Electrical permit history — 5770 E 10th St

5770 E 10th St, Tucson — built 1962, with 10 permits on record. Review electrical, HVAC and remodel history with links to official records.

Multifamily property

5770 E 10th St

Built 1962 — 1960s multifamily stock · 10 permits on record; no permitted panel/service or HVAC work among them

Parcel
127122710
Built
1962 (county record)
Jurisdiction
Tucson
Zoning
R-3
Assessor use
Apartments 25 - 99 Units 2 Story
Parcel size
0.63 acres
Building area
18,114 sq ft (assessor record)
Sewer
Connection on file (1962) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 5770 E 10th St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    There is an electrical reconnect permit from 2014. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

Recorded sales (3)

Recorded transfers from the Pima County Assessor — 3 of 3
DatePriceType
2019-01-18$1,960,000Warranty Deed
2002-09-23$730,000Warranty Deed
2000-08-21$710,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2017-07-05 (T17OT00690) — 2- NON ILLUM WALL SIGNS.

Permit history (10)

Permit history for this parcel — 8 of 10 records
DateRecordWhatStatusValue
2017-07-05finaledT17OT00690City permit recordFence / wall2- NON ILLUM WALL SIGNSFinal
2014-11-04finaledT14CM07466City permit recordCOMBORECONNECT ELECTRIC;RESFinal
2012-09-17finaledT12CM05777City permit recordCOMBORECONNECT:ELECTRIC:RESFinal
2012-07-10finaledT12CM04130City permit recordCOMBOELECTRIC RECONNECTFinal
2011-06-07finaledT11EL01586City permit recordELECTRECONNECT:ELECTRIC APTFinal
2009-04-28finaledT09EL01002City permit recordELECTRECONNECT: ELECTRIC (APT # 20)Final
2003-10-28finaledT03EL02121City permit recordELECTELECTRIC:RECONNECTFinal
2003-09-04T03AN00887City permit recordADDRNEWIssued
Show 2 older records
Permit history for this parcel — remaining 2 records
DateRecordWhatStatusValue
2003-09-04finaledT03EL01791City permit recordELECTELECTRIC:RECONNECTFinal
1997-05-01finaledT97EL00498City permit recordELECTRECONNECT:APTFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (21)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 21 records
DateRecordWhatStatus
2025-04-28CE-VIO0425-01750Code enforcement caseRefuseClosed - unfounded
2024-03-26CE-VIO0324-01168Code enforcement caseRefuseClosed - unfounded
2024-03-11CE-VIO0324-00958Code enforcement caseRefuseClosed - resolved
2023-02-07CE-VIO0223-01782Code enforcement caseCode enforcement caseClosed - resolved
2022-06-01T22DV03230Code enforcement caseRefuseNoverify
2022-04-25T22DV02626Code enforcement caseElectricalComplian
2021-09-15T21DV06476Code enforcement caseRefuseNoverify
2021-03-12T21DV01428Code enforcement caseRefuseNoverify
Show 13 older records
Code enforcement history for this parcel — remaining 13 records
DateRecordWhatStatus
2019-08-01T19DV06180Code enforcement caseCode enforcement caseComplian
2018-04-18T18DV02160Code enforcement caseCode enforcement caseCancel
2018-04-04T18DV01860Code enforcement caseWork without permitComplian
2013-09-06T13DV06634Code enforcement caseElectricalComplian
2012-10-01T12DV09224Code enforcement caseElectricalNoverify
2011-10-26T11DV08759Code enforcement caseCode enforcement caseComplian
2011-04-14T11DV02584Code enforcement caseRefuseNoverify
2010-12-01T10DV08671Code enforcement caseCode enforcement caseComplian
2010-07-20T10DV04702Code enforcement caseCode enforcement caseNoverify
2010-03-11T10DV01253Code enforcement caseCode enforcement caseComplian
2008-12-09T08DV11226Code enforcement caseCode enforcement caseComplian
2006-08-07T06DV01053Code enforcement caseCode enforcement caseComplian
2004-07-30T04DV00636Code enforcement caseCode enforcement caseVoid

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 127122710 — 10 permits on file from 1997 to 2017 (5 elect, 3 combo, 1 fence / wall, 1 addrnew) and 21 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.