Electrical permit history — 2145 N Country Club Rd
2145 N Country Club Rd
- Electrical service: no service or distribution permit on record. A 1945 building likely still has its original switchgear.
- Watch for: built 1945; distribution gear this age is often past manufacturer support.
- Other work on record: trade permit 2024 (permit not closed), trade permit 2020.
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Possibly: no service or distribution work is on record for this 1945 building.
- Electrical service & distributionWorth checkingNo service or distribution permit on record. A 1945 building likely still has its original switchgear. Obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown — worth establishing what is actually installed before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalWorth checkingNo permit on record names this system. The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyWorth checkingNo permit on record names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofWorth checkingNo permit on record names this system. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown.
- Worth confirming
Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear.
- Routine
A trade permit was pulled in 2020. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 3,891 sq ft (county building-footprint layer; 1 neighbouring structure crossing the lot line excluded)
- Usable for solar, planning estimate
- ≈ 2,700 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 30 kW — roughly 80 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 49,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- Estimate $4,000–$6,500 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 1.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 123021540 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 123021540
- Year constructed
- 1945 (assessor record)
- Permitting authority
- Tucson
- Zoning
- C-1
- Property type
- Apartments 5 - 24 Units 1 Story
- Building area
- 2,820 sq ft
- Cooling
- WARMED AND COOLED AIR
- Heating
- Forced Air
- Electrical service
- No service or distribution permit on record. A 1945 building likely still has its original switchgear. (the era estimate is from the year built, 1945 — not a measurement)
Building area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2024. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 3 building permits for this parcel dated between 2020 and 2026. Three trade permits. 1 of them carries a final inspection; the other 2 were issued, expired or are still open, which is not the same as work completed. There are 2 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Street and utility work at this address. The City’s file also shows one right-of-way or utility permit here (2024) — work in the street or on a utility’s lines, not on the building, so it is left out of the counts above.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Commercial building (1): 2026 TC-COM-1126-01857
Code enforcement cases (2): 2025 CE-VIO0725-02867 · 2025 CE-VIO0425-01557
Residential building (1): 2024 TC-RES-0824-04985
City permit record (1): 2020 T20CM01110
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 123021540.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All multifamily property · Commercial property in 85716 · Commercial & industrial reports · Homes in 85716 · Permit data by neighborhood
Planning multifamily electrical or metering work here?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 2145 N Country Club Rd (aztucsonelectricalsolutions.com/property/123021540/2145-n-country-club-rd-tucson-az-85716)
Electrical summary — 2145 N Country Club Rd, Tucson, AZ 85716
Parcel 123021540Year built 1945Building area 2,820 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: no service or distribution permit on record. A 1945 building likely still has its original switchgear.
- Watch for: built 1945; distribution gear this age is often past manufacturer support.
- Other work on record: trade permit 2024 (permit not closed), trade permit 2020.
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Nov 2026 | TC-COM-1126-01857 | Trade permit | Open |
| Sep 2024 | TC-RES-0824-04985 | Trade permit | Open |
| Feb 2020 | T20CM01110 | Trade permit | Final |
Street and utility work at this address: 1 (work in the street, not on the building; not listed).
Era flags
- Built 1945: distribution gear this age is often past manufacturer support.
Ask your inspector or engineer to check
- The main switchboard’s nameplate rating and the age and make of the distribution gear.
- Whether the arc-flash labels match the installed gear (NFPA 70E reviews them every five years).
Live report: https://www.aztucsonelectricalsolutions.com/property/123021540/2145-n-country-club-rd-tucson-az-85716
How this property compares nearby
Properties on N COUNTRY CLUB RD hold 2,062 City permits on record, 667 of them since 2022.
Counts and years from the same public records.
How this report was built
This is a reading of public records for parcel 123021540 — 3 City permits on file from 2020 to 2026 and 1 street or utility permit and 2 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof and walls on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
Permit history: City of Tucson addresses, back to the mid-1990s. Elsewhere in Pima County: property facts from the Assessor, no permit history yet.