Electrical permit history — 219 N 3rd Av
219 N 3rd Av, Tucson — built 1937, with 21 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
219 N 3rd Av
Built 1937 — 1930s commercial stock · last permitted panel/service work 2021 (finaled); a newer 2021 permit is expired without a final
Permanent link: Electrical permit history for 219 N 3rd Av (aztucsonelectricalsolutions.com/property/117060640/219-n-3rd-av-tucson-az-85705) · Public records last checked 2026-08-16
- Parcel
- 117060640
- Built
- 1937 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-3
- Assessor use
- Store Front Commercial Bldg
- Parcel size
- 0.57 acres
- Building area
- 10,132 sq ft (assessor record)
- Sewer
- Connection on file (1988) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Iron Horse Expansion Historic District — National Register district (City of Tucson)
- Service on record
- City records show the 2021 permit was finalized; the permit description states “W/O# 2106829 - EXCAVATE FOR NEW SERVICE INSTALLATION @ 10 LF; Work Order: 2106829”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentA newer 2021 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “New service meter in meter bank gear box”. Last permitted 2021 (5 years ago). Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T21RW03136 — W/O# 2106829 - EXCAVATE FOR NEW SERVICE INSTALLATION @ 10 LF; Work Order: 2106829
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0925-00863 — New Office/Conference room to be added
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (2)
| Date | Price | Type |
|---|---|---|
| 2016-07-29 | $675,000 | Warranty Deed |
| 2003-09-17 | $355,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2025-09-26 (TF-FCP-0925-00863) — New Office/Conference room to be added.
Permit history (21)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-09-26finaled | TF-FCP-0925-00863City permit record | Fire ConstructionNew Office/Conference room to be added | Complete | |
| 2025-07-24finaled | SP-NRP-0725-00371City permit record | Simple*Complete - Added to Utility Clearance Report* - - Clearance for reconnect after 6 month period of vacancy. - - | Complete | |
| 2023-09-13expired 2024-03-11 | TC-COM-0923-02201City permit record | Fence / wallEnclosing conference room area with frame walls and ACT ceiling. Minor electrical and mechanical work. | Expired | |
| 2023-04-25finaled | TF-FCP-0423-00622City permit record | Fire ConstructionNFP TO ADD 1 PENDENT FIRE SPRINKLER | Complete | |
| 2022-12-09expired 2023-10-24 | TC-COM-1222-00273City permit record | Commercial BuildingInstall new access control (strikes and card readers, etc.) on two entry doors | Issued | |
| 2022-10-18expired 2025-04-28 | T22CM08005City permit record | Commercial BuildingTI: Studio | Issued | |
| 2022-09-20finaled | T22FC00654City permit record | FIRECONSDEDICATED FUNCTION SPRINKLER MONITORING PANEL. | Final | |
| 2022-08-08finaled | T22FC00537City permit record | FIRECONSNFP to add 3 pendent fire sprinklers. | Final |
Show 13 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-07-11finaled | T22RW02469City permit record | Right-of-Way (ROW)WO# PRJ224730-1 Starting on the North side of E. 9th st West of N 3rd Ave at TEP pole Overlash Going; Work Order: PRJ224730-1 | Complete | |
| 2022-05-05finaled | T22CM03433City permit record | COMBOTI: RETAIL | L of c | |
| 2022-04-07finaled | T22CM02564City permit record | COMBOOFFICE | C of o | |
| 2021-08-20 | T21CM06793City permit record | Commercial BuildingNew service meter in meter bank gear box | Expired | |
| 2021-08-20 | T21CM06795City permit record | Commercial BuildingNew service meter | Expired | |
| 2021-06-29finaled | T21RW03136City permit record | Right-of-Way (ROW)W/O# 2106829 - EXCAVATE FOR NEW SERVICE INSTALLATION @ 10 LF; Work Order: 2106829 | Complete | |
| 2021-06-11expired 2022-06-08 | T21FC00457City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - Modification to existing Fire Sprinkler system to accommmodate new suite; Commercial Fire Sprinkler Systems - Modification of heads: 8 | Expired | |
| 2021-03-04finaled | T21CM01966City permit record | COMBOSALON | C of o | |
| 2020-09-15finaled | T20RW05052City permit record | ROWTEP park within ROW, in order to complete Riser on new steel pole. | Final | |
| 2020-07-13finaled | T20RW04018City permit record | ROWSHELL IMPROVEMENT, T20CM01037 SAW CUT AND DEMO SIDEWAK FOR TEP TO RUN NEW ELECTRICAL SERVICE FROM POLE ON SE CORNER OF BUILDING TO NE CORNER WHERE NEW SERVICE WILL BE LOCATED. ROUTE DICTATED BY TEP IS MARKED ON ATTACHED PLANS. | Final | |
| 2020-05-26finaled | T20RW02979City permit record | ROWSAW CUT AND DEMO FOR NEW SEWER TAP AND SEWER LINE TO THE BUILDING PER T20CM1037 - E - SHELL IMPROVEMENTS @ 199 LF IN ASPHALT | Final | |
| 2020-05-05finaled | T20RW02552City permit record | ROWTEP to install new 45' steel pole within existing overhead pole line. Pole hole will be dug within sidewalk. Any patchwork needed will be done by TEP. | Final | |
| 2020-02-13expired 2022-11-09 | T20CM01037City permit record | Commercial BuildingE - SHELL IMPROVEMENTS | Issued |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (1)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2016-09-01 | T16DV05298Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 117060640 — 21 permits on file from 2020 to 2025 (5 commercial building, 4 row, 3 fire construction, 3 combo) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.