Electrical permit history — 72 E Congress St
72 E Congress St, Tucson — built 1955, with 24 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
72 E Congress St
Built 1955 — 1950s commercial stock · 24 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 72 E Congress St (aztucsonelectricalsolutions.com/property/117121940/72-e-congress-st-tucson-az-85701) · Public records last checked 2026-08-16
- Parcel
- 117121940
- Built
- 1955 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- OCR-2
- Assessor use
- Municipal Commercial Property
- Parcel size
- 0.09 acres
- Building area
- 7,115 sq ft (assessor record)
- Sewer
- Connection on file (2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Downtown Tucson Historic District — National Register district (City of Tucson)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 demolition permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 demolition permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyPermitted — completion not confirmedA 2025 permit specifies this work (the permit description states “New fire sprinkler system”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. TF-FCP-1125-01001 — New fire sprinkler system
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Most recent permit on record for this parcel: 2026-07-17 (TF-FCP-0726-00457) — Installation of a CaptiveAire TANK fire suppression system for a kitchen hood..
Permit history (24)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-07-17 | TF-FCP-0726-00457City permit record | Fire ConstructionInstallation of a CaptiveAire TANK fire suppression system for a kitchen hood. | Fees due | |
| 2026-07-09 | TF-FCP-0726-00436City permit record | Fire ConstructionVOID - Submit under Permit#TF-FCP-0526-00328 - T.I. FIRE ALARM | Void | |
| 2026-07-09 | TR-UTL-0726-01132City permit record | Right-of-Way (ROW) - UtilityPRJ319120-1: Cox to proof & pull thru 165' of existing CATV fiber for system tie. | Fees due | |
| 2026-06-12expires 2026-11-05 | TR-UTL-0626-00977City permit record | Addition / alterationAPPROX 2' X 175' TRENCH IN PAVEMENT/DIRT STARTING IN THE ALLEYWAY BEHIND 118 E CONGRESS ST GOING WEST, CROSSING SCOTT AVE AND CONNECTING WITH AN ADDITIONAL APPROX 2' X 50' TRENCH RUNNING PARALLEL TO SCOTT AVE TO INSTALL NEW GAS SERVICE TO 72 E CONGRESS. | Issued | |
| 2026-05-18expires 2026-12-10 | TF-FCP-0526-00328City permit record | Fire ConstructionSHELL BLDG DEDICATED FUNCTION | Issued | |
| 2026-02-02expired 2026-06-30 | TR-ROW-0226-00129City permit record | DemolitionRoad Closer for Stabilization and Renovation of building exterior walls; Demolition of entire interior floors and structure; demolition of roof; Selective demolition and renovation of exterior facade with new exterior shade canopy; new steel structure and floors for entire interior; new roof; new elevator and stairs, new restrooms; shell and core mechanical, plumbing and electrical. | Inspections | |
| 2025-12-08expired 2026-06-05 | TR-ROW-1225-01484City permit record | Right-of-Way (ROW)side walk closure- facade scaffold & pedestrian canopy 08/07/26- Denied renewal extension due to permit already had a prior approved permit. New permit needs to be apply for continuation of work. | Inspections | |
| 2025-11-26expires 2026-12-18 | TF-FCP-1125-01001City permit record | Fire ConstructionNew fire sprinkler system | Issued |
Show 16 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-11-05finaled | TR-ROW-1125-01377City permit record | DemolitionRoad Closer for crane work. Stabilization and Renovation of building exterior walls; Demolition of entire interior floors and structure; demolition of roof; Selective demolition and renovation of exterior facade with new exterior shade canopy; new steel structure and floors for entire interior; new roof; new elevator and stairs, new restrooms; shell and core mechanical, plumbing and electrical. | Complete | |
| 2025-06-18expires 2028-10-29 | TD-DEV-0625-00165City permit record | Development PackageTenant Improvement for full tenant build-out and occupancy. single restaurant/bar tenant for all floors - basement, 1st floor, mezzanine and 2nd floor. | Inspections | |
| 2025-04-08expires 2027-06-18 | TC-COM-0425-00692City permit record | Commercial BuildingTenant Improvement for full tenant build-out and occupancy. single restaurant/bar tenant for all floors - basement, 1st floor, mezzanine and 2nd floor. | Inspections | |
| 2025-02-21finaled | TR-UTL-0225-00326City permit record | Right-of-Way (ROW) - UtilityInstalling a 4" fire protection service | Complete | |
| 2024-10-18finaled 2024-11-21 | SD-1024-00105Design review | Rio Nuevo Area (RNA)RNA- DRB/HPZ RESUBMITTAL FOR MINOR REVIEW - Revisions to incorporate modifications to 1st flr storefront windows, doors and columns requested by NPS/SHPO and to maintain more of the existing building - wood joists and 2nd flr windows; to replace structurally unsound roof; to indicate exterior canopies as future options; to maintain west wall with no paint removal. | Complete | |
| 2024-09-10finaled | TR-ROW-0924-01028City permit record | Right-of-Way (ROW)Lay down area needed for interior demo of building. | Complete | |
| 2024-08-14expires 2026-11-10 | TC-COM-0824-01601City permit record | Commercial BuildingFoundation Only - Commerical Tenant Improvement - basement. | Issued | |
| 2024-07-12expired 2025-09-05 | TC-DMO-0724-00149City permit record | DemolitionSelective demolition of interiors only: demo basement concrete floor and interior piers, mezzanine, all remaining interior walls and partitions, all stairs, first floor wood columns, retain 1st & 2nd floor wood floor joists and wood center beam, remove all remaining flooring, remove all remaining ductwork, interior electrical & abandoned conduits and pipes. Prep for new work. | Issued | |
| 2024-06-05expired 2024-12-02 | TC-COM-0624-01085City permit record | Commercial BuildingProvide temporary electric service for job site while main electrical panel is down. | Expired | |
| 2024-05-16expires 2026-08-31 | TC-COM-0524-00952City permit record | DemolitionStabilization and Renovation of building exterior walls; Demolition of entire interior floors and structure; demolition of roof; Selective demolition and renovation of exterior facade with new exterior shade canopy; new steel structure and floors for entire interior; new roof; new elevator and stairs, new restrooms; shell and core mechanical, plumbing and electrical. | Approved | |
| 2022-05-25finaled | T22RW01988City permit record | Right-of-Way (ROW)Starting at the southwest corner of E Congress st and S Scott Ave using our existing Cox vault and conduit begin pulling 48ct fiber heading east for aprox. 12" and then south for aprox 125' then east 65' to existing vault, begin bore placing 2-2" conduits, 3' north, turn heading west for 49' west then south for 87', then turn west and continue bore and placing conduit for 18', a 3x3 pothole set a new Cox vault and pull fiber 8' south to tie into existing Communications vault and begin pulling on to private property ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. ADDRESS ON APPLICATION - 38 S SCOTT AV | Complete | |
| 2021-03-24finaled | T21RW01399City permit record | Pool / spaN.431004- ON S. SCOTT AVE ACCESS MH 2A-1635 TO SPLICE EXISTING CABLE. ADDRESS ON APPLICATION: N SCOTT AV This project is located in a City of Tucson Archaeological Sensitivity Zone. An archaeological monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. The Arizona State Museum can furnish a list of qualified archaeologists. Please allow up to 30 days for the monitor to obtain a project-specific Arizona Antiquities Act permit before scheduling the work. The existing City of Tucson monitoring and discovery plan for excavation within an Archaeological Sensitivity Zone may be used by the monitor to obtain the permit. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. PRIOR TO CLOSIING PARKING SPACES, CONTACT PARK TUCSON: 520-791-5071. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS | Final | |
| 2020-02-10finaled | T20RW00824City permit record | ROWTUCSON GRAND FONDO FESTIVAL BIKE RACE FOLLOWED BY BEER GARDEN CELEBRATION. FUNDRAISER FOR CHARITY | Final | |
| 2019-06-04 | T19CM03961City permit record | Commercial BuildingTI: RENNOVATE SHELL BUILDING | Canceled | |
| 2019-02-01finaled | T19RW00572City permit record | ROWACCESS MANHOLE #2A-1635 TO SPLICE FIBER. | Final | |
| 2018-05-02finaled | T18RW01990City permit record | ROWREMOVING EXISTING PAVEMENT & REPLACE WITH CONCRETE DP16-0202 | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (1)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2019-09-10 | T19DV07151Code enforcement case | Code enforcement case | Noverify |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 117121940 — 24 permits on file from 2018 to 2026 (4 fire construction, 4 demolition, 4 commercial building, 3 right-of-way (row)) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
