Electrical permit history — 2323 S Park Av

2323 S Park Av, Tucson — built 1980, with 8 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

2323 S Park Av

Built 1980 — 1980s commercial stock · 8 permits on record; no permitted panel/service or HVAC work among them

Parcel
12913225B
Built
1980 (assessor record)
Jurisdiction
Tucson
Zoning
R-2
Assessor use
Office Building 1 Story
Parcel size
0.65 acres
Building area
12,312 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 2323 S Park Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0523-00682 — re-install the fire alarm in this renovated building
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

Most recent permit on record for this parcel: 2026-03-05 (TF-FOP-0326-00345) — Outpatient offices.

Permit history (8)

Permit history for this parcel — 8 of 8 records
DateRecordWhatStatusValue
2026-03-05finaledTF-FOP-0326-00345City permit recordFire OperationalOutpatient officesComplete
2026-01-28finaledTC-COM-0126-00124City permit recordCommercial BuildingInstallation of electric vehicle charging stationInspections complete
2026-01-27TC-COM-0126-00119City permit recordTrade permitVOID: The installation of the EV charging pedestal must be reviewed for commercial building code compliance. Since this scope of work is outside the initial scope of work that was indicated on this trade permit, this permit will be VOIDED and a new commercial addition/alteration permit needs to be applied for. When applying for the new permit, please include the documentation that was submitted on this permit. Along with that documentation, please also submit the foundation/footing design, the anchoring required to hold up the pedestal as well as an enlarged plan to illustrate the required accessible clear area around the pedestal. Installation of electric vehicle charging stationVoid
2025-03-20expired 2026-02-09TC-COM-0325-00581City permit recordCommercial BuildingAddress Correction for a previously approved permit T22CM06093 and issued C of OInspections
2025-03-19finaledTF-FOP-0325-00386City permit recordFire OperationalOutpatient treatment centerComplete
2023-08-30finaledTS-PRM-0823-00481City permit recordFence / wallInstall one non-lighted wall sign and one panel lighted sign to existing CMU monument wallComplete
2023-08-21finaledTR-ROW-0823-01075City permit recordFence / wallPer CoT Dept of Transportation approval, please issue permit for fence work in ROW to close the alley between 2305 and 2323 S Park Ave.Complete
2023-05-10finaledTF-FCP-0523-00682City permit recordFire Constructionre-install the fire alarm in this renovated buildingComplete

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12913225B — 8 permits on file from 2023 to 2026 (2 fire operational, 2 commercial building, 2 fence / wall, 1 trade permit) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.