Electrical permit history — 4424 E Bellevue St
4424 E Bellevue St, Tucson — built 1978, with 19 permits on record. Review electrical, HVAC and remodel history with links to official records.
Multifamily property
4424 E Bellevue St
Built 1978 — 1970s multifamily stock · last permitted panel/service work 2025 (permitted, completion not confirmed) · HVAC 2005 (finaled)
Permanent link: Electrical permit history for 4424 E Bellevue St (aztucsonelectricalsolutions.com/property/122120340/4424-e-bellevue-st-tucson-az-85712) · Public records last checked 2026-08-17
- Parcel
- 122120340
- Built
- 1978 (county record)
- Jurisdiction
- Tucson
- Zoning
- R-3
- Assessor use
- Apartments 5 - 24 Units 2 Story
- Parcel size
- 0.67 acres
- Building area
- 15,428 sq ft (assessor record)
- Sewer
- Connection on file (1977, 2024) (county sewer connection records)
- Flood zone
- X (shaded) — 0.2% annual-chance flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- A 2025 permit was issued; completion is not confirmed in the available record; the permit description states “Replacement of existing deteriorated multi-meter service equipment with new Eaton 1MTB800RC main terminal box and three Eaton 1MM312RC meter stacks (total 9 meters: 8 units + 1 house/service). Work includes removal of old gear, installation of new 800A service equipment, grounding, labeling, and compliance with NEC and TEP SR-452 requirements. No increase in load or change in occupancy.”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionPermitted — completion not confirmedA 2025 permit specifies this work (the permit description states “Replacement of existing deteriorated multi-meter service equipment with new Eaton 1MTB800RC main terminal box and three Eaton 1MM312RC meter stacks (total 9 meters: 8 units + 1 house/service). Work includes removal of old gear, installation of new 800A service equipment, grounding, labeling, and compliance with NEC and TEP SR-452 requirements. No increase in load or change in occupancy.”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Inspections. City inspection record: COT - LCEL - Electrical Final approved 2026-01-15. TC-COM-1025-01997 — Replacement of existing deteriorated multi-meter service equipment with new Eaton 1MTB800RC main terminal box and three Eaton 1MM312RC meter stacks (total 9 meters: 8 units + 1 house/service). Work includes removal of old gear, installation of new 800A service equipment, grounding, labeling, and compliance with NEC and TEP SR-452 requirements. No increase in load or change in occupancy.
- Heating, cooling & mechanicalLikely dueLast permitted 2005 (21 years ago). City inspection record: MECHANICAL - FINAL approved 2005-09-30. Contractor of record: JOHNSON AIRE INC ,. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T05ME00681 — REPLACE: 2 TON GAS PK
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
There is an electrical reconnect permit from 2012. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2024-03-29 | $1,850,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2025-10-30 (TC-COM-1025-01997) — Replacement of existing deteriorated multi-meter service equipment with new Eaton 1MTB800RC main terminal box and three Eaton 1MM312RC meter stacks (total 9 meters: 8 units + 1 house/service). Work includes removal of old gear, installation of new 800A service equipment, grounding, labeling, and compliance with NEC and TEP SR-452 requirements. No increase in load or change in occupancy..
Permit history (19)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-10-30expired 2026-07-14 | TC-COM-1025-01997City permit record | Commercial BuildingReplacement of existing deteriorated multi-meter service equipment with new Eaton 1MTB800RC main terminal box and three Eaton 1MM312RC meter stacks (total 9 meters: 8 units + 1 house/service). Work includes removal of old gear, installation of new 800A service equipment, grounding, labeling, and compliance with NEC and TEP SR-452 requirements. No increase in load or change in occupancy. | Inspections | |
| 2025-10-28expired 2026-07-13 | TC-COM-1025-01980City permit record | Commercial BuildingReplacement of existing deteriorated multi-meter service equipment with new Eaton 1MTB800RC main terminal box and three Eaton 1MM312RC meter stacks (total 9 meters: 8 units + 1 house/service). Work includes removal of old gear, installation of new 800A service equipment, grounding, labeling, and compliance with NEC and TEP SR-452 requirements. No increase in load or change in occupancy. | Inspections | |
| 2025-06-30finaled | TC-COM-0625-01286City permit record | Commercial BuildingComplete Replacement of 6 multi-Position meter center. Like-for-like replacement. | Complete | |
| 2024-09-17 | TE-FPU-0924-00289City permit record | Floodplain UseBuilding C/Units 105, 106, 107, 205, 206, and 207 - 4424 E Bellevue St, Bonne Vie @ Midtown. Apartment tenant refurbish such as new flooring, new cabinets, and new water heaters. | Issued | |
| 2024-09-17 | TE-FPU-0924-00290City permit record | Floodplain UseBuilding B/Units 108, 109, 110, 111, 208, 209, 210, and 211 - 4424 E Bellevue St. Bonne Vie @ Midtown. Apartment tenant refurbish such as new flooring, new cabinets, and new water heaters. | Issued | |
| 2024-09-17 | TE-FPU-0924-00291City permit record | Floodplain UseBuilding A/Units 101, 102, 103, 104, 201, 202, 203, and 204 - 4424 E Bellevue St. Bonne Vie @ Midtown. Apartment tenant refurbish such as new flooring, new cabinets, and new water heaters. | Issued | |
| 2024-07-22expired 2026-02-09 | TC-COM-0724-01406City permit record | Commercial BuildingBuilding B/Units 108, 109, 110, 111, 208, 209, 210 & 211 - 4424 E Bellevue St, Bonne Vie @ Midtown Apt Tenant Refurbish | Inspections | |
| 2024-07-22expired 2025-06-08 | TC-COM-0724-01407City permit record | Commercial BuildingBuilding C/Units 105, 106, 107, 205, 206 & 207 - 4424 E Bellevue St, Bonne Vie @ Midtown Apt Tenant Refurbish | Inspections |
Show 11 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2024-07-20expired 2025-10-15 | TC-COM-0724-01390City permit record | Commercial BuildingBuilding A/Units 101, 102, 103, 104, 201, 202, 203 & 204 - 4424 E Bellevue St, Bonne Vie @ Midtown Apt Tenant Refurbish | Inspections | |
| 2024-06-03expired 2024-11-30 | TC-COM-0624-01064City permit record | Commercial BuildingNew asphalt parking lot | Expired | |
| 2013-08-13finaled | T13CM04981City permit record | COMBOELECTRIC RECONNECT | Final | |
| 2012-08-29finaled | T12CM05397City permit record | COMBORECONNECT: ELECTRIC | Final | |
| 2011-01-25finaled | T11EL00217City permit record | ELECTRECONNECT ELECTRIC; APT # 204 | Final | |
| 2009-06-02expired 2009-12-09 | T09EL01381City permit record | ELECTRECONNECT:ELECTRIC:APT | Expired | |
| 2005-09-06finaled | T05ME00681City permit record | MECHREPLACE: 2 TON GAS PK | Final | |
| 2005-09-06finaled | T05ME00682City permit record | MECHREPLACE: 2 TON GAS PK | Final | |
| 2005-09-06finaled | T05ME00683City permit record | MECHREPLACE: 2 TON GAS PK | Final | |
| 2004-02-19finaled | T04EL00348City permit record | ELECTELECTRIC:RECONNECT | Final | |
| 2002-01-22expired 2002-07-21 | T02BU00184City permit record | Pool / spaFILLING IN SWIMMING POOL | Expired |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (15)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-07-21 | CE-VIO0725-03090Code enforcement case | Code enforcement case | Closed - unfounded |
| 2023-05-17 | CE-VIO0523-03609Code enforcement case | Code enforcement case | Closed - unfounded |
| 2023-02-09 | CE-VIO0223-01819Code enforcement case | Refuse | Closed - resolved |
| 2021-09-30 | T21DV06878Code enforcement case | Vegetation | Void |
| 2021-08-26 | T21DV05851Code enforcement case | Refuse | Closed - resolved |
| 2021-06-11 | T21DV03559Code enforcement case | Refuse | Complian |
| 2021-04-30 | T21DV02550Code enforcement case | Refuse | Complian |
| 2019-09-23 | T19DV07416Code enforcement case | Vegetation | Referred |
Show 7 older records
| Date | Record | What | Status |
|---|---|---|---|
| 2019-09-04 | T19DV06976Code enforcement case | Vegetation | Referred |
| 2019-05-29 | T19DV04325Code enforcement case | Refuse | Complian |
| 2011-01-27 | T11DV00547Code enforcement case | Refuse | Complian |
| 2010-05-26 | T10DV03448Code enforcement case | Vegetation | Noverify |
| 2007-01-03finaled | T07FR00017Code enforcement case | Code enforcement case | Complete |
| 2006-12-29 | T06DV03323Code enforcement case | Code enforcement case | Invalid |
| 2006-12-15 | T06DV03077Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 122120340 — 19 permits on file from 2002 to 2025 (7 commercial building, 3 floodplain use, 3 elect, 3 mech) and 15 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
