Electrical permit history — 5295 E Knight Dr
5295 E Knight Dr, Tucson — built 1985, with 26 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
5295 E Knight Dr
Built 1985 — 1980s commercial stock · HVAC 2020 (finaled)
Permanent link: Electrical permit history for 5295 E Knight Dr (aztucsonelectricalsolutions.com/property/121136410/5295-e-knight-dr-tucson-az-85712) · Public records last checked 2026-08-17
- Parcel
- 121136410
- Built
- 1985 (county record)
- Jurisdiction
- Tucson
- Zoning
- OCR-2
- Assessor use
- Medical Dental Service
- Parcel size
- 1.66 acres
- Building area
- 12,049 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalCurrentLast permitted 2020 (6 years ago). City inspection record: ELECTRIC - FINAL approved 2020-07-17. Contractor of record: PALM ELECTRIC L L C. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T20CM04146 — REPLACE DISCONNECT FOR HVAC
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Routine
Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.
Most recent permit on record for this parcel: 2025-12-03 (TR-UTL-1225-02055) — P.360684 - 3 PEDS, 1 PIT, 149' BORING, ACCESS 2 HANDHOLES FOR SPLICING.
Permit history (26)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-12-03finaled | TR-UTL-1225-02055City permit record | Right-of-Way (ROW) - UtilityP.360684 - 3 PEDS, 1 PIT, 149' BORING, ACCESS 2 HANDHOLES FOR SPLICING | Complete | |
| 2025-11-04finaled | TF-FOP-1125-01453City permit record | Fire OperationalTMCOne Knight | Complete | |
| 2025-02-05finaled | TF-FOP-0225-00174City permit record | Fire OperationalSchmidtke Dental, PC 5295 E. Knight Drive, Tucson, AZ 85712 We will be teaching students to become dental assistant. For that, we need Fire Inspection for state licensing purposes. | Complete | |
| 2025-02-04 | TF-FOP-0225-00170City permit record | Fire OperationalVOID - Submit a Fire State Licensed Facility Permit - Fire Inspection | Void | |
| 2024-10-15finaled | TF-FOP-1024-01186City permit record | Fire OperationalTMCOne Knight | Complete | |
| 2023-10-12finaled | TF-FOP-1023-01636City permit record | Fire OperationalTMC One Knight. | Complete | |
| 2023-05-04finaled | TR-UTL-0523-01448City permit record | Right-of-Way (ROW) - UtilityWO T69970 - TEP will be removing 1 pole in the ROW a 2'x2' hole/s 6' deep will be backfilled with/out sidewalk impact. | Complete | |
| 2022-10-18finaled | T22OT00759City permit record | Fence / wall2-non illum wall signs | Complete |
Show 18 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-10-11finaled | T22FO00872City permit record | Fire OperationalState Lic Facls Annual Insp - TMC ONE - OUTPATIENT; State Licensed - Other | Complete | |
| 2021-11-03finaled | T21RW04894City permit record | ROW10' TRENCHING FROM NEW POLE TO PED. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | Final | |
| 2021-10-12finaled | T21RW04642City permit record | ROWFrom the existing Cox vault East of 5285 E Knight Dr, remove and replace 59' fiber cable out of case heading South and continue 65' heading West to existing vault and continue 12' to TEP pole, riser up. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 11/22/2021 - PLAN ADD - R1 ADDING NEW TNE FOR UPCOMING WORK ON 12/03/2021 - R1 | Final | |
| 2021-09-22finaled | T21RW04355City permit record | ROW(2) 5X5 bellholes in dirt/concrete front (east side of property) to repair/replace gas line. Crews will also be working at 5295 E Knight Dr, working by N Beverly Ave. *Crews may be working Saturdays from 6:00 am to 3:00 pm. Proof of notification is required at the time of the preconstruction meeting. | Final | |
| 2021-06-29finaled | T21RW03151City permit record | ROWSTARTING ON THE WEST SIDE OF BEVERLY AVE AND NORTH OF KNIGHT ST. TRENCH 5' FORM EXISTING POLE TO NEW POL LOCATION TO MOVE EXISTING RISER PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF PRECONSTRUCTION MEETING | Final | |
| 2021-04-26finaled | T21RW02016City permit record | ROWStarting on the West side of N Beverly and South of E Grant Rd, Riser up TEP pole going South, Replace coax cable from existing Ped to pole Like for like. 1) Traffic control setup shall not commence prior to 9:00am and removed prior to 3:30pm. 2) All trenches over night shall be plated. | Final | |
| 2021-02-02finaled | T21RW00526City permit record | ROWof 2370 N Wyatt Dr, Head E and begin 600' aerial overlash 288ct fiber. Head S and continue 125' aerial overlash 288ct fiber. Riser down pole, place 3x3' pot hole and new Cox Ped. From Cox Ped, pull through existing 48ct fiber 63' S. Head W and continue 15' pull through existing 48ct fiber in to out of ROW at 5265 E Knight Drive. | Final | |
| 2021-01-28 | T21RW00469City permit record | ROW | Withdrwn | |
| 2020-07-02finaled | T20CM04146City permit record | COMBOREPLACE DISCONNECT FOR HVAC | Final | |
| 2020-05-12expired 2021-01-19 | T20CM02962City permit record | Residential Building - One or Two FamilyREPL 4TON UNIT | Expired | |
| 2018-11-01finaled | T18FO00957City permit record | FIREOPERSTATE LICENSE FACILITY | Final | |
| 2018-04-27finaled | T18RW01903City permit record | ROWStart overlash On the South side of Grant 200' going East continue 453' going South and Riser Down. Tench/bore going South 56' continue going West 20' to out of ROW. Starting at COX ped on the North side of Knight and trench/bore going East continue going North 68' continue going West 20' to out of ROW. | Final | |
| 2017-10-24finaled | T17FO00896City permit record | FIREOPERPRIMARY CARE DR DOCTOR OFFICE "B" | Final | |
| 2015-05-28finaled | T15OT00728City permit record | C-OF-OC OF O | C of o | |
| 2012-12-03finaled | T12CM07624City permit record | COMBOINSTALL:WATER HEATER:MEDICAL OFFICE | Final | |
| 2010-03-23finaled | T10OT00635City permit record | C-OF-OC OF O:PREMIER HEARING CENTER | C of o | |
| 2007-11-20finaled | T07ME00772City permit record | MECHReplace (2) 4-ton package gas electric systems. Originally roof mounted. | Final | |
| 1997-09-18finaled | T97CM02993City permit record | COMBOTI:MEDICAL OFFICES REMODEL W/METAL STUDS AND GYP. BD. | C of o |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (10)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2010-01-22finaled | T10FR00131Code enforcement case | Code enforcement case | Complete |
| 2009-09-10finaled | T09FR02930Code enforcement case | Code enforcement case | Complete |
| 2008-09-29finaled | T08FR03244Code enforcement case | Code enforcement case | Complete |
| 2008-09-29finaled | T08FR03245Code enforcement case | Code enforcement case | Complete |
| 2007-09-27finaled | T07FR01904Code enforcement case | Code enforcement case | Complete |
| 2007-09-24finaled | T07FR01857Code enforcement case | Code enforcement case | Complete |
| 2006-06-06finaled | T06FR01831Code enforcement case | Code enforcement case | Complete |
| 2006-06-05finaled | T06FR01763Code enforcement case | Code enforcement case | Complete |
Show 2 older records
| Date | Record | What | Status |
|---|---|---|---|
| 2006-05-08finaled | T06FR01220Code enforcement case | Code enforcement case | Complete |
| 2006-02-10finaled | T06FR00155Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 121136410 — 26 permits on file from 1997 to 2025 (8 row, 6 fire operational, 3 combo, 2 right-of-way (row) - utility) and 10 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
