Electrical permit history — 715 E Lee St

715 E Lee St, Tucson — built 1972, with 68 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

715 E Lee St

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1972 — 1970s multifamily stock · HVAC 2024 (finaled); a newer 2025 permit is issued

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Nothing permitted on the service or distribution shows in the record we read, which for a building of this era leaves the original switchgear generation in play. Obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown — worth establishing what is actually installed before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalFinaled permit foundA newer 2025 permit for the same system is recorded as “Inspections” — The work was permitted, but final completion is not confirmed. The permit description states “SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT G”. Last permitted 2024 (2 years ago). City inspection record: COT - LCBU - Building Final approved 2025-07-02. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-COM-1024-02011 — THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Solar and energy potential

Roof footprint
≈ 19,988 sq ft (county building-footprint layer, 2 structures)
Usable for solar, planning estimate
≈ 14,000 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 155 kW — roughly 390 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 250,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$20,000–$33,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 2 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
12315031B
Year constructed
1972 (county record)
Permitting authority
Tucson
Zoning
R-3
Property type
Apartments 25 - 99 Units 1 Story
Sewer
Connection on file (1971, 2024) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 68 building permits for this parcel dated between 2018 and 2025. By category the work is commercial building (61), trade permit (4) and residential building - one or two family (2). 15 of them carry a final inspection; the other 53 were issued, expired or are still open, which is not the same as work completed. There are 2 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 12315031B. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85719 · Commercial & industrial reports · Homes in 85719 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

Complete permit record (70 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2025TC-COM-0725-01426Commercial BuildingInspections
2025TC-COM-0625-01235Commercial BuildingIssued
2025TC-COM-0625-01237Commercial BuildingIssued
2025TC-COM-0625-01238Commercial BuildingIssued
2025TC-COM-0625-01239Commercial BuildingIssued
2025TC-COM-0625-01240Commercial BuildingVoid
2025TC-COM-0625-01241Commercial BuildingIssued
2025TC-COM-0625-01242Commercial BuildingIssued
2025TC-COM-0625-01243Commercial BuildingIssued
2025TC-COM-0625-01244Commercial BuildingIssued
2025TC-COM-0625-01245Commercial BuildingIssued
2025TC-COM-0625-01246Commercial BuildingIssued
2025TC-COM-0625-01247Commercial BuildingIssued
2025TC-COM-0625-01249Commercial BuildingIssued
2025TC-COM-0625-01250Commercial BuildingIssued
2025TC-COM-0625-01251Commercial BuildingIssued
2025TC-COM-0625-01252Commercial BuildingIssued
2025TC-COM-0625-01253Commercial BuildingIssued
2025TC-COM-0625-01254Commercial BuildingIssued
2025TC-COM-0625-01255Commercial BuildingIssued
2025TC-COM-0625-01256Commercial BuildingIssued
2025TC-COM-0625-01257Commercial BuildingIssued
2025TC-COM-0625-01258Commercial BuildingIssued
2025TC-COM-0625-01259Commercial BuildingIssued
2025TC-COM-0625-01260Commercial BuildingIssued
2025TC-RES-0625-03215Residential Building - One or Two FamilyVoid
2025TC-RES-0625-03216Residential Building - One or Two FamilyVoid
2025TC-RES-0625-03217Residential Building - One or Two FamilyVoid
2025TC-RES-0625-03219Residential Building - One or Two FamilyVoid
2025TC-COM-0525-00899Commercial BuildingInspections
2025TC-COM-0525-00900Commercial BuildingInspections
2025TC-COM-0425-00826Commercial BuildingWithdrawn
2025TC-COM-0425-00827Commercial BuildingWithdrawn
2025TC-COM-0125-00128Commercial BuildingInspections
2024TC-COM-1224-02390Commercial BuildingComplete
2024TC-COM-1224-02391Commercial BuildingComplete
2024TC-COM-1224-02376Commercial BuildingVoid
2024TC-COM-1224-02377Commercial BuildingVoid
2024TC-COM-1124-02156Commercial BuildingComplete
2024TC-COM-1124-02157Commercial BuildingComplete
2024TC-RES-1124-06513Residential Building - One or Two FamilyVoid
2024TC-RES-1124-06514Residential Building - One or Two FamilyVoid
2024TC-COM-1024-02011Commercial BuildingInspections complete
2024TC-COM-1024-02012Commercial BuildingWithdrawn
2024TC-COM-1024-02013Commercial BuildingInspections complete
2024TC-COM-1024-02014Commercial BuildingInspections
2024TC-COM-1024-02015Commercial BuildingInspections complete
2024TC-COM-1024-02016Commercial BuildingInspections
2024TC-COM-1024-02018Commercial BuildingInspections complete
2024TC-COM-1024-02019Commercial BuildingInspections complete
2024TC-COM-1024-02020Commercial BuildingInspections complete
2024TC-COM-1024-02021Commercial BuildingInspections
2024TC-COM-1024-02022Commercial BuildingInspections complete
2024TC-COM-1024-02023Commercial BuildingInspections
2024TC-COM-1024-02024Commercial BuildingInspections complete
2024TC-COM-1024-02025Commercial BuildingInspections complete
2024TC-COM-1024-02026Commercial BuildingInspections complete
2024TC-COM-0424-00631Commercial BuildingIssued
2023TC-COM-1023-02362Commercial BuildingIssued
2023TC-COM-1023-02363Commercial BuildingIssued
2023TC-COM-1023-02364Commercial BuildingIssued
2023TC-COM-1023-02365Commercial BuildingIssued
2023TC-COM-1023-02366Commercial BuildingWithdrawn
2023TC-COM-1023-02367Commercial BuildingIssued
2022TC-COM-1122-00128Commercial BuildingIssued
2022TC-COM-1122-00129Commercial BuildingIssued
2020T20CM01526Commercial BuildingExpired
2018T18CM00637COMBOFinal
2008T08DV11541Code enforcement caseComplian
2006T06DV02269RefuseNoverify

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 12315031B — 68 permits on file from 2018 to 2025 (61 commercial building, 4 trade permit, 2 residential building - one or two family, 1 combo) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-22; the permit record is refreshed on a rolling cycle (at least every 45 days), and the assessor’s building file when the county publishes a new roll. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.