Electrical permit history — 1095 E 18th St
1095 E 18th St, Tucson — built 1979, with 11 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1095 E 18th St
Built 1979 — 1970s commercial stock · last permitted panel/service work 2016 (finaled)
Permanent link: Electrical permit history for 1095 E 18th St (aztucsonelectricalsolutions.com/property/12417198c/1095-e-18th-st-tucson-az-85719) · Public records last checked 2026-08-16
- Parcel
- 12417198C
- Built
- 1979 (county record)
- Jurisdiction
- Tucson
- Zoning
- I-1
- Assessor use
- Warehousing
- Parcel size
- 0.89 acres
- Building area
- 6,120 sq ft (assessor record)
- Sewer
- Connection on file (2019) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2016 permit was finalized; the permit description states “NEW ELECTRIC SERVICE”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2016 (10 years ago). City inspection record: ELECTRIC - FINAL approved 2016-03-09. Contractor of record: RIO WEST DEVELOPMENT AND CONSTR *C*. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T16CM01046 — NEW ELECTRIC SERVICE
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2016 (10 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T16BU00760 — FIRE ALARM
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2025-01-24 (TC-COM-0125-00161) — 18th St Warehouse Electrical Upgrade.
Permit history (11)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-01-24expired 2026-02-03 | TC-COM-0125-00161City permit record | Commercial Building18th St Warehouse Electrical Upgrade | Inspections | |
| 2023-02-15finaled | TF-FCP-0223-00395City permit record | Fire ConstructionAdd a TG7 cell radio dialer | Complete | |
| 2016-05-12 | T16BU00759City permit record | SPKLRFIRE ALARM | Withdrwn | |
| 2016-05-12finaled | T16BU00760City permit record | BUILDFIRE ALARM | Final | |
| 2016-04-27finaled | T16EX01519City permit record | EXCAVTricon Contracting will be installing a 6" inch fire protection service for water with 13 sq yds of asphalt and 16 sq ft of sidewalk | Final | |
| 2016-04-27finaled | T16TC01044City permit record | BARRICADTricon Contracting will be installing a 6" inch fire protection service for water with 13 sq yds of asphalt and 16 sq ft of sidewalk | Final | |
| 2016-04-19expired 2016-10-30 | T16CM02825City permit record | COMBOTI; STORAGE RACKS | Expired | |
| 2016-04-11finaled | T16BU00515City permit record | SPKLRSPRINKLER SYSTEM; COMM | Final |
Show 3 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2016-04-05finaled | T16BU00479City permit record | SPKLRFIRE SPRKL | Final | |
| 2016-03-24finaled | T16CM02221City permit record | COMBOWAREHOUSE | C of o | |
| 2016-02-12finaled | T16CM01046City permit record | COMBONEW ELECTRIC SERVICE | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (1)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-03-19 | CE-VIO0325-01149Code enforcement case | Work without permit | Closed - resolved |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 12417198C — 11 permits on file from 2016 to 2025 (3 spklr, 3 combo, 1 commercial building, 1 fire construction) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
