Electrical permit history — 15 N Santa Rita Av
15 N Santa Rita Av, Tucson — built 1936, with 9 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
15 N Santa Rita Av
Built 1936 — 1930s commercial stock · last permitted panel/service work 2023 (permitted, completion not confirmed)
Permanent link: Electrical permit history for 15 N Santa Rita Av (aztucsonelectricalsolutions.com/property/124062210/15-n-santa-rita-av-tucson-az-85719) · Public records last checked 2026-08-16
- Parcel
- 124062210
- Built
- 1936 (county record)
- Jurisdiction
- Tucson
- Zoning
- R-2
- Assessor use
- Bar Or Tavern
- Parcel size
- 0.17 acres
- Building area
- 1,509 sq ft (assessor record)
- Sewer
- Connection on file (2024) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Rincon Heights Historic District — National Register district — Contributing (City of Tucson)
- Service on record
- A 2023 permit was issued; completion is not confirmed in the available record; the permit description states “Electrical service upgrade, tie into existing circuits, install ground rod/ #2 ground/ #4 water bond, install 20a weatherproof outlet below new service” — an increase in capacity as described, not a confirmed installed rating.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionPermitted — completion not confirmedA 2023 permit specifies this work (the permit description states “Electrical service upgrade, tie into existing circuits, install ground rod/ #2 ground/ #4 water bond, install 20a weatherproof outlet below new service”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. City inspection record: last recorded inspection 2024-03-27; no approved final is shown. TC-RES-1023-08918 — Electrical service upgrade, tie into existing circuits, install ground rod/ #2 ground/ #4 water bond, install 20a weatherproof outlet below new service
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.
Recorded sales (2)
| Date | Price | Type |
|---|---|---|
| 2023-07-21 | $300,000 | Warranty Deed |
| 2023-06-14 | $300,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2025-05-05 (TC-CFO-0525-00054) — Convert existing structure to Wine Bar Cafe, new attached shade structure.
Permit history (9)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-05-05finaled | TC-CFO-0525-00054City permit record | Certificate of OccupancyConvert existing structure to Wine Bar Cafe, new attached shade structure | Complete | |
| 2025-02-26expired 2025-09-03 | TS-PRM-0225-00075City permit record | Fence / wall(1) New painted wall sign | Issued | |
| 2025-01-23 | TS-PRM-0125-00030City permit record | Sign - PermanentIs a Wine Bar + signs allowed in R-2? | Expired | |
| 2024-11-01finaled | TR-UTL-1124-02093City permit record | Right-of-Way (ROW) - UtilityPRJ280365-1: Cox to overlash 1500' to existing aerial strand and trench 1' and bore 20' to install CATV conduit for system tie. | Complete | |
| 2024-10-18 | TR-UTL-1024-02016City permit record | Right-of-Way (ROW) - UtilityPRJ280365-1: Cox to overlash 541' to existing aerial strand, trench 2' and bore 21' to install CATV conduit for system tie. Permit update 10/22/2024: Scope of work has changed. We will be submitting as new when revisions have been made. Request to withdrawn. | Withdrawn | |
| 2024-04-19finaled | TC-COM-0424-00709City permit record | Commercial BuildingConvert existing structure to Wine Bar Cafe, new attached shade structure | Complete | |
| 2024-01-17finaled 2024-03-21 | SD-0124-00009Design review | Urban Overlay District (UOD)SMD Submittal to Convert existing structure to Wine Bar Cafe | Complete | |
| 2023-11-22finaled | TD-DEV-1123-00466City permit record | Development PackageRevision 1 - Convert existing structure to Wine Bar Cafe | Complete |
Show 1 older record
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2023-10-19expired 2024-09-23 | TC-RES-1023-08918City permit record | Residential Building - One or Two FamilyElectrical service upgrade, tie into existing circuits, install ground rod/ #2 ground/ #4 water bond, install 20a weatherproof outlet below new service | Issued |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 124062210 — 9 permits on file from 2023 to 2025 (2 right-of-way (row) - utility, 1 certificate of occupancy, 1 fence / wall, 1 sign - permanent) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.