Electrical permit history — 3820 S Pandora Av

3820 S Pandora Av, Tucson — built 2016, with 24 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3820 S Pandora Av

Built 2016 — 2010s commercial stock · last permitted panel/service work 2016 (finaled)

Parcel
119413710
Built
2016 (assessor record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Car/Truck Wash Full Service
Parcel size
1.23 acres
Building area
5,684 sq ft (assessor record)
Sewer
Connection on file (2016) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2016 permit was finalized; the permit description states “6 LF AT EAST SIDE OF DIRT LOT BETWEEN CURB AND SIDEWALK TO RENEW LEAKING SERVICE- TW CREW WILL BE USING UTILITY TRUCKS AND SAFETY CONES. WORK ORDER # 1609567”.

See the property

County aerial photograph centered on 3820 S Pandora Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2016 (10 years ago). City inspection record: last recorded inspection 2016-08-23; no approved final is shown. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T16RW00339 — 6 LF AT EAST SIDE OF DIRT LOT BETWEEN CURB AND SIDEWALK TO RENEW LEAKING SERVICE- TW CREW WILL BE USING UTILITY TRUCKS AND SAFETY CONES. WORK ORDER # 1609567
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0523-00687 — Install a Fire Alarm Panel and TG7 Cell Radio Dialer
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (3)

Recorded transfers from the Pima County Assessor — 3 of 3
DatePriceType
2024-12-12$4,538,000Warranty Deed
2023-04-19$4,975,000Warranty Deed
2010-09-14$2,650,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2024-06-11 (TS-PRM-0624-00271) — Install one lighted monument sign.

Permit history (24)

Permit history for this parcel — 8 of 24 records
DateRecordWhatStatusValue
2024-06-11expired 2025-05-05TS-PRM-0624-00271City permit recordSign - PermanentInstall one lighted monument signInspections
2023-08-03finaledTS-PRM-0823-00439City permit recordSign - PermanentInstall one lighted monument sign on existing footing.Complete
2023-08-01finaledTS-PRM-0823-00436City permit recordFence / wallInstall 5 lighted wall signs, 2 lighted directional signs and 2 lighted canopy signs.Complete
2023-06-20expired 2023-12-17TC-DMO-0623-00147City permit recordDemolitionDemolition of ramada at car washExpired
2023-05-11finaledTF-FCP-0523-00687City permit recordFire ConstructionInstall a Fire Alarm Panel and TG7 Cell Radio DialerComplete
2023-02-01finaledTZ-CMP-0223-00056City permit recordZoning Verification LetterRequesting a Zoning Verification Letter for the Dynamite Car Wash property located at 3840 South Pandora Avenue, Tucson, AZ 85714 (Also Associated: 3820 S. Pandora Avenue), Parcel: 119-41-3710. Please include both addresses if possible, 3840 S. Pandora was not found as an option to include with all addresses. Please see attached request letter for all request details.Complete
2022-03-07expired 2023-11-01T22FC00170City permit recordFire ConstructionFire Alarm & Detection Systems - Replace dialer from 3G to 4G.Needs resubmittal
2018-08-30expired 2019-09-28T18OT01028City permit recordSign - Permanent(submitted 8/30/18) inspections done for placement/easement recordations done for abandonments alonExpired
Show 16 older records
Permit history for this parcel — remaining 16 records
DateRecordWhatStatusValue
2018-05-18finaledT18RW02311City permit recordROWTEP will need to excavate approximately 50' under Pandora to install conduit & cable due to conflict with storm drain being installed for ADOT PI project along Ajo Way. TEP to repair sidewalk if necessary.Final
2017-12-13expired 2018-06-11T17OT01283City permit recordFence / wall1-ILLUM WALL SIGNExpired
2017-11-01expired 2018-05-05T17OT01136City permit recordFence / wall1- ILLUM WALL SIGNExpired
2017-01-10expired 2017-07-23T17CM00194City permit recordCOMBOFLAG POLEExpired
2016-11-01expired 2017-06-19T16OT01327City permit recordSIGN2-back to back EMCs (DF MONU)Expired
2016-08-25finaledT16BU01222City permit recordBUILDFIREALARMFinal
2016-07-07finaledT16RW00339City permit recordROW6 LF AT EAST SIDE OF DIRT LOT BETWEEN CURB AND SIDEWALK TO RENEW LEAKING SERVICE- TW CREW WILL BE USING UTILITY TRUCKS AND SAFETY CONES. WORK ORDER # 1609567Final
2016-06-07finaledT16BU00857City permit recordSPKLRFIRE SPRKLFinal
2016-05-31finaledT16EX02106City permit recordEXCAVSTARTING AT COX PED IN FRONT OF 1326 LAPORTE LN, BORE/TRENCH 125' W UNDER S PANDORA AV THEN CONTINUING N. 191' THEN PLACING A NEW COX PED. WORK ORDER # 41520160000CTUT0027Final
2016-05-31T16TC01314City permit recordBARRICADSTARTING AT COX PED IN FRONT OF 1326 LAPORTE LN, BORE/TRENCH 125' W UNDER S PANDORA AV THEN CONTINUING N. 191' THEN PLACING A NEW COX PED. WORK ORDER # 41520160000CTUT0027Expired
2016-02-26finaledT16BU00302City permit recordSPKLRFIRE SPRKLFinal
2016-02-18finaledT16EX00487City permit recordEXCAV125' BORE CROSSING S PANDORA AVE THEN TURN NORTH AND TRENCH THRU DIRT 191' AND PLACE A SERVICE PED AND THEN ONTO PRIVATE PROPERTY 41520160000CTU0027Final
2016-02-18T16TC00392City permit recordBARRICAD125' BORE CROSSING S PANDORA AVE THEN TURN NORTH AND TRENCH THRU DIRT 191' AND PLACE A SERVICE PED AND THEN ONTO PRIVATE PROPERTY 41520160000CTU0027Expired
2015-10-22finaledT15CM07324City permit recordCOMBOCAR WASHC of o
2015-09-09expired 2017-04-18T15OT01196City permit recordFence / wall7 - ILLUM SIGN (6 WALL & 1 DD)Expired
2015-08-27finaledDP15-0141City permit recordDevelopment PackageSELF - SERVE CAR WASH AND ASSOCIATED IMPROVEMENTComplete

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 119413710 — 24 permits on file from 2015 to 2024 (4 fence / wall, 3 sign - permanent, 2 fire construction, 2 row) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).