Electrical permit history — 2 E Congress St

2 E Congress St, Tucson — built 1929, with 38 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

2 E Congress St

Built 1929 — 1920s commercial stock · HVAC 2025 (finaled)

Parcel
11712087B
Built
1929 (assessor record)
Jurisdiction
Tucson
Zoning
OCR-2
Assessor use
Office Building/Store/Ofice 4/More Stys
Parcel size
0.25 acres
Building area
78,949 sq ft (assessor record)
Sewer
Connection on file (2008, 2009, 2017) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Downtown Tucson Historic District — National Register district (City of Tucson)

See the property

County aerial photograph centered on 2 E Congress St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalCurrentLast permitted 2025 (1 year ago). City inspection record: TRSP - ROW - Final approved 2025-05-19. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TR-ROW-0425-00536 — NEED A ROAD CLOSURE ON STONE AVE. FROM CONGRESS ST TO BROADWAY BLVD. TO SET UP A CRANE FOR LIFTING ACTIVITIES (REPLACING ROOFTOP HVAC EQUIPMENT). WE NEED A TOTAL OF 12 HOURS FOR THE ROAD CLOSURE. OUR CUSTOMER (TD INDUSTRIES) IS REQUESTING THE WORK/ CLOSURE TO TAKE PLACE ON 5/17/2025; 6:00 AM THRU 6:00 PM.
  • Fire alarm & life safetyCurrentLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-1224-01106 — EXPEDITE - NFP to modify existing fire sprinkler system.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

Most recent permit on record for this parcel: 2025-04-23 (TR-ROW-0425-00536) — NEED A ROAD CLOSURE ON STONE AVE. FROM CONGRESS ST TO BROADWAY BLVD. TO SET UP A CRANE FOR LIFTING ACTIVITIES (REPLACING ROOFTOP HVAC EQUIPMENT). WE NEED A TOTAL OF 12 HOURS FOR THE ROAD CLOSURE. OUR CUSTOMER (TD INDUSTRIES) IS REQUESTING THE WORK/ CLOSURE TO TAKE PLACE ON 5/17/2025; 6:00 AM THRU 6:00 PM..

Permit history (38)

Permit history for this parcel — 8 of 38 records
DateRecordWhatStatusValue
2025-04-23finaledTR-ROW-0425-00536City permit recordRight-of-Way (ROW)NEED A ROAD CLOSURE ON STONE AVE. FROM CONGRESS ST TO BROADWAY BLVD. TO SET UP A CRANE FOR LIFTING ACTIVITIES (REPLACING ROOFTOP HVAC EQUIPMENT). WE NEED A TOTAL OF 12 HOURS FOR THE ROAD CLOSURE. OUR CUSTOMER (TD INDUSTRIES) IS REQUESTING THE WORK/ CLOSURE TO TAKE PLACE ON 5/17/2025; 6:00 AM THRU 6:00 PM.Complete
2025-02-15finaledTR-ROW-0225-00219City permit recordRight-of-Way (ROW)This is for a Temp road closure on March 2 2025 at 40 E Congress. This is for a filming project. The address is not correct. The portal will not let me enter the true address. Traffic control set up and take down: 7:00am - Noon.Complete
2025-01-14finaledTF-FOP-0125-00061City permit recordFire OperationalTreasury 1929 - Liquor LicenseComplete
2024-12-19finaledTF-FCP-1224-01106City permit recordFire ConstructionEXPEDITE - NFP to modify existing fire sprinkler system.Complete
2024-12-06finaledTF-FCP-1224-01058City permit recordFire ConstructionNew Fire Suppression System Install for Kitchen HoodComplete
2024-11-22finaled 2025-02-16SD-1124-00120Design reviewHistoric Preservation Zone/Historic Landmark(1) New illuminated wall sign, (2) new non-illuminated wall signsComplete
2024-10-31expired 2025-09-10TS-PRM-1024-00482City permit recordFence / wall(1) New illuminated wall sign, (2) new non-illuminated wall signsIssued
2024-09-13finaledTF-FCP-0924-00786City permit recordFire ConstructionExpansion of the existing Fire Alarm System.Complete
Show 30 older records
Permit history for this parcel — remaining 30 records
DateRecordWhatStatusValue
2024-05-13finaledTC-COM-0524-00913City permit recordCommercial BuildingInterior remodelComplete
2024-02-02finaledTR-UTL-0224-00226City permit recordRight-of-Way (ROW) - UtilityPRJ264317-1 **TCP ONLY** COX TO SPLICE FOR SYSTEM TIE IN. (Work Zone along eastside of Southbound Stone Ave, South of Congress St)Complete
2022-07-01expired 2024-03-22T22CM04970City permit recordCommercial BuildingAutomatic Transfer Switch (ATS) Replacement at the Chase Building.Issued
2021-09-30finaledT21RW04495City permit recordROWSIDEWALK CLOSURE ALONG STONE AV AS CREW WILL BE REPLACING THE CHASE SIGN ON THE CHASE BANK BUILDING LOCATED AT 2 E CONGRESS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. MAINTAIN PEDESTRIAN ACCESS. 4. SUN LINK STOP IN AREA, CONTACT SUN LINK. 520-792-9222 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2020-04-14finaledT20RW02120City permit recordROW(2) 5X5 BELLHOLES IN CONCRETE- TO REPAIR/REPLACE GAS LINE. MOBILITY CONTROL PLAN SAME AS T20RW01550. FULL CLOSURE OF STONE AVE FROM 9:00 PM - 6:00 AM STARTING 4/20/20, MESSAGE BOARDS SET-UP 48-HRS IN ADVANCE TO STARTING WORK. OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED/TO GRADE WHEN NOT ON SITE WORKING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. NOTIFY IN WRITING AT LEAST 5 WORKING DAYS BEFORE WORK BEGINS, ANY BUSINESSES, ESIDENCES AND PUBLIC TRANSIT ROUTES AFFECTED BY YOUR TEMPORARY TRAFFIC CONTROL. NOTIFY SUN LINK (520) 792-9222 PRIOR TO WORK.Final
2020-02-20finaledT20CM01166City permit recordCOMBOW - INSTALLING NEW ACCESSIBLE TELLER STATIONFinal
2019-11-06finaledT19RW06822City permit recordROWSample a groundwater monitoring well (1 hour). (MW-PD-21) ADDRESS CHNAGED FROM "000 BLOCK, S STONE AVE" TO "2 E CONGRESS ST" NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020.Final
2018-04-30expired 2018-07-25T18RW01932City permit recordROWN.348825 - Job will fiber splice in MH 1635, MH 1463, MH 1275 and MH 1416Expired
2017-08-31T17RW03904City permit recordROW08/25/17 WORKING WITHOUT A ROW PERMIT FOR A SIDEWALK SCUPPER INSTALLATION ON STONE AVE. 08/31/17 NOV WAS SENT CERTIFIED MAIL. 09/29/2017 SECOND NOV WAS SENT CERTIFIED MAILVoid
2017-07-11finaledDP17-0168City permit recordDevelopment PackageSITEComplete
2017-06-16expired 2017-06-23T17RW02635City permit recordROWPREVENTIVE MAINTENANCE OF PUBLIC SEWER LINES ADDRESSES ON APPLICATION- 2-50 E CONGRESS & 400-1000 E UNIVERSITY BLExpired
2017-06-13finaledT17RW02563City permit recordROWTEP NEEDS TRAFFIC CONTROL TO PERFORM MAINTENANCE ON AN EXISTING UG VAULTFinal
2017-06-09finaledT17CM04515City permit recordCOMBOSTAIR MODIFICATIONL of c
2017-04-28finaledT17FC00345City permit recordFIRECONSRELOCATE 43 PENDENT SPRINKLERS, ADD 299 SPRINKLERS (3RD FLOOR)Final
2017-04-19finaledT17FC00309City permit recordFIRECONSRelocate/Replace 62 sprinklers Add 8 newFinal
2017-04-10finaledT17FC00280City permit recordFIRECONSINSTALL FIRE ALARM AND DETECTION DEVICES IN THE RENOVATED FLOORS - CONNECT TO THE EXISTING (ADDRESSABLE) FIRE PANELFinal
2017-04-05finaledT17FC00269City permit recordFIRECONSRELOCATE/REPLACE 66 SPRINKLERS; ADD 7 NEW SPRINKLERSFinal
2017-03-09finaledT17RW01093City permit recordROWPLACE ROLLOFF IN LOADING ZONE #22Final
2017-02-23expired 2017-08-22T17BU00078City permit recordDEMOINTERIOR DEMO ON FLOORS 3,4,5Expired
2017-02-23finaledT17CM01475City permit recordCOMBOAPARTMENTS 5TH FLOORC of o
2017-02-23finaledT17CM01474City permit recordCOMBOAPARTMENTS 4TH FLOORC of o
2017-02-23finaledT17CM01473City permit recordCOMBOAPARTMENTS 3RD FLOORC of o
2016-04-29expired 2023-04-10T16BU00673City permit recordSPKLRFIRE SPRKLClosed
2016-04-11finaledT16CM02627City permit recordCOMBOTI; COMMERCIALL of c
2015-11-18finaledT15BU01347City permit recordSPKLRFIRE SPRKLFinal
2015-03-04T15CM01486City permit recordCOMBOINTERIOR REMODELWithdrwn
2014-10-02finaledT14CM06541City permit recordCOMBOREPLACE CHILLERFinal
2013-07-08finaledT13CM04118City permit recordCOMBOTI: OFFICEC of o
2013-07-03finaledT13BU00816City permit recordSPKLRRELOCATE 19 SPRINKLERSFinal
2012-11-01expired 2012-12-31T12EX00590City permit recordEXCAVEXCA:3'X4' HAND HOLE OVER EXISTING 4"CONDUIT IN SIDEWALKClosed

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2020-10-16T20DV06872Code enforcement caseCode enforcement caseComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11712087B — 38 permits on file from 2012 to 2025 (9 combo, 8 row, 4 firecons, 3 fire construction) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.