Electrical permit history — 5632 E 26th St

5632 E 26th St, Tucson — built 1958, with 11 permits on record. Review electrical, HVAC and remodel history with links to official records.

Multifamily property

5632 E 26th St

Built 1958 — 1950s multifamily stock · last permitted panel/service work 2013 (finaled)

Parcel
131091860
Built
1958 (county record)
Jurisdiction
Tucson
Zoning
R-2
Assessor use
Apartments 5 - 24 Units 1 Story
Parcel size
0.46 acres
Building area
4,349 sq ft (assessor record)
Sewer
Connection on file (1963) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2013 permit was finalized; the permit description states “REPLACE BROKEN 100 AMP ELECTRICAL DISCONNECT”.

See the property

County aerial photograph centered on 5632 E 26th St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2013 (13 years ago). City inspection record: ELECTRIC - FINAL approved 2013-01-16. Contractor of record: BUCHANAN ELECTRIC INC ,. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T13CM00222 — REPLACE BROKEN 100 AMP ELECTRICAL DISCONNECT
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    There is an electrical reconnect permit from 2017. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2007-05-31$850,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2025-07-16 (TC-COM-0725-01376) — Unit 9 was tagged by SW gas, found house line failed pressure test. Will run 1" gas from meter to wall approx 12ft up wall and onto roof. From roof run distribution towards water heater and furnace in closet..

Permit history (11)

Permit history for this parcel — 8 of 11 records
DateRecordWhatStatusValue
2025-07-16expired 2026-02-02TC-COM-0725-01376City permit recordFence / wallUnit 9 was tagged by SW gas, found house line failed pressure test. Will run 1" gas from meter to wall approx 12ft up wall and onto roof. From roof run distribution towards water heater and furnace in closet.Inspections
2025-07-16TC-COM-0725-01377City permit recordFence / wallVOID- DUPLICATE PERMIT; CONTINUE WITH EXISTING PERMIT TC-COM-0725-01376 Unit 9 was tagged by SW gas, found house line failed pressure test. Will run 1" gas from meter to wall approx 12ft up wall and onto roof. From roof run distribution towards water heater and furnace in closetVoid
2019-01-07finaledT19CM00096City permit recordCOMBOGAS LINE REPLACEMENTFinal
2017-05-03finaledT17CM03502City permit recordElectrical reconnectELECTRICAL RECONNECTFinal
2017-05-03finaledT17CM03503City permit recordElectrical reconnectELECTRICAL RECONNECTFinal
2014-07-18finaledT14CM04549City permit recordCOMBOGAS LINEFinal
2014-01-08finaledT14CM00149City permit recordCOMBORECONNECT ELECTRIC; APTS R1: REPL BREAKER BOXFinal
2013-01-14finaledT13CM00222City permit recordCOMBOREPLACE BROKEN 100 AMP ELECTRICAL DISCONNECTFinal
Show 3 older records
Permit history for this parcel — remaining 3 records
DateRecordWhatStatusValue
2008-05-20finaledT08PL00833City permit recordPLUMBREPLACE: GASLINE (APA) R1: NEEDS PLANS PER INSPECTORFinal
2004-08-30expired 2005-02-27T04EL01787City permit recordELECTUPGRADE:ELECTRIC TO 100 AMPExpired
2004-07-22finaledT04PL01300City permit recordPLUMBRREPLACE:GAS LINEFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 131091860 — 11 permits on file from 2004 to 2025 (4 combo, 2 fence / wall, 2 electrical reconnect, 2 plumb) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.