Electrical permit history — 1230 S Cherrybell Sv

1230 S Cherrybell Sv, Tucson — built 2018, with 35 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

1230 S Cherrybell Sv

Built 2018 — 2010s commercial stock · 35 permits on record; no permitted panel/service or HVAC work among them

Parcel
12910129A
Built
2018 (assessor record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Medical Clinic No Pharmacy
Parcel size
7.58 acres
Building area
51,814 sq ft (assessor record)
Sewer
Connection on file (2018) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 1230 S Cherrybell Sv, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2020 (6 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T20FC00094 — Install an Alarm Strobe in the New Pharmacy Alcove, Move existing strobe into the Pharmacy
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

Most recent permit on record for this parcel: 2026-07-22 (TF-FOP-0726-00986) — Fire Operational Permit.

Permit history (35)

Permit history for this parcel — 8 of 35 records
DateRecordWhatStatusValue
2026-07-22finaledTF-FOP-0726-00986City permit recordFire OperationalFire Operational PermitComplete
2026-07-22expires 2026-10-24TR-ROW-0726-00842City permit recordRight-of-Way (ROW)Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.Inspections
2026-04-30finaledTR-ROW-0426-00519City permit recordRight-of-Way (ROW)Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2026-01-22finaledTR-ROW-0126-00084City permit recordRight-of-Way (ROW)Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.Complete
2025-10-03finaledTR-ROW-1025-01231City permit recordRight-of-Way (ROW)Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2025-08-04finaledTR-ROW-0825-00987City permit recordRight-of-Way (ROW)Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.Complete
2025-07-01finaledTF-FOP-0725-00924City permit recordFire OperationalEl Rio outpatientComplete
2025-04-25finaledTR-ROW-0425-00550City permit recordRight-of-Way (ROW)Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
Show 27 older records
Permit history for this parcel — remaining 27 records
DateRecordWhatStatusValue
2025-02-14finaledTR-ROW-0225-00213City permit recordRight-of-Way (ROW)Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.Complete
2024-09-27finaledTR-ROW-0924-01137City permit recordRight-of-Way (ROW)Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2024-09-26finaledTR-UTL-0924-01860City permit recordRight-of-Way (ROW) - Utilitywo2880934 1230 s cherrybell sv 14-14-19 ne water main repair in ws of cherrybell sv north of 24th st in dirt 8lf/arComplete
2024-09-25TR-ROW-0924-01121City permit recordRight-of-Way (ROW)Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Needs resubmittal
2024-07-17finaledTR-ROW-0724-00816City permit recordRight-of-Way (ROW)Measure water level and sample one groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2024-07-09finaledTF-FOP-0724-00770City permit recordFire OperationalEl Rio CherrybellComplete
2024-04-18finaledTR-ROW-0424-00422City permit recordRight-of-Way (ROW)Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2024-01-18finaledTR-ROW-0124-00078City permit recordRight-of-Way (ROW)Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.Complete
2023-09-29finaledTR-ROW-0923-01204City permit recordRight-of-Way (ROW)Collect fluid level at groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2023-07-17finaledTR-ROW-0723-00959City permit recordRight-of-Way (ROW)Sample one groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Complete
2023-07-14TR-ROW-0723-00953City permit recordRight-of-Way (ROW)Denied - As Submitted - Please Submit each Well Location as individual permits - Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.Denied
2023-04-06finaledTR-ROW-0423-00604City permit recordRight-of-Way (ROW)Gauge fluid levels at two groundwater monitoring wells (2-3 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and 1415 S Cherry Ave., Tucson, AZ 85713 address for the second well.Complete
2023-02-23finaledTF-FOP-0223-00559City permit recordFire OperationalState License FacilityComplete
2023-02-13finaledTR-ROW-0223-00376City permit recordRight-of-Way (ROW)Contractor will be removing & replacing new traffic camera sensors. Duration for this project is approx. (1) one hour. Walkway for pedestrians will be available.Complete
2023-01-23finaledTR-ROW-0123-00287City permit recordRight-of-Way (ROW)Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.Complete
2022-11-18finaledTR-ROW-1122-00076City permit recordRight-of-Way (ROW)Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.Complete
2022-09-20finaledT22RW03425City permit recordRight-of-Way (ROW)Job Order Contract (JOC) for Traffic Signal & Street Light Construction, CONTRACT NO. 181906REPLComplete
2022-02-25finaledT22RW00668City permit recordPool / spaSample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-08-12finaledT21RW03715City permit recordROWW/O# 21R2152 - REPAIR LEAKING MAIN @ 6 LF. EMERGENCY AFTER THE FACTFinal
2021-08-11finaledT21RW03686City permit recordROWWATER REPAIR/REPLACE - APPROXIMATELY 5 LF IN DIRT. EMERGENCY - AFTER THE FACT PERMITFinal
2020-08-11finaledT20RW04561City permit recordROWSample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.Final
2020-02-04finaledT20FC00094City permit recordFIRECONSInstall an Alarm Strobe in the New Pharmacy Alcove, Move existing strobe into the PharmacyFinal
2019-12-26DP19-0314City permit recordDevelopment PackageSITE/GRADING - Cherrybell Medical Center, Phase 2 (revision to DP17-0157).Awaiting submittal
2019-01-25expired 2019-12-10T19OT00095City permit recordSign - PermanentProposed pole sign (Singular Sign Design Option approved / T19SA00097 appeal period ended 4/9/19)Expired
2018-07-23finaledT18FC00595City permit recordFIRECONSINSTALL A FIRE SPRINKLER MONITOR AND ALARM SYSTEM IN THIS NEW MEDICAL CENTER.Final
2018-05-23finaledT18FC00431City permit recordFIRECONSINSTALLING 145 LF OF 4" C-400 W/6" OF SHADE SAND AT ALL SIDES.Final
2018-05-07finaledT18FC00386City permit recordFIRECONSNew Wet Fire Sprinkler SystemFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2021-09-13T21DV06357Housing code violationOBSTR DEAD TREES AND SHRUBSrecorded before 2023COMPLIAN

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12910129A — 35 permits on file from 2018 to 2026 (20 right-of-way (row), 4 fire operational, 4 firecons, 3 row) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.