Electrical permit history — 4220 E 22nd St

4220 E 22nd St, Tucson — built 2008, with 40 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

4220 E 22nd St

Built 2008 — 2000s commercial stock · 40 permits on record; no permitted panel/service or HVAC work among them

Parcel
13014023A
Built
2008 (county record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Auto/Light Truck Dealership
Parcel size
9.66 acres
Building area
49,729 sq ft (assessor record)
Sewer
Connection on file (2026) (county sewer connection records)
Flood zone
X (shaded) — 0.2% annual-chance flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 4220 E 22nd St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2008 spklr permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2008 spklr permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyGetting onA newer 2026 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “Fire sprinkler Tenant Improvement for Existing Building and a new sprinkler system for new Express Service Building. U.G. by others.”. Last permitted 2008 (18 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T08BU01188 — Install 279 fire sprinklers
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
1998-02-23$3,300,000Special Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2026-07-06 (TR-UTL-0726-01095) — Installing a 1" service with meter and box.

Permit history (40)

Permit history for this parcel — 8 of 40 records
DateRecordWhatStatusValue
2026-07-06expires 2026-09-27TR-UTL-0726-01095City permit recordRight-of-Way (ROW) - UtilityInstalling a 1" service with meter and boxInspections
2026-06-04expires 2026-12-29TF-FCP-0626-00379City permit recordFire ConstructionPROVIDE AND INSTALL REQUIRED FIRE LIFE SAFETY DEVICES FOR THE CONTINUED PROTECTION AT LHM. DEVICES LOCATED OUTSIDE THE SCOPE OF WORK ARE EXISTING AND TO REMAIN UNCHANGED. A NEW FACU AND CELLULAR DIALER WILL BE INSTALLEDIn revision
2026-04-24expires 2026-12-28TF-FCP-0426-00266City permit recordFire ConstructionFire sprinkler Tenant Improvement for Existing Building and a new sprinkler system for new Express Service Building. U.G. by others.Inspections
2026-04-20expired 2026-06-05TR-ROW-0426-00452City permit recordRight-of-Way (ROW)The project is for the LHM CDRFJ Tucson dealership. We are tying into the existing sewer main / system for a business connection sewer. 07/09/26 - Denied extension due to permit expired on 06/05/26.Needs resubmittal
2025-12-05TE-FPU-1225-00451City permit recordAddition / alterationSite drawings are submitted under a separate permit: TD-DEV-0425-00111 The site development drawings contain information on site grading. This project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. The scope of work includes a new Express Service building with service, wet and dry detail bays.Needs resubmittal
2025-10-16expired 2026-05-24TF-FCP-1025-00911City permit recordFire ConstructionInstall 6" C-990 PCV water line polywrapped with racer wire.Inspections
2025-08-29expires 2027-02-09TC-UTL-0825-00075City permit recordUtilitiesExpansion of the existing Larry H. Miller automotive dealership with a new service drive, Jeep showroom, and new vehicle delivery along with a new 12,000 sf service building.Inspections
2025-05-21expires 2027-08-16TC-COM-0525-01025City permit recordNew constructionThis project is a renovation of an existing Chrysler Dodge Ram Fiat dealership. The work includes the addition of a separate Jeep showroom and the enclosure of two existing canopies to create an interior Service Drive and New Vehicle Delivery, respectively. Interior customer-facing areas will receive a reconfigured floor plan, new finishes, and new lighting. Back-of-house updates include a new owner-provided parts storage platform in the existing parts area, and renovated tech locker rooms. The scope of work includes a new Express Service building with service, wet and dry detail bays. This includes restrooms, lockers, and breakroom for the shop staff. This building is considered as part of Unlimited Area Building described in the code analysis and is fully sprinklered. Exterior site improvements and building signage to be submitted under a separate permit. 75,895 sf is the entire existing + new building square footage, including the new express building. Site drawings are submitted under a separate permit: TD-DEV-0425-00111Revision fees due
Show 32 older records
Permit history for this parcel — remaining 32 records
DateRecordWhatStatusValue
2025-04-10expires 2029-06-22TD-DEV-0425-00111City permit recordDevelopment PackageExpansion of the existing Larry H. Miller automotive dealership with a new service drive, Jeep showroom, and new vehicle delivery along with a new 12,000 sf service building.Inspections
2024-04-18TR-UTL-0424-00824City permit recordRight-of-Way (ROW) - Utilitywo#2678502 4220 e 22nd st 14-14-15 sw replace hydrant n/sd of lot dirt 6LF/scNeeds resubmittal
2023-10-31finaledTR-UTL-1023-02851City permit recordRight-of-Way (ROW) - Utility2678502 4220 E. 22nd St 14-14-15SW Replace broken hydrant north west corner of the lot on sidewalk; 6lf concrete and dirt; MLMComplete
2023-10-16expired 2024-04-13TC-COM-1023-02427City permit recordCommercial BuildingDisconnect 4 old swamp coolers and connect 4 new AC units as per attached planExpired
2023-07-20expired 2024-08-03TC-COM-0723-01787City permit recordCommercial BuildingReplacing swamp coolers with refrigerated air units.Issued
2020-01-27finaledT20RW00484City permit recordRight-of-Way (ROW)20R0206 - REPAIR LEAKING SERVICE - APPROX 4' LF IN ASPHALT OFF OF COLUMBUS RD.EMERGENCY - AFTER; Work Order: 20R0206Complete
2019-09-23finaledT19RW05514City permit recordROWSTARTING ON THE S/W CORNER OF S. COLUMBUS BLVD AND E. 22ND ST AT TEP POLE, OVERLASH 288 CT FIBER GOING SOUTH 2290' EAST 2616', NORTH 1480', EAST 826' TIE IN A NOTICE OF TEMPORARYHOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON. WORK ON COLUMBUS BLVD & SWAN RD SHALL BE 9:00AM TO 3:30PMFinal
2014-12-30finaledT14TC03513City permit recordBARRICADMedian, Central & Graffiti Daily 12-29-14Final
2014-12-24finaledT14TC03405City permit recordBARRICADMedian, Central & Graffiti Daily 12-22-14Final
2014-12-24finaledT14TC03408City permit recordBARRICADMedian, Central & Graffiti Daily 12-23-14Final
2014-12-24finaledT14TC03412City permit recordBARRICADMedian, Central & Graffiti Daily 12-24-14Final
2014-12-23finaledT14TC03386City permit recordBARRICADMedian, Central & Graffiti Daily 12-18-14Final
2014-12-17finaledT14TC03324City permit recordBARRICADMedian, Central & Graffiti Daily 12-17-14Final
2014-12-15finaledT14TC03254City permit recordBARRICADMedian, Central & Graffiti Daily 12-05-14Final
2014-12-12finaledT14TC03246City permit recordBARRICADMedian, Central and Graffiti Daily 12-04-14Final
2013-08-16finaledT13OT00969City permit recordFence / wall3- C OF C ON DP'S / REMOVE OLD SIGNAGE / REPLACE W/ NEW ILLUM WALL SIGNS.Final
2011-10-27expired 2011-12-26T11EX00567City permit recordEXCAVTRENCH 20 LF TO PLACE 2" CONDUITClosed
2010-05-24finaledT10OT01117City permit recordSIGN18391 (Article 8 reduction of existing nonconforming pole sign - by 20% in height and sign area)Final
2009-03-09finaledT09OT00483City permit recordSIGN16392Final
2009-03-04finaledT09OT00451City permit recordSIGN16382Final
2009-03-04expired 2009-04-09T09OT00452City permit recordSIGN16381Closed
2008-11-24expired 2009-08-25T08OT02774City permit recordSIGN15953Expired
2008-10-03finaledT08CM03269City permit recordCOMBOSTORAGE RACKSFinal
2008-08-18expired 2008-10-17T08EX00664City permit recordEXCAVSIDEWALKClosed
2008-07-15expired 2008-09-13T08EX00582City permit recordEXCAV60 LF OF SIDEWALK & CURBClosed
2008-06-30finaledT08BU01188City permit recordSPKLRInstall 279 fire sprinklersFinal
2008-03-20finaledT08BU00545City permit recordSPKLRInstall 243 fire sprinklersFinal
2008-02-07expired 2008-04-07T08EX00123City permit recordEXCAVClosed
2007-11-26finaledT07BU02474City permit recordSPKLRFire UndergroundFinal
2007-11-26expired 2008-01-25T07EX01212City permit recordEXCAVEXCAV:CUT IN PAVEMENT FOR WATER AND SEWERClosed
2007-10-09expired 2007-12-08T07EX01092City permit recordEXCAVTRENCH 9'P & 20'D (INSTALL 6" FIRE SERVICE ON SOUTClosed
2007-10-08finaledT07OT02288City permit recordSIGN13833Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (5)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 5 of 5 records
DateRecordWhatStatus
2014-02-19T14DV00985Code enforcement caseCode enforcement caseComplian
2011-04-12T11DV02477Code enforcement caseSignNoverify
2010-08-09T10DV05226Code enforcement caseCode enforcement caseComplian
2008-12-10T08DV11257Code enforcement caseRefuseNoverify
2007-09-24T07DV09703Code enforcement caseCode enforcement caseCancel

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 13014023A — 40 permits on file from 2007 to 2026 (8 barricad, 6 excav, 6 sign, 3 right-of-way (row) - utility) and 5 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).