Electrical permit history — 38 E Alameda St
38 E Alameda St, Tucson — built 2012, with 30 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
38 E Alameda St
Built 2012 — 2010s commercial stock · 30 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 38 E Alameda St (aztucsonelectricalsolutions.com/property/11716015a/38-e-alameda-st-tucson-az-85701) · Public records last checked 2026-08-17
- Parcel
- 11716015A
- Built
- 2012 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- OCR-2
- Assessor use
- County Commercial Property
- Parcel size
- 4.25 acres
- Building area
- 570,574 sq ft (assessor record)
- Sewer
- Connection on file (2014) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2020 row permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2020 row permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
A pool or spa was permitted in 2020. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2026-06-03 (TR-ROW-0626-00677) — Renewing the permit for the street pole banners in the downtown business improvement district. Approximately 156 street poles..
Permit history (30)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-06-03expires 2027-07-30 | TR-ROW-0626-00677City permit record | Right-of-Way (ROW)Renewing the permit for the street pole banners in the downtown business improvement district. Approximately 156 street poles. | Issued | |
| 2026-02-19 | TR-UTL-0226-00343City permit record | Right-of-Way (ROW) - Utility02/23/2026- Withdrawn permit due to customer request. COX TO TRENCH 13' and BORE 140' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE | Withdrawn | |
| 2025-06-12finaled | TR-ROW-0625-00798City permit record | Right-of-Way (ROW)Installation of 104 pole banners in and around the city's downtown area. Traffic control will be via bucket-truck. (6/13/2025 Standard Pre-warning Signs and Truck mounted strobe light to be required during work, per DTM Eng review) | Complete | |
| 2023-08-22finaled | TR-ROW-0823-01080City permit record | Right-of-Way (ROW)Demonstration of 2 way bike lane 9-15-23 6am to 3:30pm. PO# Parking Day. | Complete | |
| 2021-06-04finaled | T21RW02719City permit record | ROWN.865428-1- AT CORNER OF E. ALAMEDA ST AND GROSSETTA AVE ACCESS MH 465 TO SPLICE EXISTING CABLE. ADDRESS ON APPLICATION: 150 N STONE AV PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. | Final | |
| 2020-09-21finaled | T20RW05145City permit record | Pool / spaStarting on the North/West side of Council and Stone pull thru existing 37' East continue going South on Stone Ave 292' Continue East on Alameda 190' to vault. Trench/bore 35' going East and place two vaults to end of ROW. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 3. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. ADD BUSINESS ACCESS SIGNS WITHIN TRAFFIC CONTROL DEVICES WHERE APPROPRIATE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. | Final | |
| 2020-09-01finaled | T20RW04848City permit record | ROWAPPROXIMATELY 156 STREET POLE BANNERS FOR DOWNTOWN REOPENING MARKETING CAMPAIGN IN PARTNERSHIP WITH PIMA COUNTY BACK-TO-BUSINESS INITIATIVE. PLEASE REFER TO MAP FOR STRETCHES OF STREET BANNERS WILL BE INSTALLED AND THE NUMBER OF POLES (BANNERS) ON EACH STRETCH. "WELCOME BACK" "READY FOR YOU" "HOLA - LISTO PARA SERVIR" "CLEAN & SAFE" WITH "DOWNTOWNTUCSON.ORG" AND DTP LOGO TO LEAD PEOPLE TO A LISTING OF OPEN BUSINESSES DOWNTOWN WHO HAVE BEEN CERTIFIED BY THE PC HEALTH DEPT. AS 'READY FOR YOU.' BANNERS TO BE INSTALLED BY DTP ON A SUNDAY/MONDAY EARLY MORNING 4AM-7AM. A SEPARATE TRACK ACCESS APPLICATION WILL BE SUBMITTED TO SUN LINK. POWER DOWN OF STREETCAR OCS LINE WILL BE REQUESTED FOR BANNERS BEING INSTALLED ON CONGRESS AND BROADWAY FOR TIME(S) AFTER THE STREETCAR IS NON-OPERATIONAL. RUSS STONE, MAINTENANCE AND SAFETY SUPERVISOR (520-940-0806) WILL PERFORM INSTALL WITH USE OF DTP BUCKET TRUCK. CITY OF TUCSON NOT RESPONSIBLE FOR REPLACEMENT OF BRACKETS NOR BANNERS MOUNTED ON ANY CITY LIGHT POLES DAMAGED OR REMOVED BY WEATHER OR VEHICLE MAINTAIN BANNERS IN GOOD CONDITION, CHECK AFTER SEVERE WEATHER. REPLACE AS NECESSARY WITH PERMISSION FROM TDOT. SHALL PROVIDE FLAGGERS, KEEP PEDESTRIAN WALKWAYS SAFE, INSTALL DURING NON BUSINESS HOURS AND REPAIR ANY DAMAGE THEY CAUSE. SHALL COORDINATE WITH SUNLINK PRIOR TO STARTNG WORK STONE BETWEEN PENNINGTON AND TOOLE (10 BANNERS) | Final | |
| 2020-01-09finaled | T20RW00124City permit record | Pool / spaASPHALT/CONCRETE RESTORATION FROM FIBER OPTIC CABLE INSTALLATION - BLACK CANARY 2 SC (PREVIOUS NUMBER T19RW05281). USE ASPHALT MIX CITY OF TUCSON MIX #2. SAW CUTS SHALL BE DONE UP TO CURB/CONCRETE AND MUST BE CLEAN CONSISTENT CUTS THAT MEET PAVEMENT MORATORIUM STANDARDS. PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER SHALL BE RESTORED AS ONE CLUSTER PATCH. INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE AS A STAND ALONE. * CONGRESS STREET IS A MILL AND FILL ONLY. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 &/OR CHRISTINA ROCK AT 520-206-8934 MINIMUM OF 24 HOURS PRIOR TO START OF WORK. CONTRACTOR SHALL NOT SET UP TRAFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHALL BE REMOVED PRIOR TO 3:30 PM ** Permit end date has been modified due to traffic restriction beginning January 31, 2020 - February 16, 2020 (Gem Show). | Final |
Show 22 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2019-11-13finaled | T19RW06980City permit record | ROWN.555937 Job will require access to MH#465 to splice fiber. NOTES: PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. | Final | |
| 2019-09-16finaled | T19RW05281City permit record | Pool / spaBoring, excavation, asphalt and concrete restoration for new fiber optic cable installation owned by the Zayo Group. (Black Canary 2 SC) NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. YOU WILL HAVE TO NOTIFY PARKTUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO YOU WILL HAVE TO NOTIFY SUN TRAN 24 HOURS PRIOR TO WORK, PLEASE READ BELOW FOR CONTACT INFO TEMPORARY NOISE EXEMPTION (TNE) IS ATTACHED TO THIS PERMIT, TNE FROM OCTOBER 24, 2019 - NOVEMBER 23, 2019 FROM 6: 00 PM- 6:00 AM Stone and Alameda are under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. Caution: Pima County has communication facility that cross Stone Ave at Sta. +/- 40+50 and run north along east side of Stone in sidewalk area. PER R2: DAY WORK GRANTED BETWEEN 9:00 AM - 3:30 PM FOR RESTORATION WORK ONLY. CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHELL BE REMOVED PRIOR TO 3:30 PM WORK IN RESIDENTIAL AREA WILL BE PERMITTED DURING 6:00 PM - 10:00 PM NO WORK SHELL BE DONE ON NOVEMBER 11TH 2019 - 7:00 AM- 2:00 PM TO ACCOMMODATE CIVIL EVENT (VETERANS DAY PARADE) POTHOLES/BORE HOLES REPAIRS ARE AS FOLLOWED: * TUCSON MIX (PG 70-10) WILL BE USED ON ALL PATCHING WORK * NO SAW CUTS PERMITTED IN THIS AREA, ASPHALT THAT IS DISTURBED TO FILL POTHOLES, MUST BE A CLEAN CONSISTENT CUTS THAT MEETS PAVEMENT MORATORIUM STANDARDS. *INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE. *ALL PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER HAVE BEEN ADDRESSED AND APPROVED TO PATCH PER CLUSTER. CONTRACTOR WILL FOLLOW AND FILL ALL POTHOLES ADDRESSED ON PATCHING PLAN PROVIDED TO THE CITY, AND ATTACHED TO THIS PERMIT. *PATCH WIDTH MUST BE A MINIMUM OF 2 FEET WIDE AND WILL GO FROM THE FACE OF THE CURB TO APPROPRIATE 2 FEET DIMENSION. *IF POTHOLES/BORE HOLES ARE OUTSIDE THE 2 FOOT WIDTH THE PATCH WILL BE ADJUSTED TO THE APPROPRIATE WIDTH TO COVER. * CONGRESS STREET IS THE ONLY EXCEPTION TO THE POTHOLES/BORE HOLES REPAIRS. CONGRESS STREET IS A MILL AND FILL ONLY. PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. | Final | |
| 2019-06-13finaled | T19RW03359City permit record | ROWJob requires access to MH# 465 to splice fiber | Final | |
| 2019-02-06finaled | T19RW00665City permit record | ROWN.427387 - Job requires access to MH# 465 along E Alameda St. to splice existing fibers. This is the same work as the expired permit T18RW04641 ADDRESS ON APPLICATION-54 E ALAMEDA ST | Final | |
| 2018-11-05 | T18CM08830City permit record | Residential Building - One or Two Familynew sfr | Canceled | |
| 2018-10-15finaled | T18RW04641City permit record | ROWACCESS MANHOLE #465 ALONG E ALAMEDA ST TO SPLICE EXISTING FIBERS | Final | |
| 2018-09-17finaled | T18RW04146City permit record | ROWN.416762 - Job requires access to MH# 465 and MH# 419 on NW and NE corner of Grossetta Ave & E Alameda St. NOTE: GROSSETA AV IS PIMA COUNTY RIGHT-OF-WAY, THIS PERMIT IS GOOD FOR CITY OF TUCSON RIGHT-OF-WAY ONLY. | Final | |
| 2018-07-12 | T18CM05460City permit record | Solar PVSOLAR PHOTOVOLTAIC PARKING CANOPY | Withdrwn | |
| 2017-07-26expired 2017-08-30 | T17RW03181City permit record | ROWLANE CLOSURE REQUIRED TO MOVE EXISTING EQUIPMENT 08/07/2017-PLAN CHANGE-R1 CHANGED TRAFFIC CONTROL PLAN AND COMPANY | Expired | |
| 2016-06-10expired 2016-08-12 | T16EX02266City permit record | EXCAVTEP TO INSTALL 1 ANCHOR. TRAFFIC CONTROL WILL BE REQUIRED TO PARK IN ROW TO WORK ON EXISTING POLES 225 S STONE AVE. WAS LISTED ON APP. | Expired | |
| 2016-06-10finaled | T16TC01434City permit record | BARRICADTEP TO INSTALL 1 ANCHOR. TRAFFIC CONTROL WILL BE REQUIRED TO PARK IN ROW TO WORK ON EXISTING POLES 225 S STONE AVE. WAS LISTED ON APP. | Final | |
| 2016-05-16 | T16EX01868City permit record | EXCAVtest | Void | |
| 2016-03-14 | T16EX00785City permit record | EXCAVREMOVE, MODIFY AND RE-INSTALL EXISTING BUS SHELTER CITY PROJECT-TOM FISHER/PROJECT MANAGER PLEASE CALL PARK TUCSON AT 520-791-5071; THIS IS A PERMIT AREA. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Jonathan Mabry, Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Contact Jonathan Mabry at 520-837-6968 or jonathan.mabry@tucsonaz.gov with any questions. | Withdrwn | |
| 2016-03-14 | T16TC00634City permit record | BARRICADREMOVE, MODIFY AND RE-INSTALL EXISTING BUS SHELTER CITY PROJECT-TOM FISHER/PROJECT MANAGER | Withdrwn | |
| 2015-04-07expired 2015-10-04 | T15OT00469City permit record | SIGNSIGN | Void | |
| 2013-03-14expired 2013-05-13 | T13EX00379City permit record | EXCAVTRENCHING AT 4 LOCATIONS TO PLACE SEWER LINES AND MANHOLES PER PC RWRD PLAN G-2012-23. TRENCHING WILL TAKE PLACE ON TOOLE AVE BETWEEN STONE AVE AND 6TH AVE. TOOLE AVE IS UNDER A PAVEMENT CUT MORATORIUM UNTIL SEPT 2015 AND WILL REQUIRE A 2" MILL AND INLAY ON 50' ON EACH SIDE OF THE TRENCH FOR THE FULL WIDTH OF THE AFFECTED TRAVEL LANES. ASPHALT MUST MEETING MATCH EXISTING SURFACE COURSE. | Closed | |
| 2012-08-16expired 2023-04-05 | T12BU00970City permit record | SPKLRInstall 346' of 8" & 195' of 6" fire underground piping | Closed | |
| 2012-07-16expired 2012-09-14 | T12EX00384City permit record | EXCAVTRENCHING FOR INSTALLING 2318 LF OF WATER LINE PER TUCSON WATER PLAN 2-124-2011 | Closed | |
| 2012-02-16 | T12BU00230City permit record | GRADSWPPGRADING REVIEW PER ERNIE DUARTE | Withdrwn | |
| 2012-02-14 | T12BU00217City permit record | TEMP-FBBTHREE CONSTRUCTION TRAILERS W/ELECTRIC | Void | |
| 2011-12-22expired 2012-02-20 | T11EX00630City permit record | EXCAVEXCAVATION, BACKFILL AND ALL SURFACE REPAIRS | Closed | |
| 2011-12-22expired 2012-02-20 | T11EX00631City permit record | EXCAVEXCAVATION, BACKFILL AND ALL SURFACE REPAIRS | Closed |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 11716015A — 30 permits on file from 2011 to 2026 (8 row, 7 excav, 3 right-of-way (row), 3 pool / spa) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
