Electrical permit history — 1525 S Columbus Bl
1525 S Columbus Bl, Tucson — built 1988, with 34 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Commercial property
1525 S Columbus Bl
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 1988 — 1980s commercial stock · HVAC 2023 (finaled); a newer 2024 permit is issued
Permanent link: Electrical permit history for 1525 S Columbus Bl (aztucsonelectricalsolutions.com/property/13014005a/1525-s-columbus-bl-tucson-az-85711) · Public records last checked 2026-08-22
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalFinaled permit foundA newer 2024 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “in the classroom building we are expanding four classrooms as well as replacing and adding new HAVC rooftop units. in the child care building we are adding three new ADA restrooms.”. Last permitted 2023 (3 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-COM-0623-01545 — in the classroom building we are expanding four classrooms as well as replacing and adding new HAVC rooftop units. in the child care building we are adding three new ADA restrooms.
- Fire alarm & life safetyFinaled permit foundLast permitted 2021 (5 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00316 — Installation of Buckeye Fire Suppression System
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Solar was permitted here in 2026. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
- Routine
A trade permit was pulled in 2015. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 67,098 sq ft (county building-footprint layer, 6 structures)
- Usable for solar, planning estimate
- ≈ 47,000 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 520 kW — roughly 1,300 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 860,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- $69,000–$112,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 1 mile away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Get a commercial solar & switchgear analysis
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot, so no zone is shown here. That is a gap in this page, not a statement about the property. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 13014005A ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 13014005A
- Year constructed
- 1988 (assessor record)
- Permitting authority
- Tucson
- Zoning
- R-2
- Property type
- Misc Commercial
- Building area
- 89,642 sq ft
The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 34 building permits for this parcel dated between 1998 and 2026. By category the work is addition / alteration (8), state licensed facility operational fire (7), trade permit (4) and solar pv (3). 26 of them carry a final inspection; the other 8 were issued, expired or are still open, which is not the same as work completed.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Commercial building (1): 2026 TC-COM-0226-00201
City permit record (30): 2025 TF-FOP-0925-01204 · 2024 TF-FOP-0924-01067 · 2023 TF-FOP-0923-01495 · 2022 T22FO00825 · 2021 T21FO00546 · 2021 T21FC00316 · 2021 T21CM01464 · 2021 T21CM01506 · 2020 T20CM06148 · 2020 T20FO00349 · 2018 T18FO00997 · 2018 T17CM09256 · 2018 T18OT00346 · 2018 DP18-0072 · 2017 T16CM05591 · 2016 T16OT01497 · 2016 T16SE00104 · 2016 T16PRE0048 · 2016 T16PRE0043 · 2015 T15CM02887 · 2014 T13CM07123 · 2014 DP13-0234 · 2013 T13CM06469 · 2013 T13CM06294 · 2012 T12BU00922 · 2012 T12CM00041 · 2010 T10CM03418 · 2005 T05CM01288 · 1998 T98BU02520 · 1998 T98CM03404
Certificate of occupancy (2): 2024 TC-CFO-0424-00084 · 2023 TC-COM-0623-01545
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 13014005A. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85711 · Commercial & industrial reports · Homes in 85711 · Permit data by neighborhood
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this property compares nearby
Properties on S COLUMBUS BL hold 289 City permits on record, 104 of them since 2022.
Computed from the same public records as this report — counts and years, not an appraisal.
Complete permit record (34 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TC-COM-0226-00201 | Commercial Solar Permit | Inspections Complete |
| 2025 | TF-FOP-0925-01204 | State Licensed Facility Operational Fire Permit | Complete |
| 2024 | TF-FOP-0924-01067 | State Licensed Facility Operational Fire Permit | Complete |
| 2024 | TC-CFO-0424-00084 | Temporary Certificate-of-Occupancy (TCO) | Issued |
| 2023 | record | Right-of-Way (ROW) Permit - Utility Emergency | Complete |
| 2023 | TF-FOP-0923-01495 | State Licensed Facility Operational Fire Permit | Complete |
| 2023 | TC-COM-0623-01545 | Commercial Addition/Alteration Permit | Complete |
| 2022 | T22FO00825 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T21FO00546 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T21FC00316 | Fire Automatic Extinguishing System Permit | Complete |
| 2021 | T21CM01464 | Commercial Addition/Alteration Permit | Expired |
| 2021 | T21CM01506 | Commercial Addition/Alteration Permit | Complete |
| 2020 | T20CM06148 | Commercial Solar Permit | Expired |
| 2020 | T20FO00349 | State Licensed Facility Operational Fire Permit | Complete |
| 2018 | T18FO00997 | State Licensed Facility Operational Fire Permit | Complete |
| 2018 | T17CM09256 | Residential Solar Permit | Complete |
| 2018 | T18OT00346 | Floodplain Use Permit | Canceled |
| 2018 | DP18-0072 | Development Package | Complete |
| 2017 | T16CM05591 | Commercial Addition/Alteration Permit | Complete |
| 2016 | T16OT01497 | Permanent Sign Permit | Complete |
| 2016 | T16SE00104 | Zoning Examiner Special Exception | Approved |
| 2016 | T16PRE0048 | Pre-Application Conference | Canceled |
| 2016 | T16PRE0043 | Pre-Application Conference | Canceled |
| 2015 | T15CM02887 | Commercial Trade Permit | Complete |
| 2014 | T13CM07123 | Commercial Addition/Alteration Permit | Complete |
| 2014 | DP13-0234 | Development Package | Complete |
| 2013 | T13CM06469 | Commercial Addition/Alteration Permit | Complete |
| 2013 | T13CM06294 | Commercial Trade Permit | Complete |
| 2012 | T12BU00922 | Commercial Trade Permit | Complete |
| 2012 | T12CM00041 | Commercial Addition/Alteration Permit | Complete |
| 2010 | T10CM03418 | Commercial Trade Permit | Complete |
| 2005 | T05CM01288 | Commercial Addition/Alteration Permit | Complete |
| 1998 | T98BU02520 | Grading | Canceled |
| 1998 | T98CM03404 | Commercial New Building Permit | Complete |
prints this report — permits, comparisons and sources — as a clean document
How this report was built
This is a reading of public records for parcel 13014005A — 34 City permits on file from 1998 to 2026 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.
The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.