Electrical permit history — 4414 E 2nd St

4414 E 2nd St, Tucson — built 1997, with 10 permits on record. Review electrical, HVAC and remodel history with links to official records.

Multifamily property

4414 E 2nd St

Built 1997 — 1990s multifamily stock · 1 open code case · 10 permits on record; no permitted panel/service or HVAC work among them

Parcel
12604012F
Built
1997 (county record)
Jurisdiction
Tucson
Zoning
R-2
Assessor use
Apartments 25 - 99 Units 2 Story
Parcel size
5.18 acres
Sewer
Connection on file (1952) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 4414 E 2nd St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2017 combo permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2017 combo permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLikely dueA newer 2026 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “REPLACEMENT OF AN EXISTING FIRE ALARM SYSTEM”. Last permitted 2005 (21 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T05BU00087 — FIRE SPKR:ADD 11
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth looking at

    There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2026-05-29 (TF-FCP-0526-00365) — REPLACEMENT OF AN EXISTING FIRE ALARM SYSTEM.

Permit history (10)

Permit history for this parcel — 8 of 10 records
DateRecordWhatStatusValue
2026-05-29expires 2026-11-24TF-FCP-0526-00365City permit recordFire ConstructionREPLACEMENT OF AN EXISTING FIRE ALARM SYSTEMIssued
2019-03-12finaledDP19-0061City permit recordDevelopment PackageSITE - Bnai Brith Covenant House, storage building, 420sf detached.Complete
2019-02-04T19BU00051City permit recordBUILDSTORAGE SHEDVoid
2019-02-04expired 2020-01-04T19CM00820City permit recordCOMBOSTORAGE SHEDExpired
2017-06-14finaledT17RW02575City permit recordROWFRONT OF ADDRESS IN ASPHALT PERMANENT PATCHFinal
2017-05-24finaledT17CM04133City permit recordCOMBO(T17DV01996) WATER DAMAGEFinal
2017-05-15finaledT17RW02057City permit recordROW17R1449 IN FRONT OF ADDRESS IN ASPHALT. VISABLE LEAK 17R1449 RENEW 2" HDPE LINE. *** EMERGENCY ***Final
2008-02-19finaledT08CM00550City permit recordCOMBOINSTALL POLE LIGHTFinal
Show 2 older records
Permit history for this parcel — remaining 2 records
DateRecordWhatStatusValue
2006-11-02expired 2007-05-27T06PL01992City permit recordPLUMBREPLACE: MAIN WATER LINEExpired
2005-01-12finaledT05BU00087City permit recordSPKLRFIRE SPKR:ADD 11Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (11)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 11 records
DateRecordWhatStatus
2026-03-07CE-VIO0326-01112Code enforcement caseFireActive
2019-05-20T19DV04139Code enforcement caseCode enforcement caseComplian
2017-05-14T17DV01996Code enforcement caseCode enforcement caseComplian
2015-08-21T15DV06144Code enforcement caseRefuseNoverify
2011-04-21finaledT11FR00880Code enforcement caseCode enforcement caseComplete
2010-10-04finaledT10FR02033Code enforcement caseCode enforcement caseComplete
2008-11-21finaledT08FR04401Code enforcement caseCode enforcement caseComplete
2008-07-15T08DV05906Code enforcement caseCode enforcement caseComplian
Show 3 older records
Code enforcement history for this parcel — remaining 3 records
DateRecordWhatStatus
2007-12-24T07DV13281Code enforcement caseCode enforcement caseComplian
2006-11-27T06DV02292Code enforcement caseCode enforcement caseComplian
2005-06-28T05FR00990Code enforcement caseFireField

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12604012F — 10 permits on file from 2005 to 2026 (3 combo, 2 row, 1 fire construction, 1 development package) and 11 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.