Electrical permit history — 5950 E Broadway Bl

5950 E Broadway Bl, Tucson — built 1965, with 86 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Property

5950 E Broadway Bl

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1965 — possible aluminum-wiring era — based on year only, not observed · 86 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Nothing permitted on the service shows in the record we read. For a home built in 1965 that leaves the original service era in play — the panel makes and wiring methods of that era are exactly what the era check above flags, and only a look at the panel settles it.
  • Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
  • Water heaterLikely dueLast permitted 2007 (19 years ago). T07PL00875 — REPLACE: 50 GALLON WATER HEATER (APA)
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
  • Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    This is the aluminum branch-circuit window (roughly 1965–1973). Solid aluminum on 15/20 A circuits is a recognized fire hazard at the terminations and needs approved repair — COPALUM or AlumiConn, not a wire nut. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Federal Pacific (Stab-Lok) and Zinsco/Sylvania panels were sold through this period. Stab-Lok breakers have a documented history of failing to trip internally; Zinsco breakers can weld to the bus so the handle moves without breaking the circuit. In both cases a replacement breaker does not resolve it — the panel itself is what gets replaced. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    100 A was typical for the era. Adding an EV charger, heat pump or casita requires a load calculation; an upgrade or a load-management device may be needed. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    A trade permit was pulled in 2021. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

What to check at the panel

Everything above is read off public records. These are the things only someone standing at the panel can settle, and they take about a minute.

  1. The number stamped on the main breaker handle — 100, 125, 150, 175 or 200. That is the service rating, and no record on this page confirms it.
  2. The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
  3. The manufacturer and catalog number on the label inside the door.
  4. How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
  5. The conductor material at the main lugs, and whether the terminations look clean and tight.
  6. Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
  7. Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.
  8. The brand on the door or the breaker faces. Federal Pacific panels usually read “Federal Pacific Electric” or “FPE”; Zinsco panels read “Zinsco”, or on later stock “Sylvania” or “Sylvania-Zinsco”. Finding a Square D, Eaton, Cutler-Hammer, Siemens or GE panel here is the ordinary result and is not a finding — those are current, supported lines with breakers on the shelf.
  9. The conductors landing on the 15 and 20 A breakers. Silver-coloured rather than copper is the 1965–1973 solid-aluminum branch-circuit question, and it is repaired at the terminations, not by replacing the panel. The aluminum feeder between meter and panel, and the aluminum service conductors overhead, are normal on houses of every era and are a different thing entirely.
  10. Whether the kitchen counter, bathroom, garage and exterior receptacles have GFCI protection, and whether the test button actually trips them.

With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work.

Open the load calculator →

What these jobs cost here

No floor area on record, so the cooling side cannot be priced from the record alone.

Electrical panel or service upgrade

$3,300

Most jobs like this land between $2,900 and $4,100.

The existing underground lateral is adequate for the new service and stays. That is the ordinary case, and it makes an underground job cheaper than an overhead one — the opposite of what most people expect, because there is no mast, riser or weatherhead. The bottom of this range is a clean, simple job: single storey, framed wall, the panel staying where it is, a short service run, and nothing unexpected once the cover comes off. That job is real and we do book it — but it is the best case, not the average, and the figure above it is what most houses actually come to.

Priced from built 1965 (possible aluminum-wiring era — based on year only, not observed), City of Tucson permit fee and the 2023 NEC it has adopted, Tucson Electric Power as the serving utility and a finalled permit (T97BU00911) describing an underground service, so that is what is priced rather than assumed.

What would move this price
  • Only if the panel has to move — a clothes closet, a bathroom, over a stairway, or behind a door +$3,900
  • Only if the mast is undersized or corroded — common at this age +$1,300
  • Only if the metal water and gas piping are not already bonded — usually not, at this age +$600
  • Only if the walls are block or adobe rather than framed — the county record does not say which +$1,100
  • Only if stucco has to be cut and patched +$1,100

If every one of those turned out to apply, this becomes about $12,000. That is the worst realistic case, not a prediction — none of them is a claim about your house.

Before you spend anything
  • If your service is underground and the lateral is big enough to keep, you are already on the cheaper path. Ask the contractor to confirm the conduit size before you assume it: a 100 A original in 1¼″ conduit will not take 200 A, and that single fact swings the job by thousands.
  • A service upgrade fixes capacity and the safety of the service equipment. It does not fix branch wiring. If the reason you are here is flickering lights, warm outlets or cloth-jacketed wiring, an upgrade is a down payment on a much bigger problem, and it is worth knowing that before you spend in the wrong order. (The report reserves the era-specific wiring checks for the years they actually apply to — read those above.)
  • You may not need the upgrade at all. NEC 220.87 lets an existing dwelling be sized from twelve months of actual metered demand rather than a calculated load, and real houses draw far less than the calculation predicts. Ask your utility for a year of interval data and have it run that way first. Two cautions so this does not backfire: the demand tile in a TEP online account shows on-peak demand only, which is not the annual maximum the code asks for — you want the formal usage-data release — and 220.87 proves CAPACITY and nothing else. It does not create empty breaker spaces, and it does not make an obsolete panel, or one whose breakers have a documented failure history, safe. Those are separate questions with separate answers — and where the era makes a brand worth checking, the report above says so on its own.
What the record cannot tell us
  • Whether the service is already 200 A. Nothing in the public record says so, and the number is stamped on the main breaker handle.
  • Whether the panel can stay where it is. A panel in a closet, over stairs or behind a door has to move, and that alone adds $1,500 to $5,000.
  • The floor area is not on the assessor record for this parcel, so there is no honest basis for a tonnage — and without a tonnage there is no price.

This is an estimate, not a quote. It is built from this property’s public record and current City of Tucson market rates — nobody has seen your panel, your duct or your roof. A real price comes from a site visit, and the things that move it most are the ones listed above that no record carries.

Price it for your house →

Change the assumptions — the panel’s location, the duct, the tonnage, whether the service is overhead or underground — and watch the number move. That is the point of it.

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
128010040
Year constructed
1965 (assessor record)
Permitting authority
Tucson
Zoning
C-2
Living area
334,672 sq ft
Estimated electrical service era
approximately 100 A (estimated from the year built, 1965 — not a measurement; verify on site)

The living area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 86 building permits for this parcel dated between 1997 and 2026. By category the work is addition / alteration (23), fire automatic extinguishing system (20), trade permit (16) and permanent sign (7). 52 of them carry a final inspection; the other 34 were issued, expired or are still open, which is not the same as work completed. There are 2 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 128010040. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All property under construction · Commercial property in 85711 · Commercial & industrial reports · Homes in 85711 · Permit data by neighborhood

Planning work at this home?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E BROADWAY BL hold 6,206 City permits on record, 998 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (88 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0226-00222Commercial Addition/Alteration PermitIn Revision
2026CE-VIO0726-02895Code enforcement caseClosed - Administrative
2026TC-COM-0626-00932Commercial Addition/Alteration PermitNeeds Resubmittal
2026TZ-PMT-0226-00014Temporary Use PermitComplete
2026TF-FCP-0426-00255Fire Automatic Extinguishing System PermitComplete
2026TC-COM-0126-00086Commercial Addition/Alteration PermitInspections
2026TC-COM-0925-01782Commercial Addition/Alteration PermitInspections
2025TD-DEV-0325-00090Development PackageInspections
2025TS-PRM-0325-00079Permanent Sign PermitInspections Complete
2025TS-PRM-0325-00078Permanent Sign PermitExpired
2025TC-CFO-0125-00005Temporary Certificate-of-Occupancy (TCO)Complete
2025TC-CFO-0125-00002Temporary Certificate-of-Occupancy (TCO)Denied
2024TC-CFO-1224-00282Temporary Certificate-of-Occupancy (TCO)Denied
2024TF-FCP-1124-00990Fire Automatic Extinguishing System PermitComplete
2024TC-COM-0324-00404Commercial Addition/Alteration PermitInspections
2024TC-COM-0524-00983Commercial Addition/Alteration PermitIssued
2024TF-FCP-0724-00526Fire Alarm System PermitComplete
2024TF-FCP-0824-00637Fire Alarm System PermitComplete
2024TF-FCP-0724-00574Fire Alarm System PermitWithdrawn
2024TF-FCP-0624-00522Fire Automatic Extinguishing System PermitComplete
2024TF-FCP-0424-00297Fire Automatic Extinguishing System PermitComplete
2024TF-FCP-0324-00182Fire Automatic Extinguishing System PermitComplete
2023TC-COM-1122-00061Commercial Addition/Alteration PermitComplete
2023TP-PRE-0923-00329Pre-Application ConferenceComplete
2023TZ-CMP-0923-00183Zoning ComplianceComplete
2021T21CM05382Commercial Trade PermitComplete
2019T19FC01072Fire Alarm System PermitExpired
2019T19FO00837General Operational Fire PermitComplete
2019T19FC00816Fire Alarm System PermitComplete
2019T19FC00817Fire Alarm System PermitComplete
2019T19OT00840Permanent Sign PermitExpired
2019T19CM06368Commercial Addition/Alteration PermitCanceled
2019T19FC00469Fire Automatic Extinguishing System PermitComplete
2019T19FC00409Fire Alarm System PermitComplete
2019T19CM00123Commercial Addition/Alteration PermitComplete
2019T19FC00139Fire Automatic Extinguishing System PermitComplete
2019T18CM09775Commercial Addition/Alteration PermitCanceled
2019T18CM08317Commercial Trade PermitComplete
2019T18CM06882Commercial Addition/Alteration PermitComplete
2018T18OT00439Annual Portable Sign ComplianceCanceled
2018T18CM01944Commercial Addition/Alteration PermitComplete
2016T16FC00068Fire Automatic Extinguishing System PermitComplete
2016T16CM05638Commercial Addition/Alteration PermitCanceled
2014T14SA00449Zoning ComplianceComplete
2014T14DV06111EMERGENCYNOVERIFY
2012T12CM02130Commercial Trade PermitComplete
2010T10BU00041Fire Automatic Extinguishing System PermitComplete
2010T09CM03289Commercial Addition/Alteration PermitComplete
2009T09ME00257Commercial Trade PermitCanceled
2008T08BU01850Commercial Fence/Wall PermitWithdrawn
2008T08BU00847Fire Automatic Extinguishing System PermitComplete
2007T07BU02188Fire Automatic Extinguishing System PermitComplete
2007T07CM03411Commercial Addition/Alteration PermitCanceled
2007T07PL00875Residential Trade PermitComplete
2007T07PL00753Residential Trade PermitWithdrawn
2005T05PL00480Residential Trade PermitCanceled
2004T04EL01862Commercial Trade PermitComplete
2004T04CM03217Commercial Trade PermitComplete
2003T03CM05536Commercial Addition/Alteration PermitWithdrawn
2003T03OT01827Permanent Sign PermitComplete
2003T03OT01719Permanent Sign PermitComplete
2003T03CM03557Commercial Addition/Alteration PermitCanceled
2003T03BU01836Fire Automatic Extinguishing System PermitComplete
2003T03BU01695Fire Automatic Extinguishing System PermitComplete
2003T03OT01097Permanent Sign PermitCanceled
2003T03CM02288Commercial Addition/Alteration PermitComplete
2003T03CM01471Commercial Addition/Alteration PermitComplete
2002T02BU03134Fire Automatic Extinguishing System PermitComplete
2002T02CM05373Commercial Addition/Alteration PermitComplete
2002T02CM01433Commercial Addition/Alteration PermitWithdrawn
2002T02OT00181Permanent Sign PermitComplete
2001T01BU03554Fire Automatic Extinguishing System PermitWithdrawn
2001T01EL01969Residential Trade PermitCanceled
2000T00BU01524Fire Automatic Extinguishing System PermitComplete
2000T00CM00593Commercial Addition/Alteration PermitCanceled
1999T99EL02958Commercial Trade PermitComplete
1999T99EL01367Commercial Trade PermitCanceled
1999T99BU01587Fire Automatic Extinguishing System PermitComplete
1999T99CM00927Commercial New Building PermitComplete
1999T99BU00924Fire Automatic Extinguishing System PermitComplete
1999T99CM00734Commercial New Building PermitWithdrawn
1999T99CM00030Commercial Trade PermitWithdrawn
1999T99EL00211Commercial Trade PermitWithdrawn
1998T98EL01782Commercial Trade PermitComplete
1998T98EL01357Commercial Trade PermitComplete
1997T97BU01617Fire Automatic Extinguishing System PermitComplete
1997T97BU00911Fire Automatic Extinguishing System PermitComplete
1997T97CM01202Commercial Addition/Alteration PermitWithdrawn

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 128010040 — 86 City permits on file from 1997 to 2026 and 2 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.