Electrical permit history — 142 S Tucson Bl
142 S Tucson Bl, Tucson — built 2019, with 14 permits on record. Review electrical, HVAC and remodel history with links to official records.
Multifamily property
142 S Tucson Bl
Built 2019 — 2010s multifamily stock · 1 open code case · 14 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 142 S Tucson Bl (aztucsonelectricalsolutions.com/property/12901035m/142-s-tucson-bl-tucson-az-85716) · Public records last checked 2026-08-17
- Parcel
- 12901035M
- Built
- 2019 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Apartments 25 - 99 Units 2 Story
- Parcel size
- 1.16 acres
- Building area
- 26,826 sq ft (assessor record)
- Sewer
- Connection on file (2020) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 fire construction permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 fire construction permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2021 (5 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00812 — WF/T MONITORING
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth looking at
There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.
- Worth confirming
Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.
- Worth confirming
A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2025-05-12 (TC-COM-0525-00968) — ROUTE GAS LINE FROM METER TO POOL HEATER AND SPA HEATER LOCATIONS FURTHEST APPLIANCE: 9' 6" TOTAL BTU: 582,000 BTU 1 1/4" LINE TO 3/4".
Permit history (14)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-05-12finaled | TC-COM-0525-00968City permit record | Pool / spaROUTE GAS LINE FROM METER TO POOL HEATER AND SPA HEATER LOCATIONS FURTHEST APPLIANCE: 9' 6" TOTAL BTU: 582,000 BTU 1 1/4" LINE TO 3/4" | Complete | |
| 2024-06-25 | TC-COM-0624-01214City permit record | Commercial BuildingI need to remodel the structure because of a fire and are trying to repair it. repair the header | Expired | |
| 2024-02-07expired 2024-08-20 | TC-COM-0224-00253City permit record | Electrical reconnectEmergency Electrical reconnect | Issued | |
| 2024-01-31 | TC-COM-0124-00213City permit record | Addition / alteration*VOID: YL-Unable to process. According to the full plan set submitted for tenant improvements please apply for a Commercial Addition/Alteration Permit. This permit will be voided as it is not the correct permit type. For questions: Building_Official@tucsonaz.gov * -For unit 65 to turn on the power for resident to move in | Void | |
| 2024-01-31 | TC-COM-0124-00218City permit record | Electrical reconnect*VOID: YL-Unable to process. According to the full plan set submitted for tenant improvements please apply for a Commercial Addition/Alteration Permit. This permit will be voided as it is not the correct permit type.* -Electrical Reconnect | Void | |
| 2024-01-18 | TC-COM-0124-00117City permit record | Addition / alteration*VOID: YL-Unable to process. According to the full plan set submitted for tenant improvements please apply for a Commercial Addition/Alteration Permit. This permit will be voided as it is not the correct permit type. * -For unit 65 to turn on the power for a resident to move in. | Void | |
| 2021-12-02 | T21FC00874City permit record | FIRECONSWF/T MONITORING. | Withdrwn | |
| 2021-10-28finaled | T21FC00812City permit record | FIRECONSWF/T MONITORING | Final |
Show 6 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2021-07-02expired 2022-10-12 | T21CM05469City permit record | Commercial BuildingNEW COVERED PARKING STRUCTURES | Expired | |
| 2021-02-10finaled | T21FC00111City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - BLDG 4 - New 13R System - 98 heads | Complete | |
| 2020-10-14finaled | T20FC00674City permit record | FIRECONSBLDG 5 - NEW 13R FIRE SPRINKLER SYSTEM - 102 HEADS | Final | |
| 2020-06-24finaled | T20CM03956City permit record | Commercial BuildingNEW APARTMENT BLDG | Complete | |
| 2020-04-20finaled | T20CM02426City permit record | Commercial BuildingNEW APARTMENT BUILDING | Complete | |
| 2018-10-22finaled | DP18-0262City permit record | Development PackageSITE - Midvalley Apartments. | Complete |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (11)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-08-27 | CE-VIO0825-03656Code enforcement case | Electrical | Closed - resolved |
| 2024-10-30 | CE-VIO1024-04360Code enforcement case | Code enforcement case | Active |
| 2024-06-22 | CE-VIO0624-02393Code enforcement case | Fire | Closed - resolved |
| 2022-07-14 | T22DV03986Code enforcement case | Code enforcement case | Noverify |
| 2022-06-15 | T22DV03436Code enforcement case | Code enforcement case | Noverify |
| 2022-04-05 | T22DV02264Code enforcement case | Code enforcement case | Complian |
| 2018-12-06 | T18DV07903Housing code violation | EMERGENCYrecorded before 2023 | COMPLIAN |
| 2017-07-21 | T17DV03142Housing code violation | ILLEGAL DUMPINGrecorded before 2023 | COMPLIAN |
Show 3 older records
| Date | Record | What | Status |
|---|---|---|---|
| 2017-01-25 | T17DV00353Housing code violation | MULTIPLE TYPESrecorded before 2023 | COMPLIAN |
| 2015-03-06 | T15DV01717Housing code violation | SIGN VIOLATIONNotice of violation issued · recorded before 2023 | COMPLIAN |
| 2009-12-17 | T09DV06931Housing code violation | WORK WITHOUT PERMITS-COMMERCLNotice of violation issued · recorded before 2023 | COMPLIAN |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 12901035M — 14 permits on file from 2018 to 2025 (4 commercial building, 3 firecons, 2 electrical reconnect, 2 addition / alteration) and 11 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
