Electrical permit history — 3130 E Broadway Bl

3130 E Broadway Bl, Tucson — built 2001, with 15 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3130 E Broadway Bl

Built 2001 — 2000s commercial stock · 15 permits on record; no permitted panel/service or HVAC work among them

Parcel
12621001D
Built
2001 (assessor record)
Jurisdiction
Tucson
Zoning
O-2
Assessor use
Office Building 1 Story
Parcel size
0.79 acres
Building area
8,463 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Colonia Solana Residential Historic District — National Register district (City of Tucson)

See the property

County aerial photograph centered on 3130 E Broadway Bl, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2019 (7 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T19FC00639 — ADDING DMP NETWORK RADIO FOR DUAL PATH TO SIT AWAY FROM PANEL- ALREADY HAS DMP CELL RADIO ON PANEL.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

Most recent permit on record for this parcel: 2026-03-25 (TF-FOP-0326-00421) — IOP Services.

Permit history (15)

Permit history for this parcel — 8 of 15 records
DateRecordWhatStatusValue
2026-03-25finaledTF-FOP-0326-00421City permit recordFire OperationalIOP ServicesComplete
2026-03-25finaledTF-FOP-0326-00422City permit recordFire OperationalIOP ServicesComplete
2025-07-02finaledTR-UTL-0725-01056City permit recordRight-of-Way (ROW) - UtilityWO T154342 - TEP will be removing 1 pole in the ROW a 2'x2' hole 6' deep will be backfilled without sidewalk impact.Complete
2025-04-23finaledTR-UTL-0425-00683City permit recordRight-of-Way (ROW) - UtilityPRJ292060-1: Cox to trench 20' to install CATV conduit for system tie.Complete
2024-10-01finaledTF-FOP-1024-01108City permit recordFire OperationalSonora Behavioral Health Outpatient- North BuildingComplete
2024-10-01finaledTF-FOP-1024-01109City permit recordFire OperationalSonora Behavioral Hospital Outpatient- South BuildingComplete
2024-02-19finaledTS-PRM-0224-00070City permit recordSign - Permanent(3) New signsInspections complete
2023-07-24finaledTF-FOP-0723-01282City permit recordFire OperationalSonoran Behavioral Health Outpatient- South BuildingComplete
Show 7 older records
Permit history for this parcel — remaining 7 records
DateRecordWhatStatusValue
2023-07-24finaledTF-FOP-0723-01283City permit recordFire OperationalSonoran Behavioral Health- North BuildingComplete
2022-03-09finaledT22RW00880City permit recordROWU of A WILL BE GATHERING HEALTH RELATED DATA POST APPLICATION OF A NEW PRODUCT TO THE ROADWAY. PREVIOUS PERMIT NUMBER T21RW04658 PROJECT LIMITS ARE WITHIN VARIOUS LOCATIONS ON COUNTRY CLUB RD BETWEEN BROADWAY BL AND AVIATION HWY. PROJECT WILL IMPACT BOTH ROADWAY AND SHOULDER AREAS. U of A, Targeted schedule, April 2nd, April 3rd, and April 10th. They will use April 9th as a back up day if the 2nd or 3rd are rainy or unseasonably cold. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-10-13finaledT21RW04658City permit recordROWU of A WILL BE GATHERING HEALTH RELATED DATA PRIOR TO AN APPLICATION OF A NEW PRODUCT TO THE ROADWAY ON AN UNSPECIFIED FUTURE DATE. PROJECT LIMITS ARE WITHIN VARIOUS LOCATIONS ON COUNTRY CLUB RD BETWEEN BROADWAY BL AND AVIATION HWY. PROJECT WILL IMPACT BOTH ROADWAY AND SHOULDER AREAS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2019-08-14finaledT19FC00639City permit recordFIRECONSADDING DMP NETWORK RADIO FOR DUAL PATH TO SIT AWAY FROM PANEL- ALREADY HAS DMP CELL RADIO ON PANEL.Final
2019-07-01finaledT19FC00508City permit recordFIRECONSRelocate 9 PendantsFinal
2019-04-12finaledT19RW02010City permit recordROWTEP will be replacing 2 sub-transmission poles with distribution under-built at the intersection of Broadway and Country Club on the southeast. New poles will be 25" in diameter at ground level. City of Tucson, Zayo, Cox, WorldCom, XCC, Time Warner, and CenturyLink are also attached to the pole. Sidewalks will be repaired as needed per PAG SD 200. 04/18/2019-PLAN CHANGE START DATE CHANGED; FROM 04/22/2019-TO 04/17/2019Final
2000-09-11D00-0054City permit recordDevelopment PackageCOLONIA SOLANAApproved

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (2)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 2 of 2 records
DateRecordWhatStatus
2018-10-09T18DV06543Housing code violationOBSTR DEAD TREES AND SHRUBSrecorded before 2023COMPLIAN
2017-08-11T17DV03621Housing code violationENVIRONMENTALrecorded before 2023COMPLIAN

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12621001D — 15 permits on file from 2000 to 2026 (6 fire operational, 3 row, 2 right-of-way (row) - utility, 2 firecons) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).