Electrical permit history — 995 S Lakeshore Ln

995 S Lakeshore Ln, Tucson — built 1953, with 518 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

995 S Lakeshore Ln

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1953 — 1950s commercial stock · last permitted panel/service work 2023 (finaled); a newer 2024 permit is issued · HVAC 2019 (finaled)

Is it time to upgrade?

  • Electrical service & distributionFinaled permit foundA newer 2024 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “AE P24014 Reid Park EV Chargers - Adding a new service and 3 EV chargers CIP permit CIP-0724-00023”. Last permitted 2023 (3 years ago). City inspection record: TRSP - ROW - Final/Close-Out approved 2024-01-24. Applicant on the permit: Desert Barricades LLC. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TR-UTL-1123-02897 — WO T43255 - TEP will be working in ROW to install conductor in contractor provided conduit. installation of existing transformer and meter panel for new service. TCP attached.
  • Heating, cooling & mechanicalFinaled permit foundLast permitted 2019 (7 years ago). City inspection record: MECHANICAL - FINAL approved 2019-08-20. Contractor of record: T R S AIR CONDITIONING SERVICES AND CONSTRUCTION. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T19CM04944 — HVAC UPGRADE
  • Fire alarm & life safetyFinaled permit foundLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0225-00114 — EXPEDITE Installing 70lf of 4" PVC Fire Line
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A finaled 2023 panel/service permit is on record for this parcel, which makes it unlikely the original 60–100 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2024. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Solar and energy potential

Roof footprint
≈ 452,885 sq ft (county building-footprint layer, 101 structures)
Usable for solar, planning estimate
≈ 317,000 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 3,490 kW — roughly 8,730 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 5,740,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$459,000–$746,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacity — mapped saturation areaThis property sits in or on the edge of “El Con Mall - Reid Park Area”, one of 11 areas TEP has mapped as saturated with distributed generation (customer solar) relative to circuit capacity. On a saturated circuit, new solar or battery systems can trigger supplemental utility review before interconnection is approved — and a large new load such as DC fast charging or process equipment is worth a capacity conversation with TEP before a site plan hardens. The boundary here is approximate, digitized from TEP’s map of the area (PDF, July 2020); TEP’s own interconnection screening is the authority, and circuit status can have changed since the maps were published.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
12620001C
Year constructed
1953 (county record)
Permitting authority
Tucson
Zoning
R-1
Property type
Municipal Commercial Property
Sewer
Connection on file (2012, 2019, 2024) (county sewer connection records)
Flood zone
A — Special Flood Hazard Area (FEMA)
Service on record
City records show the 2023 permit was finalized; the permit description states “WO T43255 - TEP will be working in ROW to install conductor in contractor provided conduit. installation of existing transformer and meter panel for new service. TCP attached.”.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 518 building permits for this parcel dated between 2002 and 2026. By category the work is fireoper (79), tents (57) and fire operational (43). 347 of them carry a final inspection; the other 171 were issued, expired or are still open, which is not the same as work completed. There are 54 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 12620001C. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All institutional and public property · Commercial property in 85716 · Commercial & industrial reports · Homes in 85716 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

Complete permit record (572 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0826-01314Commercial BuildingSubmitted - online
2026TC-COM-0826-01306Commercial BuildingSubmitted - online
2026TR-UTL-0726-01259Right-of-Way (ROW) - UtilityIssued
2026TD-DEV-0626-00147Development PackageApproved - awaiting cust
2026TR-ROW-0426-00451Right-of-Way (ROW)Complete
2026TR-ROW-0426-00441Right-of-Way (ROW)Complete
2026TC-COM-0426-00454Commercial BuildingVoid
2026TC-COM-0426-00455Commercial BuildingVoid
2026TC-COM-0426-00457Commercial BuildingNeeds resubmittal
2026TC-UTL-0326-00026Utilities PermitFees due
2026TD-DEV-0226-00052Development PackageIssued
2026TR-UTL-0226-00410Right-of-Way (ROW) - UtilityComplete
2026TF-FOP-0226-00267Fire Operational PermitComplete
2026TC-COM-0226-00205Commercial BuildingFees due
2026TC-COM-0226-00168Commercial BuildingInspections
2026TF-FOP-0126-00004Fire Operational PermitComplete
2025TE-FPU-1125-00438Floodplain UseIssued
2025TC-COM-1125-02115Commercial BuildingInspections
2025TR-UTL-1125-01969Right-of-Way (ROW) - UtilityComplete
2025TF-FOP-1125-01448Fire Operational PermitComplete
2025TF-FOP-1025-01442Fire Operational PermitComplete
2025TE-FPU-1025-00393Floodplain UseNeeds resubmittal
2025TF-FOP-1025-01361Fire Operational PermitComplete
2025TF-FOP-0925-01238Fire Operational PermitVoid
2025TF-FOP-0925-01240Fire Operational PermitComplete
2025TF-FOP-0925-01218Fire Operational PermitVoid
2025TF-FOP-0925-01219Fire Operational PermitVoid
2025TR-ROW-0925-01124Right-of-Way (ROW)Needs resubmittal
2025TC-COM-0925-01667Commercial BuildingComplete
2025TE-FPU-0925-00351Floodplain UseVoid
2025TF-FCP-0625-00481Fire Construction PermitComplete
2025TR-ROW-0625-00787Right-of-Way (ROW)Complete
2025TR-ROW-0625-00780Right-of-Way (ROW)Void
2025TC-COM-0525-01074Commercial BuildingIssued
2025TR-ROW-0525-00710Right-of-Way (ROW)Complete
2025TR-ROW-0525-00633Right-of-Way (ROW)Complete
2025TR-ROW-0525-00623Right-of-Way (ROW)Void
2025TF-FOP-0425-00561Fire Operational PermitComplete
2025TR-SWF-0425-00060Right-of-Way Small WirelessComplete
2025TC-COM-0325-00596Commercial BuildingInspections
2025TF-FOP-0325-00324Fire Operational PermitComplete
2025TF-FOP-0225-00258Fire Operational PermitComplete
2025TF-FOP-0225-00213Fire Operational PermitComplete
2025TC-COM-0225-00257Commercial BuildingApproved
2025TF-FCP-0225-00114Fire Construction PermitComplete
2025TF-FCP-0225-00115Fire Construction PermitComplete
2025TF-FCP-0225-00116Fire Construction PermitComplete
2025TF-FCP-0225-00117Fire Construction PermitComplete
2025TF-FCP-0125-00092Fire Construction PermitVoid
2025TR-ROW-0125-00104Right-of-Way (ROW)Complete
2025TF-FCP-0125-00022Fire Construction PermitIssued
2024TF-FCP-1224-01124Fire Construction PermitInspections complete
2024TF-FCP-1224-01118Fire Construction PermitExpired
2024TF-FOP-1224-01535Fire Operational PermitComplete
2024TC-COM-1124-02202Commercial BuildingIssued
2024TC-COM-1124-02203Commercial BuildingWithdrawn
2024TC-COM-1124-02204Commercial BuildingComplete
2024TF-FOP-1124-01315Fire Operational PermitComplete
2024TC-COM-1124-02132Commercial BuildingInspections
2024TF-FOP-1024-01231Fire Operational PermitVoid
2024TF-FOP-1024-01232Fire Operational PermitComplete
2024TF-FCP-0924-00833Fire Construction PermitExpired
2024TC-COM-0924-01864Commercial BuildingComplete
2024TF-FOP-0924-01094Fire Operational PermitComplete
2024TR-ROW-0924-01056Right-of-Way (ROW)Complete
2024TF-FOP-0924-01007Fire Operational PermitComplete
2024TC-COM-0924-01705Commercial BuildingComplete
2024TC-COM-0824-01670Commercial BuildingComplete
2024TC-COM-0824-01633Commercial BuildingComplete
2024TC-COM-0724-01305Commercial BuildingComplete
2024TZ-PMT-0624-00045Zoning Permit AnnualComplete
2024TF-FCP-0624-00492Fire Construction PermitVoid
2024TC-UTL-0624-00028Utilities PermitExpired
2024TF-FOP-0624-00684Fire Operational PermitComplete
2024TR-UTL-0524-01090Right-of-Way (ROW) - UtilityComplete
2024TD-DEV-0524-00156Development PackageIssued
2024TR-UTL-0524-00968Right-of-Way (ROW) - UtilityComplete
2024TR-ROW-0524-00562Right-of-Way (ROW)Complete
2024TR-ROW-0524-00538Right-of-Way (ROW)Complete
2024TC-FBB-0424-00061Factory Built BuildingsIssued
2024TR-ROW-0424-00423Right-of-Way (ROW)Complete
2024TR-ROW-0424-00417Right-of-Way (ROW)Void
2024TE-FPU-0424-00108Floodplain UseIssued
2024TC-COM-0324-00450Commercial BuildingInspections complete
2024TD-DEV-0224-00060Development PackageVoid
2024TF-FOP-0224-00220Fire Operational PermitComplete
2024TF-FOP-0224-00202Fire Operational PermitComplete
2024TR-UTL-0124-00078Right-of-Way (ROW) - UtilityComplete
2023TC-CFO-1223-00242Certificate of OccupancyDenied
2023TR-ROW-1223-01439Right-of-Way (ROW)Complete
2023TF-FOP-1223-01916Fire Operational PermitComplete
2023TF-FOP-1223-01872Fire Operational PermitComplete
2023TR-ROW-1123-01383Right-of-Way (ROW)Complete
2023TR-ROW-1123-01356Right-of-Way (ROW)Complete
2023TR-UTL-1123-02897Right-of-Way (ROW) - UtilityComplete
2023TF-FOP-1123-01729Fire Operational PermitVoid
2023TF-FOP-1123-01726Fire Operational PermitComplete
2023TC-CFO-1023-00203Certificate of OccupancyComplete
2023TF-FOP-1023-01683Fire Operational PermitVoid
2023TF-FOP-1023-01589Fire Operational PermitVoid
2023TC-UTL-0923-00085Utilities PermitInspections
2023TC-CFO-0823-00113Certificate of OccupancyDenied
2023TF-FCP-0623-00801Fire Construction PermitComplete
2023TF-FOP-0623-01203Fire Operational PermitComplete
2023TR-ROW-0623-00890Right-of-Way (ROW)Complete
2023TF-FOP-0623-01173Fire Operational PermitVoid
2023TC-COM-0623-01422Commercial BuildingComplete
2023TC-COM-0523-01414Commercial BuildingVoid
2023TC-COM-0523-01329Commercial BuildingInspections
2023TD-DEV-0523-00249Development PackageInspections
2023TF-FOP-0523-01033Fire Operational PermitComplete
2023TF-FOP-0523-01023Fire Operational PermitVoid
2023TD-DEV-0523-00240Development PackageComplete
2023TF-FOP-0523-01014Fire Operational PermitComplete
2023TR-ROW-0523-00724Right-of-Way (ROW)Complete
2023TF-FOP-0523-00971Fire Operational PermitComplete
2023TR-ROW-0523-00688Right-of-Way (ROW)Complete
2023TF-FOP-0423-00838Fire Operational PermitComplete
2023TR-ROW-0423-00597Right-of-Way (ROW)Complete
2023TD-DEV-0323-00196Development PackageWithdrawn
2023TR-UTL-0323-01008Right-of-Way (ROW) - UtilityComplete
2023TR-UTL-0223-00946Right-of-Way (ROW) - UtilityComplete
2023TF-FOP-0223-00541Fire Operational PermitComplete
2023TC-UTL-0223-00045Utilities PermitIssued
2023TC-UTL-0223-00046Utilities PermitIssued
2023TC-DMO-0223-00049Demolition PermitComplete
2023TR-UTL-0123-00712Right-of-Way (ROW) - UtilityWithdrawn
2023TR-UTL-0123-00709Right-of-Way (ROW) - UtilityWithdrawn
2023TR-ROW-0123-00268Right-of-Way (ROW)Complete
2023TR-ROW-0123-00249Right-of-Way (ROW)Void
2023TR-ROW-0123-00238Right-of-Way (ROW)Complete
2023TR-ROW-0123-00222Right-of-Way (ROW)Complete
2023TF-FOP-0123-00306Fire Operational PermitComplete
2022TC-COM-1122-00125Commercial BuildingIssued
2022TC-COM-1122-00119Commercial BuildingVoid
2022TF-FOP-1122-00075Fire Operational PermitComplete
2022TF-FOP-1122-00076Fire Operational PermitComplete
2022TF-FOP-1122-00067Fire Operational PermitComplete
2022TF-FOP-1122-00068Fire Operational PermitComplete
2022TC-COM-1122-00076Commercial BuildingVoid
2022TF-FOP-1122-00050Fire Operational PermitCanceled
2022TD-DEV-1122-00010Development PackageVoid
2022T22CM07830Commercial BuildingExpired
2022T22CM07378Commercial BuildingComplete
2022T22FO00814FIREOPERFinal
2022T22SE00040Zoning Examiner Special ExceptionIn Review
2022T22CM07179Commercial BuildingIssued
2022T22FO00786Fire Operational PermitComplete
2022T22DV05273Code enforcement caseComplian
2022DP22-0261Development PackageComplete
2022T22FC00625Fire Construction PermitComplete
2022T22RW03220Right-of-Way (ROW)Complete
2022T22RW03223Right-of-Way (ROW)Needs resubmittal
2022T22CM06668Commercial BuildingComplete
2022DP22-0242Development PackageComplete
2022T22FO00676FIREOPERFinal
2022T22RW02773ROWFinal
2022T22FO00649FIREOPERFinal
2022T22CM05512Commercial BuildingWithdrawn
2022T22CM04926COMBOFinal
2022T22FO00578FIREOPERFinal
2022T22FO00411FIREOPERFinal
2022DP22-0098Development PackageComplete
2022T22CM02753Commercial BuildingComplete
2022T22CM02683Commercial BuildingComplete
2022T22FO00336FIREOPERFinal
2022T22CM02544Commercial BuildingComplete
2022T22FO00057FIREOPERFinal
2021T21RW05395ROWFinal
2021T21RW05089ROWFinal
2021T21FO00823FIREOPERFinal
2021T21RW04838Right-of-Way Small WirelessComplete
2021T21FO00685FIREOPERFinal
2021T21FO00663FIREOPERFinal
2021T21FO00569FIREOPERFinal
2021T21FO00525FIREOPERWithdrwn
2021DP21-0152Development PackageIssued
2021T21RW02280ROWFinal
2021T21CM03684Commercial BuildingComplete
2021T21CM03038COMBOWithdrwn
2021T21TUP0004Zoning Permit AnnualExpired
2021DP21-0058DEVPKGWithdrwn
2021T21BU00108DEMOWithdrwn
2021T21FC00151FIRECONSFinal
2021T21FC00160FIRECONSFinal
2021T21CM00065COMBOL of c
2020DP20-0266Development PackageComplete
2020T20OT00824SIGNFinal
2020T20CM08458Commercial BuildingComplete
2020T20RW06273ROWFinal
2020T20CM07977Commercial BuildingApproved
2020T20RW05931ROWFinal
2020T20CM06685COMBOFinal
2020DP20-0180Development PackageComplete
2020T20CM05716COMBOFinal
2020T20RW04225ROWFinal
2020T20CM04421COMBOFinal
2020T20FC00301FIRECONSFinal
2020T20CM02353COMBOL of c
2020T20CM01985COMBOFinal
2020DP20-0052Development PackageComplete
2020T20FO00189FIREOPERVoid
2020T20FO00190FIREOPERFinal
2020T20FO00192FIREOPERFinal
2020T20RW01521ROWFinal
2020T20OT00200Sign - PermanentComplete
2020T20RW01159ROWFinal
2020T20RW01109ROWFinal
2020T20FC00121Fire Construction PermitExpired
2020T20RW00764ROWFinal
2020DP20-0030Development PackageComplete
2020T20BU00038WALL/FENClosed
2020T20RW00053ROWFinal
2019T19RW07519ROWFinal
2019T19FO01043FIREOPERVoid
2019T19FO00960FIREOPERFinal
2019T19FO00838FIREOPERFinal
2019T19FO00757FIREOPERFinal
2019T19RW05449ROWFinal
2019T19RW05334ROWFinal
2019T19CM06714Commercial BuildingExpired
2019T19CM06405COMBOFinal
2019T19FO00660FIREOPERFinal
2019T19CM05698COMBOFinal
2019T19FO00605FIREOPERFinal
2019T19FO00567FIREOPERFinal
2019T19CM04981COMBOWithdrwn
2019T19CM04944COMBOFinal
2019T19FO00345FIREOPERFinal
2019T19FO00321FIREOPERVoid
2019T19FO00304FIREOPERFinal
2019T19FO00299FIREOPERFinal
2019T19FO00300FIREOPERFinal
2019T19CM02487COMBOFinal
2019T19FO00254FIREOPERFinal
2019T19FO00242FIREOPERFinal
2019T19FO00239FIREOPERFinal
2019T19FO00204FIREOPERFinal
2019T19FO00198FIREOPERFinal
2019T19FO00184FIREOPERFinal
2019T19FO00176FIREOPERFinal
2019T19CM01283COMBOFinal
2019T19RW00856ROWFinal
2019T19SE00005Zoning Examiner Special ExceptionApproved
2019T19CM00575COMBOFinal
2019T19CM00530COMBOFinal
2019DP19-0020Development PackageComplete
2019T19RW00388ROWFinal
2019T19CM00367COMBOL of c
2019T19CM00368COMBOExpired
2019DP19-0011Development PackageComplete
2019T19FO00040FIREOPERFinal
2018T18RW05685ROWFinal
2018DP18-0312Development PackageComplete
2018DP18-0309Development PackageComplete
2018T18CM09638COMBOL of c
2018T18FO01075FIREOPERFinal
2018DP18-0284Development PackageComplete
2018T18RW05179ROWFinal
2018DP18-0281Development PackageComplete
2018T18CM09133COMBOL of c
2018T18CM09001COMBOExpired
2018T18FO00992FIREOPERFinal
2018T18BU00615WALL/FENFinal
2018T18FO00944FIREOPERFinal
2018T18FO00927FIREOPERVoid
2018T18FO00897FIREOPERFinal
2018T18FO00864FIREOPERFinal
2018T18RW04402ROWFinal
2018T18FO00797FIREOPERFinal
2018T18CM06754COMBOWithdrwn
2018T18FO00692FIREOPERFinal
2018T18RW03610ROWWithdrwn
2018T18FO00646FIREOPERFinal
2018T18FO00594FIREOPERFinal
2018DP18-0173Development PackageComplete
2018T18CM05559COMBOL of c
2018T18FO00554FIREOPERFinal
2018T18FO00555FIREOPERFinal
2018T18FO00556FIREOPERFinal
2018T18RW02568ROWWithdrwn
2018T18FO00427FIREOPERFinal
2018T18RW02243ROWFinal
2018T18FO00306FIREOPERFinal
2018T18FO00302FIREOPERFinal
2018T18FO00288FIREOPERFinal
2018T18FO00269FIREOPERFinal
2018T18CM01491COMBOWithdrwn
2018T18CM01220COMBOExpired
2018T18RW00705ROWFinal
2018T18RW00558ROWFinal
2018T18RW00325ROWFinal
2018T18RW00114ROWFinal
2018T18DV00028RefuseComplian
2018T18RW00039ROWFinal
2017T17FC01037FIRECONSFinal
2017T17RW05464ROWFinal
2017T17FO01069FIREOPERFinal
2017T17FO01008FIREOPERFinal
2017T17FO01006FIREOPERFinal
2017T17FO00954FIREOPERFinal
2017T17FO00950FIREOPERFinal
2017T17RW04734ROWFinal
2017T17FO00885FIREOPERFinal
2017T17FO00878FIREOPERFinal
2017T17FO00854FIREOPERFinal
2017T17FO00857FIREOPERVoid
2017T17FO00846FIREOPERVoid
2017T17FO00814FIREOPERFinal
2017T17FO00779FIREOPERFinal
2017T17FO00766FIREOPERFinal
2017T17BU00432WALL/FENL of c
2017T17FO00737FIREOPERVoid
2017T17RW03738ROWFinal
2017T17RW03740ROWFinal
2017T17RW03476ROWFinal
2017T17FO00592FIREOPERFinal
2017DP17-0152Development PackageComplete
2017T17CM04951COMBOL of c
2017T17FC00445FIRECONSVoid
2017T17FC00440Fire Construction PermitExpired
2017T17CM03894COMBOExpired
2017T17FO00380FIREOPERFinal
2017T17FO00319FIREOPERFinal
2017T17RW01601ROWFinal
2017T17RW00923ROWFinal
2017T17FC00141FIRECONSFinal
2017T17FC00102FIRECONSFinal
2017T17FO00036FIREOPERFinal
2017T17RW00302ROWFinal
2017T17FO00025FIREOPERFinal
2017T17RW00045ROWFinal
2016T16FC00226Fire Construction PermitExpired
2016T16CM08581COMBOFinal
2016T16FO00099FIREOPERFinal
2016T16FO00094FIREOPERFinal
2016T16FO00096FIREOPERWithdrwn
2016T16RW02524ROWFinal
2016T16FO00046FIREOPERFinal
2016T16FO00040FIREOPERFinal
2016T16FO00030FIREOPERFinal
2016T16FO00024FIREOPERFinal
2016T16RW01708ROWFinal
2016T16FC00055FIRECONSFinal
2016T16RW01480ROWWithdrwn
2016DP16-0157Development PackageComplete
2016T16CM06690COMBOC of o
2016T16RW01322ROWFinal
2016T16RW00942ROWVoid
2016T16DV04611Code enforcement caseNoverify
2016T16CM05368COMBOFinal
2016T16BU00942SPKLRFinal
2016T16BU00842TENTSExpired
2016T16CM03679COMBOL of c
2016T16DV02975Code enforcement caseComplian
2016T16DV02974Code enforcement caseComplian
2016T16DV01878Code enforcement caseComplian
2016T16DV01882Code enforcement caseComplian
2016T16DV01881Code enforcement caseComplian
2016T16DV01880Code enforcement caseComplian
2016T16DV01879Code enforcement caseComplian
2016T16DV01765Code enforcement caseComplian
2016T16DV01764Code enforcement caseComplian
2016T16DV01762Code enforcement caseComplian
2016T16CM01669COMBOExpired
2016T16DV01188Code enforcement caseComplian
2016T16DV01191Code enforcement caseComplian
2016T16EX00605EXCAVExpired
2016T16TC00480BARRICADExpired
2016T16DV00945Code enforcement caseComplian
2016T16BU00262BUILDClosed
2015T15DV07106SignNoverify
2015T15CM05114COMBOL of c
2015DP15-0110Development PackageComplete
2015T15BU00798TENTSFinal
2015T15DV04240Code enforcement caseComplian
2015T15DV04250Code enforcement caseComplian
2015T15CM01231COMBOFinal
2015T15BU00088BUILDExpired
2014T14BU01138TENTSExpired
2014T14BU00911TENTSFinal
2014T14CM05174COMBOL of c
2014T14CM04806COMBOL of c
2014T14CM04638COMBOExpired
2014T14EX00498EXCAVClosed
2014T14EX00500EXCAVClosed
2014DP14-0027Development PackageComplete
2014T14CM00985COMBOFinal
2014DP14-0023Development PackageComplete
2014T14CM00853COMBOL of c
2014T14CM00733COMBOFinal
2013T13BU01373TENTSWithdrwn
2013T13CM07532COMBOL of c
2013T13BU01010TENTSFinal
2013T13CM04724COMBOL of c
2013T13CM03005COMBOL of c
2013T13OT00015PEDDLERRevoked
2012T12BU01460TANKSFinal
2012T12BU01441TENTSExpired
2012T12CM07171COMBOFinal
2012T12BU01105TENTSFinal
2012T12BU01106TENTSWithdrwn
2012T12BU01022TENTSExpired
2012T12CM04723COMBOFinal
2012T12BU00761DEMOClosed
2012T12CM03540COMBOWithdrwn
2012T12CM03503COMBOFinal
2012T12CM02629COMBOFinal
2012T12CM02630COMBOExpired
2012T12BU00604BUILDFinal
2012T12BU00380TENTSFinal
2012T12BU00352TENTSWithdrwn
2012T12EX00080EXCAVClosed
2012DP12-0015DEVPKGWithdrwn
2012T12BU00187DEMOFinal
2012T12CM00271COMBOFinal
2012T12CM00276COMBOFinal
2012T12EL00307ELECTFinal
2012T12EL00120ELECTFinal
2011T11BU01698BUILDFinal
2011T11CM03320COMBOFinal
2011T11BU01322TENTSExpired
2011T11EL02527ELECTFinal
2011T11BU01216TENTSFinal
2011T11BU01120TENTSFinal
2011T11CM02615COMBOFinal
2011T11OT01640FLOODPLNFinal
2011T11CM02398COMBOExpired
2011T11EL01899ELECTExpired
2011T11CM01994COMBOFinal
2011T11BU00504TENTSFinal
2011T11BU00421TENTSFinal
2011T11FR00705Code enforcement caseComplete
2011T11BU00362TENTSFinal
2011T11EL00418ELECTFinal
2011T11FR00322Code enforcement caseComplete
2011T11EL00126ELECTFinal
2011T11FR00127FireField
2011T11BU00025BUILDFinal
2010T10FR02395Code enforcement caseField
2010T10CM03116COMBOFinal
2010T10BU01666TENTSFinal
2010T10FR02289Code enforcement caseComplete
2010T10BU01606SPKLRFinal
2010T10BU01585TENTSFinal
2010T10FR02097Code enforcement caseComplete
2010T10EL02344ELECTFinal
2010T10EL02280ELECTFinal
2010T10EL02234ELECTFinal
2010T10BU01466TENTSFinal
2010T10BU01342TENTSExpired
2010T10FR01800Code enforcement caseField
2010T10OT01477FLOODPLNFinal
2010T10CM01642COMBOFinal
2010T10FR00867Code enforcement caseField
2010T10FR00866Code enforcement caseComplete
2010T10BU00623TENTSClosed
2010T10BU00626TENTSClosed
2010T10BU00583TENTSFinal
2010T10CM00917COMBOC of o
2010T10CM00918COMBOClosed
2010T10DV01817Code enforcement caseComplian
2010T10BU00503GRADSWPPFinal
2010T10CM00789COMBOFinal
2010T10CM00802COMBOFinal
2010T10BU00469TENTSClosed
2010T10BU00080TENTSClosed
2009T09EX00706EXCAVClosed
2009T09FR03629FireField
2009T09FR03614FireComplete
2009T09FR03421Code enforcement caseComplete
2009T09BU01535TENTSExpired
2009T09BU01431TENTSFinal
2009T09OT02000SIGNFinal
2009T09FR02732FireComplete
2009T09CM02125COMBOC of o
2009T09FR02605Code enforcement caseComplete
2009T09CM02053COMBOC of o
2009T09CM01971COMBOFinal
2009T09FR02269Code enforcement caseComplete
2009T09FR02267Code enforcement caseComplete
2009T09FR02265Code enforcement caseComplete
2009T09FR02264Code enforcement caseComplete
2009T09CM01702COMBOC of o
2009T09FR01864Code enforcement caseComplete
2009T09FR01860Code enforcement caseComplete
2009T09BU00726BUILDFinal
2009T09BU00705SPKLRFinal
2009T09BU00679TENTSFinal
2009T09CM01136COMBOFinal
2009T09CM01067COMBOFinal
2009T09FR01465FireField
2009T09FR01436Code enforcement caseComplete
2009T09OT00798SIGNFinal
2009T09BU00567TENTSFinal
2009T09BU00502GRADSWPPFinal
2009T09CM00795COMBOExpired
2009T09OT00684FLOODPLNIssued
2009T09CM00637COMBOFinal
2009T09BU00406TENTSFinal
2009T09BU00380SPKLRFinal
2009T09EL00516ELECTFinal
2009T09CM00407COMBOExpired
2009T09OT00371FLOODPLNIssued
2009T09BU00170TANKSExpired
2009T09FR00425Code enforcement caseComplete
2009T09BU00090TENTSFinal
2008T08FR04782Code enforcement caseField
2008T08BU02054DEMOFinal
2008T08EL02176ELECTFinal
2008T08CM03607COMBOClosed
2008T08CM03541COMBOFinal
2008T08BU01937TENTSExpired
2008T08FR03966Code enforcement caseComplete
2008T08FR03965Code enforcement caseComplete
2008T08BU01879TENTSClosed
2008T08CM03393COMBOC of o
2008T08FR03747Code enforcement caseComplete
2008T08BU01717TENTSFinal
2008T08FR03060Code enforcement caseField
2008T08BU01690TENTSClosed
2008T08FR02730Code enforcement caseComplete
2008T08FR02727Code enforcement caseComplete
2008T08FR02725Code enforcement caseComplete
2008T08FR02644Code enforcement caseComplete
2008T08AN00759ADDRNEWIssued
2008T08BU00710TENTSClosed
2008T08BU00588TENTSFinal
2008T08EL00255ELECTFinal
2008T08BU00255TENTSFinal
2008T08BU00067TENTSClosed
2007T07OT02933SIGNFinal
2007T07AN00994ADDRNEWIssued
2007T07BU02204TENTSClosed
2007T07BU02144TENTSClosed
2007T07BU02106TENTSFinal
2007T07BU02107TENTSVoid
2007T07BU02108TENTSVoid
2007T07EL01748ELECTFinal
2007T07BU02006TENTSClosed
2007T07BU01303BUILDFinal
2007T07DV04773Code enforcement caseReferred
2007T07BU00955BUILDFinal
2007T07BU00790TENTSExpired
2007T07CM01252COMBOFinal
2007T07AN00225ADDRNEWIssued
2007T07BU00565TENTSClosed
2007T07BU00374TENTSClosed
2007T07BU00114WALL/FENSi_xpire
2006T06CM06376COMBOExpired
2006T06BU02334TENTSClosed
2006T06CM04652COMBOFinal
2006T06CM02624COMBOExpired
2006T06BU00327TENTSClosed
2005T05CM05426COMBOExpired
2005T05BU02366TENTSClosed
2005T05BU02253TENTSClosed
2005T05FR01293Code enforcement caseComplete
2005T05BU02060TENTSClosed
2005T05CM03854COMBOFinal
2005T05CM02647COMBOFinal
2005T05OT00731PEDDLERExpired
2005T05OT00732PEDDLERExpired
2005T05OT00738PEDDLERExpired
2005T05OT00740PEDDLERExpired
2005T05BU00471TENTSClosed
2005T05CM00545COMBOFinal
2004T04AN01183ADDRNEWIssued
2004T04BU02905BUILDWithdrwn
2004T04CM04818COMBOFinal
2004T04BU02376TENTSClosed
2002T02AN00064ADDRNEWIssued

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 12620001C — 518 permits on file from 2002 to 2026 (79 fireoper, 69 combo, 57 tents, 43 fire operational) and 54 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-22; the permit record is refreshed on a rolling cycle (at least every 45 days), and the assessor’s building file when the county publishes a new roll. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.