Electrical permit history — 6110 E 5th St

6110 E 5th St, Tucson — built 1971, with 25 permits on record. Review electrical, HVAC and remodel history with links to official records.

Multifamily property

6110 E 5th St

Built 1971 — 1970s multifamily stock · HVAC 1998 (finaled)

Parcel
12714003E
Built
1971 (county record)
Jurisdiction
Tucson
Zoning
R-3
Assessor use
Apartments 25 - 99 Units 3 Or More Story
Parcel size
5.24 acres
Building area
88,689 sq ft (assessor record)
Sewer
Connection on file (1971) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 6110 E 5th St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 commercial building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalLikely dueLast permitted 1998 (28 years ago). Contractor of record: CARRIER CORPORATION ,. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T98CM02176 — CHILLER & BOILER & WATER HEATER:REPLACEMENT
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2025-07-03 (TC-COM-0725-01297) — The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs..

Permit history (25)

Permit history for this parcel — 8 of 25 records
DateRecordWhatStatusValue
2025-07-03finaledTC-COM-0725-01297City permit recordCommercial BuildingThe MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.Complete
2025-07-03TE-FPU-0725-00264City permit recordFloodplain UseVoid - not in a floodplain/FPU not needed. The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.Needs resubmittal
2025-02-03finaledTZ-CMP-0225-00019City permit recordPool / spaI am seeking a zoning letter with the following zoning information required by HUD for the property: Permitted Use: Minimum Setbacks Front: Minimum Setbacks Side: Minimum Setbacks Rear: Maximum Building Height: Minimum Lot Area: Minimum Lot Width: Maximum Building Coverage: # Required Regular Parking Spaces: # Required Handicap Parking Spaces: # Required Total Parking Spaces:Complete
2024-07-01finaledTZ-CMP-0724-00084City permit recordZoning Verification LetterPlease provide a letter on agency letterhead outlining the Zoning Designation and a Brief Description of the property at 6110 E 5th St, Tucson, AZ 85711 as follows: 1. What is the current zoning of the property? 2. Is this project part of an approved Site Plan or Planned Development? If so, please provide copies. 3. Was this property granted any variances, special exceptions or conditional use permits or zoning relief of any kind? If so, please provide a copy(s). 4. Are there any open/active zoning or building violations of the property? Attached for your reference is PDSD's reply to a similar request for this property from 6/23/22. HUD requires that this letter be more recent, so we are unable to use the older letter. Thank you, Brandon Matheson Manager MARQUEE 5 LLC 520-548-0472Complete
2021-08-04finaledT21RW03619City permit recordPool / spaOne geotechnical boring with soil sampling and testing 20 feet depth drilled on the slow eastbound lane of 5th Street west of Wilmot Road. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.Final
2020-08-29finaledT20BU00345City permit recordFence / wallSITE WALL 6'Final
2019-09-09finaledT19CM06533City permit recordCOMBOINTERIOR REMODEL- WASHER DRYER CLOSETFinal
2019-09-09finaledT19CM06534City permit recordCOMBOINTERIOR REMODEL- WASHER DRYER CLOSETFinal
Show 17 older records
Permit history for this parcel — remaining 17 records
DateRecordWhatStatusValue
2019-09-09finaledT19CM06535City permit recordCOMBOINTERIOR REMODEL- WASHER DRYER CLOSETFinal
2019-09-09finaledT19CM06536City permit recordCOMBOINTERIOR REMODEL- WASHER DRYER CLOSETFinal
2019-09-09finaledT19CM06537City permit recordCOMBOINTERIOR REMODEL- WASHER DRYER CLOSETFinal
2019-09-09finaledT19CM06539City permit recordCOMBOINTERIOR REMODEL- WASHER DRYER CLOSETFinal
2017-06-12finaledT17CM04536City permit recordCOMBO(T17DV02191) WATER DAMAGE REPAIRFinal
2016-09-13finaledT16OT01122City permit recordSIGN90 DAY PERMIT EXPIRES DEC 8TH 2016Final
2016-05-26expired 2017-03-07T16OT00651City permit recordSIGN90 DAY BANNER 5/26/16 - 08/24/2016Expired
2016-02-09expired 2016-05-15T16OT00173City permit recordSIGN90 DAY BANNER 02/15/16-05/15/2016Expired
2015-11-10expired 2016-01-30T15OT01513City permit recordSIGN(T15DV07197) 90DAY BANNERExpired
2011-10-21expired 2012-07-17T11OT01994City permit recordSIGNBANNER; 90 DAY, 10/19/11 - 01/17/11Closed
2011-07-20finaledT11OT01435City permit recordSIGNBANNER: 90DAYS START: 07/20/11 END: 10/18/11Final
2009-05-19expired 2009-08-20T09OT01003City permit recordSIGN16689Closed
2009-03-13finaledT09BU00364City permit recordBUILDREPAIR: VEHICLE DAMAGE ; T09DV00877Final
2006-08-09finaledT06EL01567City permit recordELECTREPAIR: ELECTRICAL LINE (APA)Final
2005-01-20finaledT05CM00253City permit recordCOMBOREPAIR:AUTO DAMAGE TO BALCONY:PORCH T04VL00861Final
1998-05-19finaledT98CM02176City permit recordCOMBOCHILLER & BOILER & WATER HEATER:REPLACEMENTFinal
1998-04-20finaledT98BU00980City permit recordBUILDCARPORTS:SEMI-CANT:TD#02-56-12Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (33)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 33 records
DateRecordWhatStatus
2025-11-07CE-VIO1125-04914Code enforcement caseRefuseReferred
2021-08-03T21DV04933Code enforcement caseCode enforcement caseNoverify
2020-09-04T20DV06097Code enforcement caseCode enforcement caseVoid
2019-12-18T19DV09454Code enforcement caseCode enforcement caseNoverify
2019-02-28T19DV01348Code enforcement caseCode enforcement caseComplian
2019-02-19T19DV01086Code enforcement caseRefuseComplian
2018-03-18T18DV01409Code enforcement caseFireComplian
2017-05-27T17DV02191Code enforcement caseCode enforcement caseComplian
Show 25 older records
Code enforcement history for this parcel — remaining 25 records
DateRecordWhatStatus
2017-05-27T17DV02192Code enforcement caseCode enforcement caseComplian
2017-01-24T17DV00335Code enforcement caseCode enforcement caseNoverify
2017-01-13T17DV00204Code enforcement caseCode enforcement caseComplian
2016-03-11T16DV01426Code enforcement caseCode enforcement caseComplian
2015-09-29T15DV07197Code enforcement caseCode enforcement caseComplian
2015-09-08T15DV06512Code enforcement caseCode enforcement caseNoverify
2015-06-16T15DV04446Code enforcement caseCode enforcement caseNoverify
2015-02-26T15DV01338Code enforcement caseFireNoverify
2011-02-03T11DV00715Code enforcement caseCode enforcement caseNoverify
2009-02-24T09DV00877Code enforcement caseCode enforcement caseComplian
2008-05-28T08DV04480Code enforcement caseSignComplian
2008-02-27T08DV01618Code enforcement caseCode enforcement caseNoverify
2007-10-03T07DV10333Code enforcement caseSignComplian
2007-09-04T07DV08721Code enforcement caseCode enforcement caseNoverify
2007-08-15T07DV07746Code enforcement caseCode enforcement caseInvalid
2007-04-13T07DV03330Code enforcement caseRefuseCancel
2007-04-13T07DV03336Code enforcement caseCode enforcement caseComplian
2006-10-17T06DV01355Code enforcement caseCode enforcement caseComplian
2006-10-02T06DV01290Code enforcement caseElectricalCancel
2004-12-28T04VL00861Code enforcement caseElectricalComplian
2003-08-18T03DV00768Code enforcement caseCode enforcement caseComplian
2001-06-26T01VL01862Code enforcement caseElectricalClosed
2001-06-19T01VL01736Code enforcement caseCode enforcement caseClosed
2000-03-23T00VL00353Code enforcement caseWork without permitComplian
1998-11-25T98VL01291Code enforcement caseSignComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12714003E — 25 permits on file from 1998 to 2025 (9 combo, 7 sign, 2 pool / spa, 2 build) and 33 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.