Electrical permit history — 4431 E 22nd St
4431 E 22nd St, Tucson — built 2025, with 30 permits on record. Review electrical, HVAC and remodel history with links to official records.
Multifamily property
4431 E 22nd St
Built 2025 — 2020s multifamily stock · 30 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 4431 E 22nd St (aztucsonelectricalsolutions.com/property/126191910/4431-e-22nd-st-tucson-az-85711) · Public records last checked 2026-08-16
- Parcel
- 126191910
- Built
- 2025 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Apartments 25 - 99 Units 3 Or More Story
- Parcel size
- 2.05 acres
- Building area
- 67,386 sq ft (assessor record)
- Sewer
- Connection on file (2024) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 commercial building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 commercial building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentA newer 2025 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “Installation of a new fire alarm system into a 3 story senior housing building.”. Last permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-1124-00973 — all I need is "Fire Service Underground" permit new 3 story wood framed senior living low income housing building.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (2)
| Date | Price | Type |
|---|---|---|
| 2024-01-02 | $735,000 | Warranty Deed |
| 2009-11-20 | $550,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-03-06 (TF-FCP-0326-00148) — VOID - Submit under Permit#TF-FCP-0325-00243 - Need monitoring permit.
Permit history (30)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-03-06 | TF-FCP-0326-00148City permit record | Fire ConstructionVOID - Submit under Permit#TF-FCP-0325-00243 - Need monitoring permit | Void | |
| 2026-02-26finaled | TC-CFO-0226-00041City permit record | Certificate of OccupancyNEW THREE STORY, 72 UNIT LOW INCOME HOUSING TAX CREDIT APARTMENT BUILDING FOR SENIORS. | Complete | |
| 2025-11-03expired 2026-05-19 | TS-PRM-1125-00453City permit record | Fence / wallWALL SIGN - INDIVIDUAL CUT OUT LETTERS | Issued | |
| 2025-09-25finaled | TR-UTL-0925-01674City permit record | Right-of-Way (ROW) - UtilityPRJ300547-1 COX TO OVERLASH 463' FOR SYSTEM TIE. | Complete | |
| 2025-09-09finaled | TR-ROW-0925-01109City permit record | Right-of-Way (ROW)Please submit. Install 2 standard driveways (SD 206) and 35’ of standard sidewalk (SD 200) and ramps*** | Complete | |
| 2025-08-27expired 2026-05-17 | TS-PRM-0825-00360City permit record | Fence / wallBelvedere Terrace wall mounted entry sign | Issued | |
| 2025-05-13finaled | TC-COM-0525-00986City permit record | Commercial BuildingParking Canopy - P1 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | Complete | |
| 2025-05-13finaled | TC-COM-0525-00987City permit record | Commercial BuildingParking Canopy - P2 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | Complete |
Show 22 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-05-13finaled | TC-COM-0525-00988City permit record | Commercial BuildingParking Canopy - P3 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | Complete | |
| 2025-05-13finaled | TC-COM-0525-00989City permit record | Commercial BuildingParking Canopy - P4 - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | Complete | |
| 2025-04-29finaled | TR-ROW-0425-00573City permit record | Right-of-Way (ROW)Jobsite trailer needs to be relocated into utility ROW. Belvedere Terrace Street does not continue past the auto dealership (see attached). We would like to use this location within utility ROW until the end of 2025 when our project concludes. If this location is used, were thinking traffic control wouldn't be required. (07/31/2025)-Renew as of 90 days as of 08/07/2025, new expiration date is 11/05/2025 | Complete | |
| 2025-04-23finaled | TC-COM-0425-00817City permit record | Commercial BuildingRoof Mounted PV System - The NEWPORT BELVEDERE TERRACE 303.81kW Photovoltaic system will consist of 582 Silfab modules [427 530W & 155 500W] and 7 grid-tied inverters. Eighty modules will be roof-mounted, the remainder on 4 new steel parking canopies in existing paved parking areas. | Complete | |
| 2025-03-24expired 2025-10-30 | TF-FCP-0325-00243City permit record | Fire ConstructionInstallation of a new fire alarm system into a 3 story senior housing building. | Inspections | |
| 2025-02-18 | TR-UTL-0225-00300City permit record | Right-of-Way (ROW) - UtilityPrevious permit TR-UTL-1224-02341. Primary underground electric being installed in ROW. | Withdrawn | |
| 2024-12-11finaled | TR-UTL-1224-02341City permit record | Right-of-Way (ROW) - UtilityUtility (sewer) work to be performed in ROW. 01/15/2025 - Renewed for 60 days from 01/18/2025 to 03/18/2025. | Complete | |
| 2024-12-02 | TZ-CMP-1224-00174City permit record | Zoning Verification LetterAfter hours permit or Permit: TC-COM-1223-02914 | Void | |
| 2024-11-18finaled | TF-FCP-1124-00973City permit record | Fire Constructionall I need is "Fire Service Underground" permit new 3 story wood framed senior living low income housing building. | Complete | |
| 2024-11-04finaled | TF-FCP-1124-00923City permit record | Fire ConstructionInstall a new wet sprinkler system to meet nfpa 13 city codes and regulations. | Complete | |
| 2024-09-23 | TC-FBB-0924-00168City permit record | Factory Built Buildings200 amp temporary electric panel | Expired | |
| 2024-09-20 | TC-RES-0924-05467City permit record | Addition / alteration**VOID: YL - Unable to process, according to the location/parcel history there appears to be submittals for a purposed New multi-family development. Multi-family submittals must be submitted as commercial permit types. Permits already exist for this location TD-DEV-1223-00480 & TC-COM-1223-02914. In addition, according to your aerial photograph this is a vacant lot. An electrical clearance to a property without a permitted permanent structure is not permittable. If you're trying to hook up temporary power to a temporary construction trailer you will need to apply for a Temporary Structures permit. This permit will be voided. For questions: Building_Official@tucsonaz.gov ** -temporary power clearance 200 amp | Void | |
| 2023-12-22finaled | TC-COM-1223-02914City permit record | Commercial BuildingNEW THREE STORY, 72 UNIT LOW INCOME HOUSING TAX CREDIT APARTMENT BUILDING FOR SENIORS. | Complete | |
| 2023-12-08finaled | TD-DEV-1223-00480City permit record | Fence / wallRevision 3 started 08.05.2025 - wall** Revision 2 - *Revision #1 (Setbacks) started 4/29/24* New 3-story multi-family apartment building | Complete | |
| 2021-06-18expired 2022-02-28 | T21CM05118City permit record | Commercial BuildingUpgrade equipment at existing T-Mobile Cell-Site | Expired | |
| 2018-08-31finaled | T18CM06874City permit record | COMBONEW TMOBILE CELL TOWER | Final | |
| 2018-07-13expired 2019-07-13 | T18OT00755City permit record | PEDDLERREGULATED PEDDLER: THE DOG OUT, SITE PLAN APPROVED, PC LIC #3180561 EXP DATE 7/2019 | Expired | |
| 2010-10-06 | T10EL02292City permit record | ELECTNEW ELECTRIC SERVICE 100AMPS | Withdrwn | |
| 2010-08-11 | T10OT01718City permit record | PEDDLERRegulated Peddler | Expired | |
| 2008-12-18finaled | T08BU02171City permit record | TENTSTENT | Final | |
| 2007-04-19 | T07BU00858City permit record | GRADINGGRADING: | Withdrwn | |
| 2006-07-12 | T06BU01757City permit record | GRADINGGRADING: CUT: 89 FILL: 9 | Withdrwn |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (6)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2024-05-30 | CE-VIO0524-02079Code enforcement case | Code enforcement case | Closed - resolved |
| 2022-02-16 | T22DV01217Code enforcement case | Refuse | Noverify |
| 2020-02-27 | T20DV01495Code enforcement case | Refuse | Complian |
| 2012-07-02 | T12DV05569Code enforcement case | Fire | Complian |
| 2011-05-12 | T11DV03470Code enforcement case | Refuse | Noverify |
| 2005-06-10 | T05ZV00316Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 126191910 — 30 permits on file from 2006 to 2026 (7 commercial building, 4 fire construction, 3 fence / wall, 3 right-of-way (row) - utility) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).