Electrical permit history — 420 E 7th St

420 E 7th St, Tucson — built 1919, with 66 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

420 E 7th St

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1919 — 1910s commercial stock · last permitted panel/service work 2026 (finaled) · HVAC 2003 (finaled)

Is it time to upgrade?

  • Electrical service & distributionFinaled permit foundLast permitted this year (2026). The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-0626-00835 — 100A Electrical service upgrade to 10 units, tie into existing subs/ Master Permit: TC-COM-1223-02899 (408 E 7TH ST TUCSON, AZ 85705) Sub permits: See master permit for approved plans. TC-COM-0626-00829 (341 N HOFF AV TUCSON, AZ 85705) TC-COM-0626-00830 (343 N HOFF AV TUCSON, AZ 85705) TC-COM-0626-00831 (406 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00833 (410 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00834 (412 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00835 (414 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00840 (416 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00841 (418 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00842 (420 E 7TH ST TUCSON, AZ 85705)
  • Heating, cooling & mechanicalLikely dueLast permitted 2003 (23 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T03ME00733 — REPLACE:FLOOR FURNACE
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    A finaled 2026 panel/service permit is on record for this parcel, which makes it unlikely the original 30–60 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    There is an electrical reconnect permit from 2018. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

  • Routine

    A trade permit was pulled in 2009. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 2,378 sq ft (county building-footprint layer, 2 structures; 1 neighbouring structure crossing the lot line excluded)
Usable for solar, planning estimate
≈ 1,700 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 20 kW — roughly 50 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 33,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$2,500–$4,500 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 1.4 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
117050880
Year constructed
1919 (assessor record)
Permitting authority
Tucson
Zoning
C-3
Property type
Retail Strip Center
Building area
5,048 sq ft
Service on record
City records show the 2026 permit was finalized; the permit description states “100A Electrical service upgrade to 10 units, tie into existing subs/ Master Permit: TC-COM-1223-02899 (408 E 7TH ST TUCSON, AZ 85705) Sub permits: See master permit for approved plans. TC-COM-0626-00829 (341 N HOFF AV TUCSON, AZ 85705) TC-COM-0626-00830 (343 N HOFF AV TUCSON, AZ 85705) TC-COM-0626-00831 (406 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00833 (410 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00834 (412 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00835 (414 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00840 (416 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00841 (418 E 7TH ST TUCSON, AZ 85705) TC-COM-0626-00842 (420 E 7TH ST TUCSON, AZ 85705) ” — an increase in capacity as described, not a confirmed installed rating.

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 66 building permits for this parcel dated between 1997 and 2026. By category the work is addition / alteration (34), trade permit (11), permanent sign (5) and floodplain use (3). 43 of them carry a final inspection; the other 23 were issued, expired or are still open, which is not the same as work completed. There are 10 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 117050880. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85705 · Commercial & industrial reports · Homes in 85705 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E 7TH ST hold 254 City permits on record, 70 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (76 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0626-00835Commercial Addition/Alteration PermitInspections Complete
2026TC-COM-0626-00831Commercial Addition/Alteration PermitInspections Complete
2026TC-COM-0626-00842Commercial Addition/Alteration PermitInspections
2026TC-COM-0626-00833Commercial Addition/Alteration PermitInspections Complete
2026TC-COM-0626-00840Commercial Addition/Alteration PermitInspections
2026TC-COM-0626-00830Commercial Addition/Alteration PermitInspections Complete
2026TC-COM-0626-00841Commercial Addition/Alteration PermitInspections
2026TC-COM-0626-00829Commercial Addition/Alteration PermitInspections Complete
2026TC-COM-0626-00834Commercial Addition/Alteration PermitInspections Complete
2026TC-COM-0626-00843Commercial Addition/Alteration PermitIn Review
2026CE-VIO0526-02013Work without permitClosed - Unfounded
2026CE-VIO0426-01623Work without permitClosed - Unfounded
2025TS-PRM-1225-00512Permanent Sign PermitAwaiting Submittal
2024TZ-PMT-0824-00059Peddler PermitExpired
2024recordRight-of-Way (ROW) Permit - UtilityComplete
2024CE-VIO0724-02749Code enforcement caseClosed - Resolved
2024TF-FOP-0324-00312Special Events Fire Permit - OrganizerComplete
2024TC-COM-1223-02899Commercial Trade PermitInspections
2022T22FO00808Special Events Fire Permit - OrganizerComplete
2021T21CM05249Commercial Trade PermitExpired
2021T21DV01255EMERGENCYCOMPLIAN
2020T20FC00629Fire Automatic Extinguishing System PermitComplete
2020T20CM04617Commercial Addition/Alteration PermitComplete
2019T19CM02045Commercial Addition/Alteration PermitComplete
2018T18OT00898Peddler PermitCanceled
2018T18CM00101Commercial Trade PermitComplete
2015T15CM06017Commercial Addition/Alteration PermitComplete
2015T15DV06579GRAFFITINOVERIFY
2015T15DV05020COMMERCIAL ZONINGCOMPLIAN
2014T14OT01508Permanent Sign PermitComplete
2014T14OT00701Elevation CertificateComplete
2014T14OT00650Floodplain Use PermitComplete
2013T12CM03025Commercial Addition/Alteration PermitComplete
2013T12OT00814Floodplain Use PermitComplete
2013T13OT00016Commercial Addition/Alteration PermitComplete
2012T12DV10799WORK WITHOUT PERMITS-COMMERCLREFERRED
2012T12DV10800WORK WITHOUT PERMITS-COMMERCLNOVERIFY
2012T12SA00367Zoning ComplianceApproved
2012T12PRE0081Pre-Application ConferenceCanceled
2012DP12-0079Development PackageComplete
2012T12OT00385Permanent Sign PermitCanceled
2011T11OT01963Permanent Sign PermitCanceled
2011T11EL00019Commercial Trade PermitCanceled
2010T10DV08886RESIDENTIAL FIRECOMPLIAN
2010T09OT00747Commercial Addition/Alteration PermitComplete
2010T09OT00746Commercial Addition/Alteration PermitComplete
2010T09OT00749Commercial Addition/Alteration PermitComplete
2010T09OT00751Commercial Addition/Alteration PermitComplete
2010T09OT00750Commercial Addition/Alteration PermitComplete
2010T09OT00748Commercial Addition/Alteration PermitComplete
2010T09OT00752Commercial Addition/Alteration PermitComplete
2010T09OT00745Commercial Addition/Alteration PermitComplete
2009T09SA00156Zoning ComplianceComplete
2009T09EL01396Residential Trade PermitComplete
2008T08OT02831Permanent Sign PermitComplete
2008T08CM02420Commercial Addition/Alteration PermitComplete
2008T08DV03929WORK WITHOUT PERMITS-RESIDENTLCOMPLIAN
2008T08OT00841Commercial Addition/Alteration PermitWithdrawn
2008T08OT00839Commercial Addition/Alteration PermitCanceled
2008T08OT00840Commercial Addition/Alteration PermitCanceled
2006T06OT01205Commercial Addition/Alteration PermitWithdrawn
2005T05OT02346Commercial Addition/Alteration PermitWithdrawn
2005T05SA00157Zoning ComplianceEffectuated
2005T04OT00295Floodplain Use PermitComplete
2004T04OT02101Commercial Addition/Alteration PermitWithdrawn
2004T03CM05650Commercial Addition/Alteration PermitComplete
2003T03ME00733Residential Trade PermitComplete
2002T02OT01404Commercial Addition/Alteration PermitWithdrawn
2001T01CM05102Commercial Trade PermitComplete
2001T01EL02485Commercial Trade PermitComplete
2001T01EL00071Residential Trade PermitComplete
2000T99CM04289Commercial Addition/Alteration PermitComplete
2000T00BU01156Fire Automatic Extinguishing System PermitComplete
1998T98OT00061Commercial Addition/Alteration PermitComplete
1997T97PL01218Commercial Trade PermitComplete
1997T97PL00099Commercial Trade PermitCanceled

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 117050880 — 66 City permits on file from 1997 to 2026 and 10 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area, roof, walls on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.