Electrical permit history — 505 E 9th St

505 E 9th St, Tucson — built 1917, with 20 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

505 E 9th St

Built 1917 — 1910s commercial stock · last permitted panel/service work 2017 (finaled)

Parcel
11706049A
Built
1917 (county record)
Jurisdiction
Tucson
Zoning
C-3
Assessor use
Store & Office Or Store & Apt Combo
Parcel size
0.25 acres
Building area
5,890 sq ft (assessor record)
Sewer
Connection on file (1998, 2019) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Iron Horse Expansion Historic District — National Register district — Contributing (City of Tucson)
Service on record
City records show the 2017 permit was finalized; the permit description states “UPGRADE UP TO 200AMP” — an increase in capacity as described, not a confirmed installed rating.

See the property

County aerial photograph centered on 505 E 9th St, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2017 (9 years ago). City inspection record: ELECTRIC - FINAL approved 2017-11-08. Contractor of record: PIMA ELECTRICAL CONTRACTORS INC **APA**. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T17CM07776 — UPGRADE UP TO 200AMP
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 commercial building permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

Recorded sales (3)

Recorded transfers from the Pima County Assessor — 3 of 3
DatePriceType
2015-09-15$420,000Warranty Deed
2003-10-01$330,000Deed
1998-09-01$140,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2023-06-01 (TR-ROW-0623-00818) — 3rd Ave and 9th St Traffic Circle Boulders, planting and surfacing..

Permit history (20)

Permit history for this parcel — 8 of 20 records
DateRecordWhatStatusValue
2023-06-01finaledTR-ROW-0623-00818City permit recordRight-of-Way (ROW)3rd Ave and 9th St Traffic Circle Boulders, planting and surfacing.Complete
2022-12-14TC-CFO-1222-00008City permit recordCertificate of OccupancyVoid- full C of O issued: Tenant ImprovementVoid
2022-08-29finaledT22RW03138City permit recordRight-of-Way (ROW)Install overhead transformer and dead ending the secondary** PROOF OF NOTIFICATION IS REQUIRED; Work Order: T29847Complete
2022-07-06finaledT22RW02411City permit recordROWEXCAVATE/TRENCH TO REPLACE AND CONNECT NEW SEWER LINE FOR PROPERTY AT 505 E 9TH ST EXISTING SEWER IS CAST-IRON AND IS CRACKEDFinal
2022-03-14expired 2023-06-13T22CM01861City permit recordCommercial BuildingElectrical Panel UpgradeIssued
2021-11-18finaledT21RW05041City permit recordPool / spaINSTALLATION OF NEW TRAFFIC CIRCLE, PER PAG SD 110, IN THE INTERSECTION OF 9TH STREET AND 3RD AVENUE FOR THE IRONHORSE NIEGHBORHOOD. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS 10. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-05-25finaledT21RW02590City permit recordPool / spaOCCUPYING TWO PARKING SPACE IN FRONT OF PRESTA COFFEE LOCATED ON THE NORTH SIDE OF E 9TH ST JUST EAST OF N 3RD AV. PARKING METERS 1124, 1125 WILL BE HOODED BY PARKTUCSON FOR USE OF A POP UP PARKLET AS PUBLIC OUTREACH FOR THE PARKLET/STREATERY PROGRAM. EVENT WILL BE HELD FRONT OF CURB, FROM 6AM-1PM ON 5/28 AND 5/29. During the installation and removal of parklet, placement of an advance warning sign and some vertical panels or cones may be considered to maintain the safety of those operating in the work area. ParkTucson must be notified at 791-5071. Pedestrian access must be provided and maintained per MUTCD Chapter 6D. Field adjustments may be required.Final
2021-02-04finaledT21CM01073City permit recordCommercial BuildingTenant ImprovementComplete
Show 12 older records
Permit history for this parcel — remaining 12 records
DateRecordWhatStatusValue
2020-01-29finaledT20FO00092City permit recordFIREOPERGRAIN CULTURE PANEL SE 11.01.19Final
2019-12-30finaledT19RW07759City permit recordROWREMOVE AND REPLACE 48"X48" SECTION OF SIDEWALK FOR NEW WATER METER HOOK UP. AREA WILL ONLY BE CLOSED FOR 24 HRS. PERMIT # T18CM01139Final
2019-10-30expired 2020-10-29T19FO00956City permit recordFIREOPERGRAIN CULTURE PANEL SE 11.01.19Void
2018-10-31DP18-0269City permit recordDevelopment PackageFees due
2018-02-13finaledT18CM01139City permit recordCOMBOTI: NEW COFFEE SHOPFinal
2017-10-16finaledT17CM07776City permit recordCOMBOUPGRADE UP TO 200AMPFinal
2017-10-11expired 2017-12-24T17RW04510City permit recordROWTRANSFER OF CTL FACILITIES FROM OLD TO NEW FOREIGN POLES ON WHICH CTL IS A JOINT USE ATTACHEE IN ORDER TO ELIMINATE DOUBLE WOOD POLE SITUATIONSExpired
2013-10-17expired 2014-06-02T13OT01225City permit recordSIGNBANNER 45 DAYS 10/17/13 THRU 12/01/13Expired
2008-04-30expired 2010-01-30T08OT01054City permit recordSIGN14909Expired
1998-09-14finaledT98EL01699City permit recordELECTNEW SERVICE:ELECTRIC:200 AMP W/2 CIRCUITSFinal
1998-09-08finaledT98EL01659City permit recordELECTUPGRADE:ELECTRIC 60 AMP TO 200 AMP W/CIRCUITSFinal
1998-08-11P98AN02009City permit recordADDRNEWIssued

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11706049A — 20 permits on file from 1998 to 2023 (3 row, 2 right-of-way (row), 2 commercial building, 2 pool / spa) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.