Electrical permit history — 390 S Tucson Bl
390 S Tucson Bl, Tucson — built 1965, with 57 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Commercial property
390 S Tucson Bl
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 1965 — 1960s commercial stock · last permitted panel/service work 2002 (finaled) · HVAC 1998 (finaled) · 1 open code case
Permanent link: Electrical permit history for 390 S Tucson Bl (aztucsonelectricalsolutions.com/property/12901036b/390-s-tucson-bl-tucson-az-85716) · Public records last checked 2026-09-22
Is it time to upgrade?
- Electrical service & distributionFinaled permit foundLast permitted 2002 (24 years ago). Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T02EL00116 — ELECTRIC:NEW SERVICE 400AMPS
- Heating, cooling & mechanicalLikely dueLast permitted 1998 (28 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T98CM02081 — CHILLER:REPLACEMENT & CIRCUIT:ELECTRIC
- Fire alarm & life safetyFinaled permit foundLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-1023-01233 — Install new Addressable Fire Alarm and Voice Evac System in the School.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A finaled 2002 panel/service permit is on record for this parcel, which makes it unlikely the original 100 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Worth looking at
There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Routine
A trade permit was pulled in 2017. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 63,758 sq ft (county building-footprint layer, 9 structures)
- Usable for solar, planning estimate
- ≈ 44,600 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 490 kW — roughly 1,230 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 810,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- $65,000–$105,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacity — mapped saturation areaThis property sits within about half a mile of “Aviation Pkwy and Kino Pkwy”, one of 11 areas TEP has mapped as saturated with distributed generation (customer solar) relative to circuit capacity. On a saturated circuit, new solar or battery systems can trigger supplemental utility review before interconnection is approved — and a large new load such as DC fast charging or process equipment is worth a capacity conversation with TEP before a site plan hardens. The boundary here is approximate, digitized from TEP’s map of the area (PDF, July 2020); TEP’s own interconnection screening is the authority, and circuit status can have changed since the maps were published.
Get a commercial solar & switchgear analysis
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot, so no zone is shown here. That is a gap in this page, not a statement about the property. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 12901036B ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 12901036B
- Year constructed
- 1965 (assessor record)
- Permitting authority
- Tucson
- Zoning
- R-2
- Property type
- Misc Commercial
- Building area
- 43,953 sq ft
- Service on record
- City records show the 2002 permit was finalized; the permit description states “ELECTRIC:NEW SERVICE 400AMPS”.
The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.
The most recent permit with evidence of issuance is dated 2025. City records show the permit was finalized. The permit covers only the work described in that record.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permit with evidence of issuance is dated 2025. City records show the permit was finalized. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 57 building permits for this parcel dated between 1998 and 2026. By category the work is trade permit (13), state licensed facility operational fire (12), addition / alteration (12) and special events fire permit - organizer (5). 46 of them carry a final inspection; the other 11 were issued, expired or are still open, which is not the same as work completed. There are 2 code-enforcement cases recorded against the parcel, 1 of which is open. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Commercial building (2): 2026 TC-COM-0826-01413 · 2023 T22CM06115
Code enforcement cases (2): 2026 CE-VIO0726-03189 · 2013 T13DV05830
City permit record (53): 2025 TF-FOP-0925-01208 · 2025 TF-FOP-0725-01018 · 2025 TF-FOP-0725-01020 · 2025 TC-REG-0725-00012 · 2024 TF-FCP-1023-01233 · 2024 TF-FCP-1223-01447 · 2023 TF-FCP-1223-01361 · 2023 TF-FCP-0423-00547 · 2022 T22FO00702 · 2022 T22FO00703 · 2021 T21FO00517 · 2021 T21FO00521 · 2020 T20FO00274 · 2020 T20FO00275 · 2019 T19FO00752 · 2019 T19FO00407 · 2019 T19FO00405 · 2018 T18FO00807 · 2018 T18FO00303 · 2018 T18FO00304 · 2017 T17CM07677 · 2017 T17FO00793 · 2017 T17FO00251 · 2010 T10CM03387 · 2010 T10BU00782 · 2009 T09BU00856 · 2008 T08CM02046 · 2008 T06OT02089 · 2007 T07BU01811 · 2007 T07BU00130 · and 23 older — search the parcel at the office below
Design modification (1): 2008 DS08-04
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 12901036B. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85716 · Commercial & industrial reports · Homes in 85716 · Permit data by neighborhood
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this property compares nearby
Properties on S TUCSON BL hold 337 City permits on record, 56 of them since 2022.
Computed from the same public records as this report — counts and years, not an appraisal.
Complete permit record (59 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TC-COM-0826-01413 | Commercial Trade Permit | Needs Resubmittal |
| 2026 | CE-VIO0726-03189 | Vegetation | Assigned |
| 2025 | TF-FOP-0925-01208 | Special Events Fire Permit - Organizer | Complete |
| 2025 | TF-FOP-0725-01018 | State Licensed Facility Operational Fire Permit | Complete |
| 2025 | TF-FOP-0725-01020 | State Licensed Facility Operational Fire Permit | Complete |
| 2025 | TC-REG-0725-00012 | Registered Facility Annual Permit | Expired |
| 2024 | TF-FCP-1023-01233 | Fire Alarm System Permit | Complete |
| 2024 | TF-FCP-1223-01447 | Fire Automatic Extinguishing System Permit | Complete |
| 2023 | TF-FCP-1223-01361 | Fire Automatic Extinguishing System Permit | Complete |
| 2023 | T22CM06115 | Commercial Addition/Alteration Permit | Inspections Complete |
| 2023 | record | Right-of-Way (ROW) Permit - Utility | Complete |
| 2023 | TF-FCP-0423-00547 | Fire Automatic Extinguishing System Permit | Expired |
| 2022 | T22FO00702 | State Licensed Facility Operational Fire Permit | Complete |
| 2022 | T22FO00703 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T21FO00517 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T21FO00521 | State Licensed Facility Operational Fire Permit | Complete |
| 2020 | T20FO00274 | State Licensed Facility Operational Fire Permit | Complete |
| 2020 | T20FO00275 | State Licensed Facility Operational Fire Permit | Complete |
| 2019 | T19FO00752 | Special Events Fire Permit - Organizer | Complete |
| 2019 | T19FO00407 | State Licensed Facility Operational Fire Permit | Complete |
| 2019 | T19FO00405 | State Licensed Facility Operational Fire Permit | Complete |
| 2018 | T18FO00807 | Special Events Fire Permit - Organizer | Complete |
| 2018 | T18FO00303 | State Licensed Facility Operational Fire Permit | Complete |
| 2018 | T18FO00304 | State Licensed Facility Operational Fire Permit | Complete |
| 2017 | T17CM07677 | Commercial Trade Permit | Complete |
| 2017 | T17FO00793 | Special Events Fire Permit - Organizer | Complete |
| 2017 | T17FO00251 | Special Events Fire Permit - Organizer | Complete |
| 2013 | T13DV05830 | REFUSE | COMPLIAN |
| 2010 | T10CM03387 | Commercial Addition/Alteration Permit | Canceled |
| 2010 | T10BU00782 | Commercial Demolition | Complete |
| 2009 | T09BU00856 | Commercial Demolition | Complete |
| 2008 | T08CM02046 | Commercial Addition/Alteration Permit | Complete |
| 2008 | T06OT02089 | Commercial Addition/Alteration Permit | Complete |
| 2008 | DS08-04 | Zoning Verification Letter | Approved |
| 2007 | T07BU01811 | Fire Automatic Extinguishing System Permit | Complete |
| 2007 | T07BU00130 | Commercial Addition/Alteration Permit | Complete |
| 2007 | T07BU00131 | Commercial Fence/Wall Permit | Canceled |
| 2007 | T06CM04197 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06OT02090 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06OT02091 | Commercial Addition/Alteration Permit | Complete |
| 2006 | T06CM02350 | Commercial Trade Permit | Canceled |
| 2006 | T06ME00178 | Commercial Trade Permit | Complete |
| 2005 | T05CM03930 | Commercial Addition/Alteration Permit | Complete |
| 2005 | T05PL01201 | Commercial Trade Permit | Withdrawn |
| 2005 | T05EL00890 | Commercial Trade Permit | Complete |
| 2005 | T05BU01273 | Commercial Demolition | Complete |
| 2005 | T05BU01222 | Commercial Demolition | Withdrawn |
| 2004 | T04BU02413 | Commercial Addition/Alteration Permit | Complete |
| 2004 | T04PL01663 | Commercial Trade Permit | Complete |
| 2003 | T03BU01790 | Commercial Fence/Wall Permit | Complete |
| 2002 | T02EL00116 | Commercial Trade Permit | Complete |
| 2002 | T02PL00013 | Commercial Trade Permit | Complete |
| 2001 | T01BU02375 | Commercial Fence/Wall Permit | Complete |
| 2000 | T00BU01548 | Commercial Trade Permit | Complete |
| 2000 | T00CM00800 | Commercial Addition/Alteration Permit | Complete |
| 2000 | T99CM00903 | Commercial Trade Permit | Complete |
| 1999 | T99BU03475 | Commercial Trade Permit | Canceled |
| 1998 | T98CM03738 | Commercial Addition/Alteration Permit | Withdrawn |
| 1998 | T98CM02081 | Commercial Trade Permit | Complete |
prints this report — permits, comparisons and sources — as a clean document
How this report was built
This is a reading of public records for parcel 12901036B — 57 City permits on file from 1998 to 2026 and 2 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.
The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.