Electrical permit history — 4702 E Grant Rd

4702 E Grant Rd, Tucson — built 1991, with 41 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

4702 E Grant Rd

Built 1991 — 1990s commercial stock · last permitted panel/service work 2022 (finaled)

Parcel
121100020
Built
1991 (county record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Restaurant Fast Food
Parcel size
0.54 acres
Building area
2,485 sq ft (assessor record)
Sewer
Connection on file (1964, 1984, 2022) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2022 permit was finalized; the permit description states “WO#1405370 @ 4702 E Grant Rd. Install new split service@6LF Will be working to the West side of address posted along the sidewalk. It is about 140 ft South of E Grant RD BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.”.

See the property

County aerial photograph centered on 4702 E Grant Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2022 (4 years ago). Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T22RW03256 — WO#1405370 @ 4702 E Grant Rd. Install new split service@6LF Will be working to the West side of address posted along the sidewalk. It is about 140 ft South of E Grant RD BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 fire operational permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TC-COM-0124-00049 — Submitting per discussion with Juan Garcia New CofO for existing space, previous CofO incorrectly stated this structure had sprinklers. T21CM07674. Per Juan no review required, just new CofO
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

  • Worth confirming

    A pool or spa was permitted in 2024. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2012-12-27$620,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-10-08 (TR-UTL-1024-01938) — Cox to aerial overlash 511' and bore 129' to install conduit for system tie..

Permit history (41)

Permit history for this parcel — 8 of 41 records
DateRecordWhatStatusValue
2024-10-08finaledTR-UTL-1024-01938City permit recordRight-of-Way (ROW) - UtilityCox to aerial overlash 511' and bore 129' to install conduit for system tie.Complete
2024-01-09finaledTC-COM-0124-00049City permit recordPool / spaSubmitting per discussion with Juan Garcia New CofO for existing space, previous CofO incorrectly stated this structure had sprinklers. T21CM07674. Per Juan no review required, just new CofOComplete
2022-12-28finaledTR-UTL-1222-00523City permit recordRight-of-Way (ROW) - UtilityWO T49021 - TEP will be removing 1 pole pole in R/W a 4'x4' hole 6' deep with no S/W impact.Complete
2022-10-04expired 2023-10-19T22OT00717City permit recordSign - PermanentMonument sign for Starbucks (2nd sign for Swan frontage for overall center)Issued
2022-09-08finaledT22RW03256City permit recordPool / spaWO#1405370 @ 4702 E Grant Rd. Install new split service@6LF Will be working to the West side of address posted along the sidewalk. It is about 140 ft South of E Grant RD BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.Final
2022-08-30finaledT22FO00743City permit recordFire OperationalPlaces of Assembly - STARBUCKS - OCC 51; Other Operational PermitComplete
2022-08-02finaledT22RW02758City permit recordPool / spaWO# T18181 TEP Installing riser on existing pole in ROW ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.Final
2022-06-23finaledT22OT00445City permit recordFence / wallWall and drive thru signs for new StarbucksComplete
Show 33 older records
Permit history for this parcel — remaining 33 records
DateRecordWhatStatusValue
2022-04-12finaledT22RW01464City permit recordPool / spaWO# T29716 TEP TO REMOVE POLE AT 4702 E GRANT. REMOVE SECONDARY. SECONDARY WIRE CROSSES SWAN RD. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.Final
2022-02-15finaledT22RW00538City permit recordRight-of-Way (ROW)STARBUCKS AT GRANT/SWAN CENTER, DP21-0147INSTALLATION OF TWO HANDICAP RAMPS, TOTAL OF 500' OF LI; Work Order: DP21-0147Complete
2022-01-03finaledT22RW02917City permit recordRight-of-Way (ROW)COX TO OVERLASH 436' COAX TO EXISTING AERIAL STRAND AND RISER DOWN AND PULL THRU EXISTING CONDUIT TO; Work Order: PRJ228005-1Complete
2021-10-20finaledT21RW04759City permit recordROW1 BELL HOLE 5'X8' IN NORTH BOUND TURNING & BIKE LANES ON TO SWAN ROAD, IN ASPHALT. HEAVY TRAFFIC IN PROPOSED WORK AREA FOR AN ABANDONMENT FOR SOUTHWEST GAS SERVICE LINE. WORK LOCATED ON EAST SIDE OF N SWAN RD, SOUTH OF E GRANT RD.Final
2021-09-24finaledT21CM07674City permit recordCOMBORESTAURANTC of o
2021-09-16finaledT21BU00434City permit recordDemolitionDemolition of approximately 2,575sf metal commercial structure and associated 3,080sf metal canopy.Final
2021-09-15DS21-11City permit recordZoning Verification LetterStarbucks, TSMR - Starbucks, TSMR: 7-01.3.3.b - Pedestrian path and sidewalk.Approved
2021-06-11finaledDP21-0147City permit recordDevelopment PackageSite/Grading - Starbucks at Grant/Swan Center.Complete
2021-06-11finaledT21CM04899City permit recordCOMBONew Shell building for future StarbucksL of c
2021-02-12DP21-0043City permit recordDemolitionSITE - Starbucks, demolition, new construction.Withdrwn
2020-09-14finaledT20RW05037City permit recordROWN.764289 - JOB WILL REQUIRE ACCESS MH #15431 TO SPLICE & PLACE FIBER.Final
2020-06-18finaledT20RW03477City permit recordROWStarting on the S/E corner of E Grant Rd and N Swan Rd at TEP pole Overlash Fiber going West 165' South 580' continuing S/W 36' tie in to existing BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION.Final
2020-06-12expired 2020-08-23T20RW03368City permit recordROWStarting on the S/E corner of E Grant Rd and N Swan Rd at TEP pole Overlash Fiber going West 165' South 580' continuing S/W 36' tie in to existing NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934Void
2020-05-22finaledT20RW02952City permit recordROWFrom TEP Pole N of 4702 E Grant Rd, Head W and begin 1264' aerial overlash, riser down. Head N and begin 90' bore, place 3x3' pot hole.Head W and continue 90' bore. Place 4x4' pot hole and new Cox vault tie in. PERMIT ORIGINALLY FOR 05/08/2020 - 07/08/2020 NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934Final
2020-04-02finaledT20RW01973City permit recordROWINSTALLATION OF FIBER - From TEP pole West of 4702 E Grant Rd, begin 792' aerial overlash heading West, riser down and 25' pull through existing conduit to COX vault. Continue 25' pull through existing conduit, heading East, continue 150' pull through existing conduit South , replace pedestal with new PED vault, (3x3) pothole, tie in. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION.Final
2019-08-01finaledT19RW04231City permit recordROWSix cores between 4700 E. Grant Road to 5500 E. Grant Road. Cores are 4" in diameter and borings will reach a depth of 2 feet below the pavement. Please see the attached boring map for locations. CIP-FY21 PACKAGE 7 ADDRESS ON APPLICATION-4700 E GRANT ROAD TO 5500 E GRANT RDFinal
2017-08-28finaledT17RW03830City permit recordROWStart Point: On the South side of E Grant and N Swan Rd, from the TEP pole begin over 160' overlash head West. Continuing 872' overlash heading North. Riser down 25' begin 90' double stuff 2'' existing conduit over coax heading North, continuing double stuff 65' heading east. replace ped with vault (3x3 pothole) . Continue 400' double stuff heading South. Replace ped with vault (3x3 pothole) , continue 25' double stuff to out of ROWFinal
2016-06-29finaledT16CM05049City permit recordCOMBOTI; RETAILL of c
2016-04-12T16CM02662City permit recordCOMBOT16DV02022 - TI: RETAILWithdrwn
2016-01-08expired 2017-01-07T16OT00043City permit recordPEDDLERPEDDLER: Maxwell Area Rugs / Steve MaxwellExpired
2015-03-18T15CM01817City permit recordCOMBODEMO CANOPYWithdrwn
2012-07-02finaledT12BU00822City permit recordTANKSREMOVE UNDERGROUND FUEL TANKFinal
2007-08-28finaledT07BU01803City permit recordTANKSTANK:REPLACEFinal
2007-02-12expired 2008-02-13T07OT00344City permit recordPEDDLERTILLIE GROFFO - VALENTINE'S DAY PEDDLER REGULATED PEDDLER -TEDDY BEARSExpired
2006-10-16finaledT06OT02673City permit recordSIGN11993Final
2005-05-10finaledT05CM02112City permit recordCOMBOTI: RETAILC of o
2004-11-04finaledT04OT02211City permit recordSIGNSIGN:8031 COXCOFinal
2002-10-08finaledT02ME00658City permit recordMECHREPLACE:A/C UNIT (APA)Final
2002-01-24finaledT02OT00141City permit recordSIGNSIGN:3587Final
2002-01-03finaledT02BU00019City permit recordBUILDRETRO FITTING CANOPY RECOVER FACIA PANELS ON CANOPY W/ NEW 0.050 ALUMINUM FACIA COVER ATTACHED W/ TEK SCREWS AND POP RIVETSFinal
2000-06-27finaledT00ME00775City permit recordMECHPRESSURE VESSEL CERTIFICATE:TUC-23088Final
1999-04-08expired 2008-08-09T99CM01580City permit recordCOMBOTI:SERVICE STATIONClosed
1998-04-14finaledT98EL00639City permit recordELECTREPAIR:ELECTRICFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (10)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 10 records
DateRecordWhatStatus
2019-05-15T19DV03992Code enforcement caseCode enforcement caseNoverify
2017-02-21T17DV00706Code enforcement caseZoningComplian
2016-04-01T16DV02022Code enforcement caseElectricalComplian
2015-09-15T15DV06760Code enforcement caseVegetationComplian
2013-11-06T13DV08319Code enforcement caseVegetationComplian
2013-04-10T13DV02279Code enforcement caseVegetationComplian
2012-06-21T12DV05193Code enforcement caseGraffitiComplian
2010-08-11finaledT10FR01688Code enforcement caseCode enforcement caseComplete
Show 2 older records
Code enforcement history for this parcel — remaining 2 records
DateRecordWhatStatus
2007-08-09finaledT07FR01537Code enforcement caseCode enforcement caseComplete
1999-11-16T99VL02856Code enforcement caseCode enforcement caseVoid

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 121100020 — 41 permits on file from 1998 to 2024 (8 row, 7 combo, 4 pool / spa, 3 sign) and 10 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).