Electrical permit history — 5025 E Lee St

5025 E Lee St, Tucson — built 2010, with 5 permits on record. Review electrical, HVAC and remodel history with links to official records.

Home

5025 E Lee St

Build year not published — permits on file from 2010 · 5 permits on record; no permitted panel/service or HVAC work among them

Parcel
121116440
Built
2010 (earliest permit on file)
Jurisdiction
Tucson
Zoning
R-2
Assessor use
Duplex - 1 Story
Parcel size
0.27 acres
Sewer
Connection on file (2018, 2019) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Typical original service for a 2010 home
approximately 200 A

See the property

County aerial photograph centered on 5025 E Lee St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. That does not tell you the service is original — only that nothing has been permitted here recently. The build year is the better clue, and it is above.
  • Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
  • Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
  • Plumbing work on recordOn recordLast permitted 2018 (8 years ago). Plumbing permits cover everything from a full re-pipe to a few feet of sewer repair, so this is a record that work happened rather than a statement about the whole system. T18CM06846 — NEW SEWER LINE - (4) HCS LINE

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Era-based check

    Modern service and panel. Most upgrades here are about available breaker spaces and circuit capacity rather than the service itself. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2022-07-05 (T22RW02391) — CURB CUT TO CREATE A 15FT DRIVEWAY Although a traffic control plan is not needed, barricading will still be required for the safety of the work site and the traveling public. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722.

Permit history (5)

Permit history for this parcel — 5 of 5 records
DateRecordWhatStatusValue
2022-07-05finaledT22RW02391City permit recordPool / spaCURB CUT TO CREATE A 15FT DRIVEWAY Although a traffic control plan is not needed, barricading will still be required for the safety of the work site and the traveling public. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722Final
2020-07-08finaledT20RW03865City permit recordROWw/o 2007341 installing new 1inch water service in dirt behind curbFinal
2018-08-30finaledT18CM06846City permit recordCOMBONEW SEWER LINE - (4) HCS LINEFinal
2018-06-29expired 2021-04-18T18CM05134City permit recordResidential Building - One or Two FamilyNEW DUPLEXExpired
2017-05-25expires 2027-01-01DP17-0122City permit recordDevelopment PackageTENTATIVE PLAT - LEE STREET LOTS 1-4Issued

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (7)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 7 of 7 records
DateRecordWhatStatus
2022-03-03T22DV01616Housing code violationWEEDSrecorded before 2023NOVERIFY
2020-08-13T20DV05595Code enforcement caseCode enforcement caseReferred
2019-12-30T19DV09578Code enforcement caseCode enforcement caseNoverify
2018-01-19T18DV00369Housing code violationHOMELESS CAMPSrecorded before 2023COMPLIAN
2017-06-08T17DV02391Housing code violationHOMELESS CAMPSrecorded before 2023COMPLIAN
2017-03-16T17DV01090Housing code violationPROP MAINT MULTIPLE TYPESrecorded before 2023COMPLIAN
2010-02-12T10DV00655Housing code violationWEEDSNotice of violation issued · recorded before 2023COMPLIAN

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this home?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 121116440 — 5 permits on file from 2017 to 2022 (1 pool / spa, 1 row, 1 combo, 1 residential building - one or two family) and 7 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.