Electrical permit history — 200 N Court Av

200 N Court Av, Tucson — built 1875, with 16 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

200 N Court Av

Built 1875 — 1870s commercial stock · 16 permits on record; no permitted panel/service or HVAC work among them

Parcel
11711020A
Built
1875 (county record)
Jurisdiction
Tucson
Zoning
HC-3
Assessor use
Municipal Commercial Property
Parcel size
0.22 acres
Building area
3,666 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
El Presidio Historic District — Historic Preservation Zone (City of Tucson)

See the property

County aerial photograph centered on 200 N Court Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2020 commercial building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2020 commercial building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2023. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2025-05-29 (TR-ROW-0525-00747) — Street fair celebrating Tucson's 250th birthday organized in conjunction with the City of Tucson, the Tucson-Pima County Historical Commission, the Arizona Historical Society, Los Descendientes de Tucson, the Presidio Museum, the Southern Arizona Transportation Museum, the Vail Preservation Society, and many community partners. Traffic control set up and take down: set 8am, take down 10pm.

Permit history (16)

Permit history for this parcel — 8 of 16 records
DateRecordWhatStatusValue
2025-05-29finaledTR-ROW-0525-00747City permit recordRight-of-Way (ROW)Street fair celebrating Tucson's 250th birthday organized in conjunction with the City of Tucson, the Tucson-Pima County Historical Commission, the Arizona Historical Society, Los Descendientes de Tucson, the Presidio Museum, the Southern Arizona Transportation Museum, the Vail Preservation Society, and many community partners. Traffic control set up and take down: set 8am, take down 10pmComplete
2023-12-18finaled 2024-03-27SD-1223-00145Design reviewRio Nuevo Area (RNA)This application is for the Rio Nuevo Activate El Presidio project. Addresses/parcels listed are adjacent to project sites. The project uses low impact activation principals and the Tucson Shared Spaces Manual for the design. There are nine areas within the El Presidio neighborhood that are included in this project.Complete
2023-11-17expires 2028-06-09TD-DEV-1123-00455City permit recordPool / spaThis application is for the Rio Nuevo Activate El Presidio project. Addresses/parcels listed are adjacent to project sites. The project uses low impact activation principals and the Tucson Shared Spaces Manual for the design. There are nine areas within the El Presidio neighborhood that are included in this project.Inspections
2022-08-26T22CM06621City permit recordCOMBOrestoration to buildingVoid
2021-05-14finaledT21RW02401City permit recordPool / spa(2) 5X5 bell holes in blktp front (Work will be done on Washington St just South of 15 W Washington St-- to repair/replace gas line ISSAP GRID PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. This project is located in a City of Tucson Archaeological Sensitivity Zone. An archaeological monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. The Arizona State Museum can furnish a list of qualified archaeologists. Please allow up to 30 days for the monitor to obtain a project-specific Arizona Antiquities Act permit before scheduling the work. The existing City of Tucson monitoring and discovery plan for excavation within an Archaeological Sensitivity Zone may be used by the monitor to obtain the permit. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESSFinal
2020-09-03finaledT20CM05904City permit recordCommercial BuildingRESTORATION AND TENANT IMPROVEMENTComplete
2020-01-22finaledT20RW00391City permit recordRight-of-Way (ROW)2 5x5 bellholes in blktop -- to abandon serviceNOTES:PERMIT END DATE HAS BEEN MODIFIED DUE TO; Work Order: 3924772Complete
2019-10-25finaledT19RW06507City permit recordROW(2) 5X5 BELLHOLES TO ABANDON SERVICE NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. This road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. IF YOUR WORK WILL EFFECT PARK TUCSON, YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO 10/28/2019- THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** PLEASE CONTACT ALLISON DIEHL 837-6965 OR AT ALLISON.DIEHL@TUCSONAZ.GOV WITH ANY QUESTIONS.Final
Show 8 older records
Permit history for this parcel — remaining 8 records
DateRecordWhatStatusValue
2019-08-23T19CM06106City permit recordCommercial BuildingRESTORATION OF HISTORIC STRUCTURECanceled
2018-02-21expired 2018-12-15T18OT00231City permit recordFence / wall1 wall sign on east elevation (along Church)Expired
2017-12-15expired 2018-01-19T17RW05562City permit recordROWISSAP ATLAS 0030 (1 LOCATION) ABANDON/REPLACE/TIEOVER GAS LINES <200 TRENCH (ASPHALT)Expired
2014-01-07finaledT14OT00027City permit recordSIGN1 BANNER @ 8 SQFT MAX, DISPLAYED ON CHURCH AVE FRONTAGE FOR 90 DAYS. SECURE ALL 4 CORNERS OF BANNER WITHOUT DAMAGE TO HISTORIC BUILDING - DO NOT BLOCK EXITS. START JAN. 8 2014 TO APRIL 8, 2014Final
2014-01-07finaledT14OT00026City permit recordSIGN(2) BANNERS @ 8 SQFT EACH MAXIMUM SIZE, 1 ON COURT AV, 1 ON WASHINGTON STREET FRONTAGE - FOR 90 DAYS - EACH BANNER TO BE SECURED ALL 4 CORNERS AND MUST NOT DAMAGE HISTORIC BUILDING - DO NOT BLOCK EXITS. START JAN. 8, 2014 - APRIL 8, 2014Final
2012-08-14expired 2013-02-10T12OT01213City permit recordSIGNSIGN 20667Expired
2007-05-10expired 2007-07-09T07EX00432City permit recordEXCAVSEWER REPAIR (T07PL00653)3 X 3 IN PAVEMENT TO REPAIR EXISTING HCSClosed
2007-04-12finaledT07PL00653City permit recordPLUMBREPAIR:SEWER LINEFinal

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11711020A — 16 permits on file from 2007 to 2025 (3 sign, 2 right-of-way (row), 2 pool / spa, 2 commercial building) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).