Electrical permit history — 5353 E 22nd St

5353 E 22nd St, Tucson — built 1975, with 40 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

5353 E 22nd St

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1975 — 1970s multifamily stock · 10 open code cases · 40 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Nothing permitted on the service or distribution shows in the record we read, which for a building of this era leaves the original switchgear generation in play. Obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown — worth establishing what is actually installed before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyPermitted — completion not confirmedA 2025 permit specifies this work (the permit description states “New 13R sprinkler system with 113 feet of underground”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. TF-FCP-0325-00250 — New 13R sprinkler system with 113 feet of underground
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth looking at

    There are 10 open code enforcement cases on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2025. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

  • Routine

    A trade permit was pulled in 2025. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 109,363 sq ft (county building-footprint layer, 17 structures)
Usable for solar, planning estimate
≈ 76,600 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 840 kW — roughly 2,100 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 1,380,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$110,000–$179,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 1.8 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
12809005H
Year constructed
1975 (assessor record)
Permitting authority
Tucson
Zoning
C-2
Property type
Apartments 100+ Units 2 Story
Building area
157,701 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air

The building area, cooling and heating above come from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 40 building permits for this parcel dated between 1997 and 2026. By category the work is trade permit (14), addition / alteration (8), zoning compliance (6) and permanent sign (6). 34 of them carry a final inspection; the other 6 were issued, expired or are still open, which is not the same as work completed. There are 140 code-enforcement cases recorded against the parcel, 10 of which are open. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 12809005H. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85711 · Commercial & industrial reports · Homes in 85711 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E 22ND ST hold 2,696 City permits on record, 525 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (180 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026CE-VIO0926-03839Code enforcement caseReceived
2026CE-VIO0826-03405Code enforcement caseClosed - Resolved
2026CE-VIO0826-03352Code enforcement caseClosed - Unfounded
2026CE-VIO0826-03350Code enforcement caseCitation
2026CE-VIO0826-03339Code enforcement caseActive
2026CE-VIO0826-03275Code enforcement caseClosed - Resolved
2026CE-VIO0826-03265Code enforcement caseActive
2026CE-VIO0826-03262Code enforcement caseAssigned
2026CE-VIO0726-03163Code enforcement caseActive
2026CE-VIO0726-03022Code enforcement caseReceived
2026CE-VIO0726-03019Code enforcement caseClosed - Unfounded
2026CE-VIO0726-03018Code enforcement caseReferred
2026CE-VIO0726-03017Code enforcement caseClosed - Unfounded
2026CE-VIO0726-02879Code enforcement caseClosed - Resolved
2026CE-VIO0726-02876Code enforcement caseClosed - Resolved
2026CE-VIO0726-02848RefuseClosed - Resolved
2026CE-VIO0726-02844RefuseCitation
2026CE-VIO0626-02630Code enforcement caseClosed - Resolved
2026CE-VIO0326-01353Code enforcement caseClosed - Resolved
2026CE-VIO0326-01321Code enforcement caseClosed - Resolved
2026CE-VIO0326-01278Code enforcement caseClosed - Resolved
2026TC-COM-0326-00298Commercial Addition/Alteration PermitNeeds Resubmittal
2026CE-VIO0326-01011Code enforcement caseCitation
2026CE-VIO0226-00986Code enforcement caseClosed - Resolved
2026CE-VIO0126-00147Code enforcement caseCitation
2025TC-COM-1125-02079Commercial Solar PermitInspections Complete
2025CE-VIO1125-04838Code enforcement caseClosed - Resolved
2025CE-VIO1025-04712Code enforcement caseClosed - Resolved
2025CE-VIO0925-04192Code enforcement caseClosed - Resolved
2025CE-VIO0925-04191Code enforcement caseClosed - Resolved
2025CE-VIO0825-03318Code enforcement caseClosed - Resolved
2025CE-VIO0725-03141Code enforcement caseClosed - Unfounded
2025CE-VIO0725-03140RefuseClosed - Resolved
2025CE-VIO0725-03139Code enforcement caseClosed - Resolved
2025CE-VIO0625-02437Code enforcement caseReferred
2025CE-VIO0525-02326Code enforcement caseClosed - Resolved
2025TC-COM-0525-01038Commercial Trade PermitComplete
2025TF-FCP-0325-00250Fire Automatic Extinguishing System PermitIssued
2025CE-VIO0425-01392Code enforcement caseClosed - Resolved
2025CE-VIO0425-01368Code enforcement caseClosed - Unfounded
2025CE-VIO0425-01351Code enforcement caseClosed - Resolved
2025CE-VIO0325-01316Code enforcement caseClosed - Resolved
2025CE-VIO0325-01134Code enforcement caseClosed - Resolved
2025CE-VIO0325-01087Code enforcement caseClosed - Resolved
2025CE-VIO0325-00932Code enforcement caseClosed - Resolved
2025CE-VIO0225-00719RefuseClosed - Resolved
2025CE-VIO0225-00611FireClosed - Resolved
2025CE-VIO0125-00355Code enforcement caseClosed - Resolved
2024CE-VIO1224-04946Code enforcement caseClosed - Unfounded
2024CE-VIO0924-03857Code enforcement caseClosed - Unfounded
2024CE-VIO0724-02971Code enforcement caseClosed - Unfounded
2024CE-VIO0224-00813Code enforcement caseClosed - Resolved
2024CE-VIO0124-00290Code enforcement caseClosed - Resolved
2023CE-VIO1023-06222Code enforcement caseClosed - Resolved
2023TC-COM-0523-01247Commercial Addition/Alteration PermitStop Work Order
2023CE-VIO0823-05105RefuseClosed - Resolved
2023CE-VIO0723-04860Code enforcement caseClosed - Unfounded
2023CE-VIO0523-03475VegetationClosed - Resolved
2023CE-VIO0523-03351Code enforcement caseClosed - Resolved
2023CE-VIO0123-01538Code enforcement caseClosed - Resolved
2022CE-VIO1222-00785ElectricalClosed - Resolved
2022CE-VIO1122-00673Code enforcement caseClosed - Resolved
2022CE-VIO1122-00520Code enforcement caseReferred
2022CE-VIO1122-00423ElectricalClosed - Resolved
2022CE-VIO1122-00421Code enforcement caseClosed - Resolved
2022T22DV06045Code enforcement caseClosed - Resolved
2022T22DV05071RES: MINIMUM HOUSINGCOMPLIAN
2022T22DV04693ANIMAL WASTENOVERIFY
2022T22DV04638RES: MINIMUM HOUSINGNOVERIFY
2022T22DV03853DILAPIDATED STRUCTURECOMPLIAN
2022T22DV03373RES: MINIMUM HOUSINGCOMPLIAN
2022T22DV03365RES: MINIMUM HOUSINGNOVERIFY
2022T22DV03052EXCESSIVE INTERIOR STORAGENOVERIFY
2022T22DV02007FireClosed - Resolved
2022T22DV02008FireClosed - Resolved
2022T22DV02009FireClosed - Resolved
2022T22DV02010FireClosed - Resolved
2022T22DV02011FireClosed - Resolved
2022T22DV02012FireClosed - Resolved
2022T22DV02013FireClosed - Resolved
2022T22DV02014FireClosed - Resolved
2021T21DV07495MULTIPLE TYPESNOVERIFY
2021T21DV07145PROP MAINT MULTIPLE TYPESNOVERIFY
2021T21DV05483PROP MAINT MULTIPLE TYPESREFERRED
2021T21DV04527PROP MAINT MULTIPLE TYPESCOMPLIAN
2021T21DV02890WORK WITHOUT PERMITS-COMMERCLCOMPLIAN
2021T21SA00148Zoning ComplianceComplete
2021T21DV01061ANIMAL ISSUESNOVERIFY
2021T21DV01044RES: MINIMUM HOUSINGCOMPLIAN
2020T20DV04780COMMERCIAL ZONINGCOMPLIAN
2020T20DV03531RES: MINIMUM HOUSINGNOVERIFY
2020T20DV03246PROP MAINT MULTIPLE TYPESNOVERIFY
2020T20CM02545Residential Solar PermitComplete
2020T20CM01186Commercial Solar PermitExpired
2020DP19-0290Development PackageComplete
2020T20DV01865EMERGENCYCOMPLIAN
2020T20DV01538RES: MINIMUM HOUSINGCOMPLIAN
2020T20CM01000Commercial Trade PermitComplete
2020T20DV00520REFUSENOVERIFY
2019T19CM08278Commercial Addition/Alteration PermitCanceled
2019T19DV07411LIGHTING VIOLATIONNOVERIFY
2019T19DV07412LIGHTING VIOLATIONREFERRED
2019T19DV06413RES: MINIMUM HOUSINGCOMPLIAN
2019T19DV06184PROP MAINT MULTIPLE TYPESNOVERIFY
2019T19DV03511EMERGENCYCOMPLIAN
2019T19DV00093RES: MINIMUM HOUSINGNOVERIFY
2018T18DV08191MULTIPLE TYPESCOMPLIAN
2018T18DV07355PROP MAINT MULTIPLE TYPESNOVERIFY
2018T18DV07033RES: MINIMUM HOUSINGNOVERIFY
2018T18DV06618RES: MINIMUM HOUSINGNOVERIFY
2018T18DV04895OBSTR DEAD TREES AND SHRUBSNOVERIFY
2018T18DV01159RES: MINIMUM HOUSINGCOMPLIAN
2018T18SA00077Zoning ComplianceComplete
2017T17DV06560PROP MAINT MULTIPLE TYPESNOVERIFY
2017T17SA00422Zoning ComplianceComplete
2017T17DV02774MULTIPLE TYPESCOMPLIAN
2017T17DV01537RES: MINIMUM HOUSINGCOMPLIAN
2017T17SA00052Zoning ComplianceComplete
2017T17SA00042Zoning ComplianceComplete
2017T17DV00264DILAPIDATED STRUCTURENOVERIFY
2016T16DV08009PROP MAINT MULTIPLE TYPESREFERRED
2016T16DV05281RES: MINIMUM HOUSINGCANCEL
2016T16DV03738PROP MAINT MULTIPLE TYPESCOMPLIAN
2015T15DV06119MULTIPLE TYPESREFERRED
2015T15DV05775COMMERCIAL ZONINGCOMPLIAN
2014T14DV08423RES: MINIMUM HOUSINGNOVERIFY
2014T14DV06892RES: MINIMUM HOUSINGCOMPLIAN
2014T14DV06266SIGN VIOLATIONCOMPLIAN
2014T14DV05166RESIDENTIAL ZONINGNOVERIFY
2014T14DV04027ENVIRONMENTALNOVERIFY
2014T14SA00104Zoning ComplianceComplete
2014T14DV00248RES: MINIMUM HOUSINGCOMPLIAN
2014T14DV00259RES: MINIMUM HOUSINGREFERRED
2013T13DV02097RES: MINIMUM HOUSINGCOMPLIAN
2013T13DV02107RES: MINIMUM HOUSINGCOMPLIAN
2013T13DV00783RES: MINIMUM HOUSINGCANCEL
2012T12DV11344RES: MINIMUM HOUSINGNOVERIFY
2012T12DV10057ENVIRONMENTALCOMPLIAN
2012T12DV07131COMMERCIAL ZONINGCOMPLIAN
2012T12DV06816RES: MINIMUM HOUSINGCOMPLIAN
2012T12DV05269RES: MINIMUM HOUSINGNOVERIFY
2012T12DV04877MULTIPLE TYPESCOMPLIAN
2012T12DV02376RES: MINIMUM HOUSINGCANCEL
2011T11DV08649MULTIPLE TYPESNOVERIFY
2011T11DV04884RES: MINIMUM HOUSINGNOVERIFY
2011T11EL01412Commercial Trade PermitComplete
2011T11DV02167RESIDENTIAL FIRECOMPLIAN
2010T10DV05237RES: MINIMUM HOUSINGCOMPLIAN
2010T09OT01529Floodplain Use PermitComplete
2008T08DV08992RES: MINIMUM HOUSINGCOMPLIAN
2008T08DV08962RES: MINIMUM HOUSINGNOVERIFY
2008T08ME00561Commercial Trade PermitComplete
2008T08ME00562Commercial Trade PermitComplete
2008T08ME00563Commercial Trade PermitComplete
2008T08ME00560Commercial Trade PermitComplete
2008T08ME00556Commercial Trade PermitComplete
2008T08ME00557Commercial Trade PermitComplete
2008T08ME00558Commercial Trade PermitComplete
2008T08ME00559Commercial Trade PermitComplete
2008T08ME00564Commercial Trade PermitComplete
2008T08ME00565Commercial Trade PermitComplete
2008T08DV07066RES: MINIMUM HOUSINGCOMPLIAN
2008T08DV05265RES: MINIMUM HOUSINGCOMPLIAN
2008T08DV03514MULTIPLE TYPESCOMPLIAN
2008T08DV02241RES: MINIMUM HOUSINGCOMPLIAN
2008T08DV01247RES: MINIMUM HOUSINGCOMPLIAN
2008T08DV01226RES: MINIMUM HOUSINGCOMPLIAN
2008T08DV01098RES: MINIMUM HOUSINGNOVERIFY
2007T07CM03018Commercial Addition/Alteration PermitComplete
2007T07CM03028Commercial Addition/Alteration PermitWithdrawn
2007T07OT00523Permanent Sign PermitComplete
2005T04CM05330Commercial Addition/Alteration PermitComplete
2005T04CM05559Commercial Addition/Alteration PermitComplete
2005T04OT02366Permanent Sign PermitComplete
2005T05OT00408Permanent Sign PermitComplete
2001T01EL00161Commercial Trade PermitComplete
2000T00VL01005Permanent Sign PermitComplete
1999T99VL00691Permanent Sign PermitComplete
1999T99VL00723Permanent Sign PermitComplete
1997T97BU00093Commercial Addition/Alteration PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 12809005H — 40 City permits on file from 1997 to 2026 and 140 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area, cooling, heating, roof, walls on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.