Electrical permit history — 3830 E Bellevue St

3830 E Bellevue St, Tucson — built 1973, with 19 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3830 E Bellevue St

Built 1973 — 1970s commercial stock · 1 open code case · 19 permits on record; no permitted panel/service or HVAC work among them

Parcel
12218266A
Built
1973 (county record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Privately Owned Academic School - Children
Parcel size
0.68 acres
Building area
7,163 sq ft (assessor record)
Sewer
Connection on file (1973, 2022) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 3830 E Bellevue St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-1225-01030 — Tie-in of new devices to existing fire alarm system
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth looking at

    There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (2)

Recorded transfers from the Pima County Assessor — 2 of 2
DatePriceType
2020-08-14$908,500Warranty Deed
1998-10-26$682,500Special Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2025-12-12 (TF-FCP-1225-01030) — Tie-in of new devices to existing fire alarm system.

Permit history (19)

Permit history for this parcel — 8 of 19 records
DateRecordWhatStatusValue
2025-12-12finaledTF-FCP-1225-01030City permit recordFire ConstructionTie-in of new devices to existing fire alarm systemInspections complete
2025-09-24finaledTF-FCP-0925-00816City permit recordAddition / alterationAddition existing systemComplete
2025-09-04TC-COM-0925-01631City permit recordCommercial BuildingREMODEL EXISTING RESTROOMS TO CURRENT ACCESSIBILITY STANDARDS, NEW CEILING GRID, LIGHTS, & MECH REGISTERSWithdrawn
2025-08-29finaledTC-COM-0825-01603City permit recordCommercial BuildingINTERIOR NON-BEARING PARTITIONS, REMODEL EXT'G RESTROOMS TO CURRENT ACCESSIBILITY STANDARDS, REPLACE CEILING GRID, LIGHTS, & MECH REGISTERSInspections complete
2024-11-27finaledTF-FOP-1124-01400City permit recordFire OperationalRenewing the permit for childcare facilityComplete
2023-11-01finaledTF-FOP-1123-01721City permit recordFire OperationalLamplighter Chabad Day School I-4 daycare 36 children Lamplighter Chabad Day SchoolComplete
2023-11-01finaledTF-FOP-1123-01723City permit recordFire OperationalE Occupancy with 2 classroomsComplete
2022-07-29expired 2023-08-06T22CM05788City permit recordCommercial BuildingInstall new 150' gas line from gas meter to (2) new gas lantern locations in front of buildingIssued
Show 11 older records
Permit history for this parcel — remaining 11 records
DateRecordWhatStatusValue
2022-07-07finaledT22RW02431City permit recordRight-of-Way (ROW)Excavate approximately 2'x42' trench to replace gas service to 3830 E BELLEVUE ST. 5'x5' bell hole o; Work Order: 4481080Complete
2022-04-14finaledT22FC00278City permit recordFire ConstructionFire Alarm & Detection Systems - NEW VOICE EVAC FIRE ALARM SYSTEM INSTALLATION.; Fire Alarm Systems - New Sq Ft: 3920; Fire Alarm Systems - # New Stories: 1Complete
2022-03-30finaledT22RW01192City permit recordRight-of-Way (ROW)Fire Hydrant/Fire Service #171701Installing 1-4" fire protection service, 1-1" water service witComplete
2022-03-17finaledT22FC00208City permit recordFIRECONSNew fire sprinkler system and 80' of 4" underground piping.Final
2022-02-01expires 2026-10-19DP22-0013City permit recordFence / wallSite - Lamplighter Chabad Day School. New classrooms in existing building, wall.In review
2021-11-12finaledT21CM08855City permit recordCommercial BuildingINTERIOR PARTITIONS, NEW EXTERIOR DOORS, NEW CEILING, LIGHTING, MECHANICAL DISTRIBUTION, NEW ACCESSComplete
2018-03-23finaledT18FO00255City permit recordFIREOPERCounseling CenterFinal
2008-05-14T08CM01560City permit recordCOMBOTI:FAMILY SERVICES & ADDITONWithdrwn
2008-02-28DS08-07City permit recordZoning Verification Letter3830 E BELLEVUE - 3830 E BELLEVUE - DS 2-08.4.1BApproved
2004-09-15T04BU02274City permit recordAddition / alterationADDITION:CARPORTWithdrwn
2003-06-30finaledT03CM03176City permit recordFence / wallSITE WORK:PAVING & FENCE:80LF OF 8' HIGHFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2025-01-13CE-VIO0125-00182Code enforcement caseCode enforcement caseActive

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12218266A — 19 permits on file from 2003 to 2025 (4 commercial building, 3 fire operational, 2 fire construction, 2 addition / alteration) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.