Electrical permit history — 192 S Stone Av

192 S Stone Av, Tucson — built 1921, with 35 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

192 S Stone Av

Built 1921 — 1920s commercial stock · 35 permits on record; no permitted panel/service or HVAC work among them

Parcel
11713156B
Built
1921 (assessor record)
Jurisdiction
Tucson
Zoning
C-3
Assessor use
Misc Commercial
Parcel size
2.07 acres
Building area
91,370 sq ft (assessor record)
Sewer
Connection on file (2016, 2017) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 192 S Stone Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 right-of-way (row) permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 right-of-way (row) permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2018 (8 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T18FC00766 — Fire sprinkler underground supply piping
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2024. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Most recent permit on record for this parcel: 2026-08-14 (TS-PRM-0826-00296) — Install 2 lighted wall signs and one freestanding lighted post sign..

Permit history (35)

Permit history for this parcel — 8 of 35 records
DateRecordWhatStatusValue
2026-08-14TS-PRM-0826-00296City permit recordFence / wallInstall 2 lighted wall signs and one freestanding lighted post sign.Submitted - online
2026-07-17expires 2026-10-19TF-FOP-0726-00970City permit recordFire OperationalSt. Augustine Cathedral Parish FiestaIssued
2026-01-27finaledTR-ROW-0126-00114City permit recordRight-of-Way (ROW)KXCI Baila el Pueblo music festival -- special event and fire permit submitted. Traffic control set up and take down: Set-up on Friday 3/20/26 8am, Take-down on 3/22/26 3amComplete
2026-01-07finaledTR-ROW-0126-00013City permit recordRight-of-Way (ROW)Ordination/Installation Mass and Receptions for Bishop elect James Misko Traffic control set up and take down: Thursday, February 19th - 10:00 am Reopen Friday, February 20th at 10:00 pmComplete
2025-12-17finaledTF-FOP-1225-01657City permit recordFire OperationalKXCI Baila el Pueblo Music FestivalComplete
2025-11-22finaledTR-ROW-1125-01433City permit recordRight-of-Way (ROW)March for Life 2026 January 17th 10:00-12:00 Peaceful march from St. Agustine cathedral to Holy Hope Cemetary Traffic control set up and take down: Same day set up and removeComplete
2025-09-18finaledTF-FOP-0925-01239City permit recordFire OperationalSt. Augustine Cathedral Fiesta (520) 850-4967 Aguallo, ElizabethComplete
2025-09-07finaledTF-FOP-0925-01189City permit recordFire OperationalSt. Cyril Catholic School - fundraiserComplete
Show 27 older records
Permit history for this parcel — remaining 27 records
DateRecordWhatStatusValue
2025-08-22TF-FOP-0825-01129City permit recordFire OperationalVOID - Submit 30 days before event - Fundraiser for St. Cyril Catholic School Day of Event Contact: George Bon, Event Chair (520) 272-0587Void
2025-08-22finaledTR-ROW-0825-01044City permit recordRight-of-Way (ROW)St. Augustine Cathedral Parish Dinner/Dance and Parish Fiesta on October 18-19, 2025. Traffic control set up and take down: 8:00 am - 11:00 pmComplete
2025-08-14TF-FOP-0825-01102City permit recordFire OperationalVOID - Submit 30 days before event - St. Augustine Cathedral FiestaVoid
2024-12-12finaledTR-ROW-1224-01420City permit recordRight-of-Way (ROW)A gathering of youth from the parishes in the Diocese of TucsonComplete
2024-10-28finaledTF-FOP-1024-01229City permit recordFire OperationalSt. Cyril of Alexandria School - Annual fundraiser Day of Event Contact: Danielle A. Coleman, M.Ed. Principal, St. Cyril of Alexandria School 4725 E Pima St, Tucson, AZ 85712 Phone: (520) 881-4240Complete
2024-09-23finaledTR-ROW-0924-01094City permit recordRight-of-Way (ROW)Paeceful and prayerful March from St. Agustine Cathedral to Holy Hope Cemetary -4.2 miles-30th year with this eventComplete
2024-07-30finaledTF-FOP-0724-00857City permit recordFire OperationalSt. Augustine Parish Fiesta - special events - organizer - Issued 10/18/24Complete
2024-05-28finaledTF-FOP-0524-00635City permit recordFire OperationalTucson Water- special eventComplete
2024-05-06finaledTF-FOP-0524-00561City permit recordFire OperationalSt. Augustine Parish Fundraiser- Special Event OrganizerComplete
2024-02-12finaledTR-UTL-0224-00298City permit recordRight-of-Way (ROW) - UtilityTroubleshot Verizon Cell Site*** Contractor: Pearce Services - Contact: Aaron Stichter - Phone: (805) 220-3217Complete
2024-01-09finaledTC-COM-0124-00048City permit recordSolar PVInstall PV Solar parking canopies . 300.78 DC Kw / 232.00 AC KwComplete
2023-11-09finaledTC-COM-1123-02621City permit recordCommercial BuildingRe-feed existing electrical service from another service onsite, remove existing TEP meter and conductors.Complete
2023-11-02finaledTR-ROW-1123-01317City permit recordRight-of-Way (ROW)Tucson March for Life-2024 - 4 mile procession: Starts at 192 S. Stone Av and ends at 3555 N. Oracle Rd: partial closure: Police escorts: 2 hour peaceful procession: 31st year event: about 1500 particpants. Traffic control setup and take down: 8:30am -12:00pmComplete
2023-09-08finaledTF-FOP-0923-01480City permit recordFire OperationalSt. Augustine Cathedral Steak Dinner and FiestaComplete
2023-07-18TF-FOP-0723-01270City permit recordFire OperationalVOID-PLEASE SUBMIT A FIRE SPECIAL EVENT - ORGANIZER PERMIT - St. Augustine Cathedral Dinner and FiestaVoid
2022-12-19finaledTR-ROW-1222-00171City permit recordRight-of-Way (ROW)Peaceful and prayerful March from St. Augustine Cathedral to Holy Hope Cemetery - 4.2 miles - 30th year with this eventComplete
2022-09-27expired 2023-04-16T22OT00703City permit recordFence / wall2 non-illuminated wall signs on east elevation (needs historic review) 1 sign is 8.6 sqft and theExpired
2022-09-16finaledT22CM07136City permit recordCommercial BuildingTI: ST. AUGUSTINE CATHEDRAL CATERED DININGComplete
2019-09-24finaledT19FO00763City permit recordFIREOPERFALL FEST FUNDRAISER 10-19-2019Final
2018-09-17finaledT18FC00766City permit recordFIRECONSFire sprinkler underground supply pipingFinal
2018-08-17finaledT18FC00688City permit recordFIRECONSNEW FIRE ALARM SYSTEMFinal
2018-07-11finaledT18FC00566City permit recordFIRECONSINSTALL ONE (1) NEW KITCHEN HOOD SYSTEM FOR THE CATHEDRAL SQUARE CONFERENCE CENTER.Final
2018-05-07T18FC00387City permit recordFIRECONSNew Fire Alarm SystemWithdrwn
2017-12-28finaledT17FC01049City permit recordFIRECONSNew Fire Sprinkler System ** Underground done under separate permitFinal
2017-09-13expired 2018-03-14T17FC00749City permit recordFIRECONS5 FT UNDERGROUND LEAD - INS FDC & SUPPLYVoid
2017-05-09DS17-05City permit recordZoning Verification LetterTSMRApproved
2017-01-18finaledDP17-0019City permit recordDevelopment PackageSITE/GRADE/SWPPP/IID - SAINT AUGUSTINE CATHOLIC CHURCHComplete

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11713156B — 35 permits on file from 2017 to 2026 (12 fire operational, 8 right-of-way (row), 6 firecons, 2 fence / wall) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.