history for 3358 E 36th St (aztucsonelectricalsolutions.com/property/13205006a/3358-e-36th-st-tucson-az-85713) · Public records last checked 2026-08-16
- Parcel
- 13205006A
- Built
- 1958 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- I-2
- Assessor use
- Warehousing
- Parcel size
- 5.95 acres
- Building area
- 12,204 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2025 permit was finalized; the permit description states “New electrical service (all open permits are completed and awaiting COT processing of closeout documents)”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentA newer 2026 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “200 amp 480v disconnect replacement. Like-for-like replacement.”. Last permitted 2025 (1 year ago). City inspection record: COT - LCME - Mechanical Final approved 2026-02-02. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-0225-00396 — New electrical service (all open permits are completed and awaiting COT processing of closeout documents)
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2019-05-02 | $300,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-02-04 (TC-COM-0226-00165) — 200 amp 480v disconnect replacement. Like-for-like replacement..
Permit history (15)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-02-04expires 2026-08-17 | TC-COM-0226-00165City permit record | Commercial Building200 amp 480v disconnect replacement. Like-for-like replacement. | Inspections | |
| 2026-01-15 | TC-COM-0126-00061City permit record | Commercial BuildingVOID - DUPLICATE PERMIT, CONTINUE WITH EXISTING PERMIT TC-COM-0225-00396 200 amp 3 phase 480v fused disconnect replacement | Void | |
| 2025-06-30finaled | TC-COM-0625-01277City permit record | Commercial BuildingConcrete slab only for securing equipment | Complete | |
| 2025-06-19finaled | TD-DEV-0625-00166City permit record | Development PackageNew concrete pad in the north center of the site | Complete | |
| 2025-02-27finaled | TC-COM-0225-00396City permit record | Commercial BuildingNew electrical service (all open permits are completed and awaiting COT processing of closeout documents) | Complete | |
| 2024-05-13finaled | TR-UTL-0524-00963City permit record | Right-of-Way (ROW) - UtilityPRJ269816-1 COX TO OVERLASH 121' OF AERIAL FIBER, TRENCH 8' AND BORE 145' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE IN. | Complete | |
| 2023-03-21finaled | TC-COM-0323-00842City permit record | New construction(STORAGE) NEW BUILDING #4 AREA=4,000 SF HEIGHT=16' | Complete | |
| 2022-09-12finaled | T22RW03390City permit record | Right-of-Way (ROW)NEW DRIVEWAY; Work Order: DP20-0208 | Complete |
Show 7 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-03-30expired 2023-04-26 | T22OT00240City permit record | Sign - Permanent1-non illum post & panel | Expired | |
| 2021-11-24 | DS21-16City permit record | Zoning Verification LetterDesert Metals - TSMR - Desert Metals. TSM Section 7-01.4.3.C. (Pedestrian path). | Approved | |
| 2021-06-17finaled | T21RW02914City permit record | ROWINSTALL NEW SERVICE IN DIRT EASEMENT @ 4 LF., POSTED AREA NOT IN ROAD / ASPHALT IN FRONT OF POSTED ADDRESS. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. | Final | |
| 2021-05-19finaled | T21CM04309City permit record | Commercial BuildingSite Utilities | Complete | |
| 2021-05-11finaled | T21RW02303City permit record | ROWDESERT METALS, DP20-0208 EXCAVATION FOR NEW SEWER MAIN FOR DESERT METALS PER DP20-0208, APPROX, 20 LF IN DIRT. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | Final | |
| 2020-10-30finaled | T20CM07528City permit record | Commercial BuildingElectrical & Site Electrical for future Modular | Complete | |
| 2020-10-13finaled | DP20-0208City permit record | Development PackageSite/Grading - Desert Metals, commercial storage building. | Complete |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 13205006A — 15 permits on file from 2020 to 2026 (6 commercial building, 2 development package, 2 row, 1 right-of-way (row) - utility) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
