Electrical permit history — 535 N Wilmot Rd

535 N Wilmot Rd, Tucson — built 1991, with 62 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

535 N Wilmot Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1991 — 1990s commercial stock · HVAC 2010 (finaled)

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalLikely dueLast permitted 2010 (16 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T10ME00427 — Install new 3ton package heat pump.
  • Fire alarm & life safetyFinaled permit foundLast permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0223-00361 — Install a TG 7 radio dialer for monitoring
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2007. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

  • Routine

    A trade permit was pulled in 2015. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 27,957 sq ft (county building-footprint layer, 6 structures; 2 neighbouring structures crossing the lot line excluded)
Usable for solar, planning estimate
≈ 19,600 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 220 kW — roughly 550 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 360,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$29,000–$47,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 2.9 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
12709001F
Year constructed
1991 (assessor record)
Permitting authority
Tucson
Zoning
OCR-2
Property type
Medical Clinic No Pharmacy
Building area
42,454 sq ft

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 62 building permits for this parcel dated between 1999 and 2026. By category the work is fire automatic extinguishing system (15), addition / alteration (12), permanent sign (12) and state licensed facility operational fire (11). 57 of them carry a final inspection; the other 5 were issued, expired or are still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 12709001F. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85711 · Commercial & industrial reports · Homes in 85711 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on N WILMOT RD hold 1,672 City permits on record, 269 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (62 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TF-FOP-0626-00868State Licensed Facility Operational Fire PermitFees Due
2025TF-FOP-0225-00176State Licensed Facility Operational Fire PermitComplete
2024TF-FOP-1223-01988State Licensed Facility Operational Fire PermitComplete
2023TF-FOP-0423-00917State Licensed Facility Operational Fire PermitComplete
2023TF-FCP-0223-00361Fire Alarm System PermitComplete
2021T21FO00904State Licensed Facility Operational Fire PermitComplete
2021T21FC00876Fire Alarm System PermitComplete
2021T21FC00839Fire Automatic Extinguishing System PermitComplete
2021DP21-0151Development PackageIssued
2021T21CM05430Commercial Addition/Alteration PermitComplete
2021S21-015 Land Split/Lot SplitComplete
2020T20FO00661State Licensed Facility Operational Fire PermitComplete
2020T20SA00164Zoning ComplianceComplete
2020T20SA00135Zoning ComplianceComplete
2020T20FC00225Fire Alarm System PermitComplete
2020T20FC00112Fire Alarm System PermitComplete
2020T19FC01063Fire Automatic Extinguishing System PermitComplete
2020T20FO00013State Licensed Facility Operational Fire PermitComplete
2019T19FO01137State Licensed Facility Operational Fire PermitComplete
2019T19FC00867Fire Automatic Extinguishing System PermitExpired
2019T19CM03213Commercial Addition/Alteration PermitComplete
2018T18FO00819State Licensed Facility Operational Fire PermitComplete
2017T17FC00724Fire Alarm System PermitExpired
2017T17FO00475State Licensed Facility Operational Fire PermitComplete
2017T17FO00464State Licensed Facility Operational Fire PermitComplete
2015T15BU01229Fire Automatic Extinguishing System PermitComplete
2015T15BU01138Commercial Trade PermitComplete
2015T15CM06092Commercial Addition/Alteration PermitComplete
2015T15OT00149Permanent Sign PermitComplete
2014T14BU00322Fire Automatic Extinguishing System PermitComplete
2014T14CM01230Commercial Addition/Alteration PermitComplete
2010T10BU01552Fire Automatic Extinguishing System PermitComplete
2010T10ME00427Residential Trade PermitComplete
2009T08OT00540Commercial Addition/Alteration PermitComplete
2008T08OT00266Permanent Sign PermitComplete
2007T07BU01787Fire Automatic Extinguishing System PermitComplete
2007T07CM03379Commercial Addition/Alteration PermitComplete
2007T07BU00110Fire Automatic Extinguishing System PermitComplete
2007T07OT00134Permanent Sign PermitCanceled
2007T06CM06546Commercial Addition/Alteration PermitComplete
2007T06BU02993Fire Automatic Extinguishing System PermitComplete
2007T06CM06222Commercial Addition/Alteration PermitComplete
2006T06BU02645Fire Automatic Extinguishing System PermitComplete
2006T06BU02346Fire Automatic Extinguishing System PermitComplete
2006T06CM04550Commercial Addition/Alteration PermitComplete
2005T05OT01127Permanent Sign PermitComplete
2005T05OT01125Permanent Sign PermitComplete
2005T05OT00470Permanent Sign PermitComplete
2005T05OT00085Permanent Sign PermitComplete
2003T03OT02063Permanent Sign PermitComplete
2003T03CM04873Commercial Trade PermitComplete
2003T03OT01546Permanent Sign PermitComplete
2003T03OT01255Permanent Sign PermitComplete
2003T03CM02487Commercial Addition/Alteration PermitComplete
2003T03BU01562Fire Automatic Extinguishing System PermitComplete
2003T03OT00930Permanent Sign PermitComplete
2003T03OT00931Permanent Sign PermitComplete
2003T03BU00782Fire Automatic Extinguishing System PermitComplete
2003T03BU00696Fire Automatic Extinguishing System PermitComplete
2003T03CM00921Commercial Addition/Alteration PermitComplete
2003T03CM01197Commercial Addition/Alteration PermitComplete
1999T99BU02331Fire Automatic Extinguishing System PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 12709001F — 62 City permits on file from 1999 to 2026 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.