  • Electrical service: no service or distribution permit on record for this 2012 building.
  • Watch for: built 2012; the live question is spare capacity for new loads, not the age of the gear.
  • Other work on record: fire alarm system permit 2025, general operational fire permit 2023, general operational fire permit 2018, and 12 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Probably not: no service or distribution work is on record, which is normal for a building built in 2012.

  • Electrical service & distributionLooks currentNo service or distribution permit on record for this 2012 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2025 fire alarm system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalWorth checkingNo permit on record names this system. Worth knowing: a 2025 fire alarm system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLooks currentLast permitted 2025 (1 year ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0825-00691 — REPLACING NON-FUNCTIONAL FACP WITH EXACT MODEL (FC-901)
  • RoofLooks currentBuilt 2012; no permit on record since, which is normal for equipment this age. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

  • Routine

    A trade permit was pulled in 2012. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 3,827 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 2,700 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 30 kW — roughly 80 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 49,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $4,000–$6,500 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 3.9 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11941176D
Year constructed
2012 (assessor record)
Permitting authority
Tucson
Zoning
C-2
Property type
Restaurant Fast Food
Building area
3,896 sq ft
Electrical service
No service or distribution permit on record for this 2012 building. (the era estimate is from the year built, 2012 — not a measurement)

Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2025. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 21 building permits for this parcel dated between 1997 and 2025. Five general operational fire permits, four trade permits, three permanent sign permits and two annual portable sign compliance permits. 15 of them carry a final inspection; the other 6 were issued, expired or are still open, which is not the same as work completed. There are 4 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Street and utility work at this address. The City’s file also shows two right-of-way or utility permits here (2022, 2023) — work in the street or on a utility’s lines, not on the building, so they are left out of the counts above.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11941176D.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85713 · Commercial & industrial reports · Homes in 85713 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on W AJO WY hold 3,083 City permits on record, 618 of them since 2022.

Counts and years from the same public records.

Complete permit record (25 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2025TF-FCP-0825-00691Fire Alarm System PermitComplete
2023TF-FOP-0123-00391General Operational Fire PermitComplete
2022T22DV02325MULTIPLE TYPESCOMPLIAN
2018T18FO00368General Operational Fire PermitComplete
2018T17FO00443General Operational Fire PermitComplete
2017T17FO00441General Operational Fire PermitComplete
2017T17FO00442General Operational Fire PermitComplete
2013T13DV08683CLEAN CITIES INITIATIVE PGRMNOVERIFY
2013T13DV03938SIGN VIOLATIONCOMPLIAN
2012T12OT01529Annual Portable Sign ComplianceComplete
2012T12OT01530Annual Portable Sign ComplianceCanceled
2012T12OT01489Permanent Sign PermitCanceled
2012T12BU01265Commercial Trade PermitComplete
2012T12OT01473Permanent Sign PermitCanceled
2012T12OT01346Permanent Sign PermitComplete
2012T12BU01074Fire Automatic Extinguishing System PermitComplete
2012T12BU01029Commercial Trade PermitComplete
2012T12BU00859Commercial DemolitionCanceled
2012T12CM02618Commercial New Building PermitComplete
2012DP12-0006Development PackageComplete
2012CWH-12-0006Commercial Water Harvesting OrdinanceActive
2011T11DV01272SIGN VIOLATIONCOURTCMP
2001T01BU00108Commercial Addition/Alteration PermitCanceled
1999T99PL00045Commercial Trade PermitComplete
1997T97PL02076Commercial Trade PermitComplete

How this report was built

This is a reading of public records for parcel 11941176D — 21 City permits on file from 1997 to 2025 and 2 street or utility permits and 4 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.