Electrical permit history — 3933 E Pima St

3933 E Pima St, Tucson — built 1981, with 150 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3933 E Pima St

Built 1981 — 1980s commercial stock · HVAC 2019 (finaled) · 1 open code case

Parcel
12209003A
Built
1981 (county record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Retail Strip Center
Parcel size
2.20 acres
Building area
29,673 sq ft (assessor record)
Sewer
Connection on file (2012, 2013, 2025) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 3933 E Pima St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2020 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalCurrentLast permitted 2019 (7 years ago). City inspection record: MECHANICAL - FINAL approved 2019-05-21. Contractor of record: AIR O SMITH HEATING AND COOLING. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T19CM03068 — REPLACE HVAC
  • Fire alarm & life safetyCurrentA newer 2020 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “Fire Alarm & Detection Systems - sprinkler-monitoring system for existing riser; Fire Alarm Systems - New Sq Ft: 5000; Fire Alarm Systems - # New Stories: 1; Additional Plan Reviews: 2; Additional Inspections: 1”. Last permitted 2020 (6 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T20FC00189 — Modify the existing Fire Sprinkler Sytsem
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth looking at

    There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2008. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2026-02-27 (TC-COM-0226-00290) — Like-for-like replacement of existing 200A fused service disconnect..

Permit history (150)

Permit history for this parcel — 8 of 150 records
DateRecordWhatStatusValue
2026-02-27finaledTC-COM-0226-00290City permit recordCommercial BuildingLike-for-like replacement of existing 200A fused service disconnect.Complete
2026-01-21expired 2026-04-05TR-ROW-0126-00072City permit recordRight-of-Way (ROW)Asphalt patch / Remove and replace / 18’W X 66’L X 4”D / On E. Pima St. and N Alvernon Way ~*~Inspections
2025-12-03finaledTR-ROW-1225-01461City permit recordRight-of-Way (ROW)Connect private water line to water meter installed by Tucson Water. for water mill expressComplete
2025-10-22TR-UTL-1025-01842City permit recordRight-of-Way (ROW) - Utilitywo3111343 3907 e pima st 14-14-03 nw install service front of lot in asphalt 6LF/scNeeds resubmittal
2025-01-29TE-FPU-0125-00040City permit recordFloodplain UseKiosk for Watermill ExpressWithdrawn
2024-11-05finaledTC-FBB-1124-00195City permit recordFactory Built BuildingsNew Watermill Express KioskComplete
2024-05-17finaledTR-ROW-0524-00594City permit recordRight-of-Way (ROW)(Multiple Loctions) The ward 6 ADA ramp and sidewalk package involves modifications where the contractor will remove and replace the ADA ramps at arterial and side streets as shown on site maps and within tcp work areasComplete
2024-04-26TR-ROW-0424-00486City permit recordRight-of-Way (ROW)ADA RAMP MODIFICATIONS WARD 6 ADA RAMPS AND SIDEWALK PACKAGE.CONTRACTOR WILL BE REMOVING AND REPLACING ADA RAMPS AT ARTERIAL AND SIDE STREETS DEPICTED ON SITE MAPS AS WELL AS ON TCPS WORK AREASNeeds resubmittal

142 older records are not shown here. — each links to its official file.

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (40)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 40 records
DateRecordWhatStatus
2025-10-02CE-VIO1025-04360Code enforcement caseCode enforcement caseActive
2025-10-01CE-VIO1025-04342Code enforcement caseCode enforcement caseVoid
2025-05-16CE-VIO0525-02121Code enforcement caseWork without permitClosed - resolved
2025-03-20CE-VIO0325-01206Code enforcement caseCode enforcement caseClosed - unfounded
2024-09-27CE-VIO0924-03945Code enforcement caseVegetationClosed - unfounded
2022-10-31CE-VIO1022-00029Code enforcement caseSignClosed - resolved
2022-03-07T22DV01673Code enforcement caseCode enforcement caseNoverify
2020-09-28T20DV06517Code enforcement caseGraffitiReferred
Show 32 older records
Code enforcement history for this parcel — remaining 32 records
DateRecordWhatStatus
2020-02-13T20DV01041Code enforcement caseCode enforcement caseReferred
2020-02-07T20DV00915Code enforcement caseRefuseNoverify
2014-11-26T14DV09716Code enforcement caseZoningComplian
2011-06-20T11DV04653Code enforcement caseRefuseComplian
2010-10-15finaledT10FR02131Code enforcement caseCode enforcement caseComplete
2010-06-30finaledT10FR01279Code enforcement caseCode enforcement caseComplete
2010-01-12finaledT10FR00069Code enforcement caseCode enforcement caseComplete
2009-10-13finaledT09FR03247Code enforcement caseCode enforcement caseComplete
2009-03-17finaledT09FR00991Code enforcement caseCode enforcement caseComplete
2009-02-03finaledT09FR00472Code enforcement caseCode enforcement caseComplete
2008-10-28T08FR04008Code enforcement caseCode enforcement caseField
2008-08-27finaledT08FR02553Code enforcement caseCode enforcement caseComplete
2008-08-13T08DV07004Code enforcement caseCode enforcement caseNoverify
2008-01-14finaledT08FR00123Code enforcement caseCode enforcement caseComplete
2007-05-31finaledT07FR01054Code enforcement caseFireComplete
2007-05-31finaledT07FR01053Code enforcement caseFireComplete
2007-05-29finaledT07FR01020Code enforcement caseFireComplete
2007-05-25finaledT07FR01013Code enforcement caseFireComplete
2007-05-11finaledT07FR00935Code enforcement caseFireComplete
2007-05-11finaledT07FR00936Code enforcement caseCode enforcement caseComplete
2007-05-10finaledT07FR00922Code enforcement caseCode enforcement caseComplete
2007-04-26finaledT07FR00808Code enforcement caseCode enforcement caseComplete
2007-04-24finaledT07FR00790Code enforcement caseCode enforcement caseComplete
2007-04-24finaledT07FR00789Code enforcement caseFireComplete
2007-04-24finaledT07FR00786Code enforcement caseCode enforcement caseComplete
2006-06-08finaledT06FR01886Code enforcement caseCode enforcement caseComplete
2006-05-11finaledT06FR01317Code enforcement caseCode enforcement caseComplete
2006-04-25T06VL00564Code enforcement caseWork without permitComplian
2006-04-11finaledT06FR00734Code enforcement caseCode enforcement caseComplete
2001-12-10T01VL03150Code enforcement caseSignComplian
2001-12-10T01VL03149Code enforcement caseSignComplian
1998-08-24T98VL00603Code enforcement caseSignComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 12209003A — 150 permits on file from 1998 to 2026 (37 combo, 27 sign, 23 spklr, 10 fence / wall) and 40 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).