Electrical permit history — 345 N 5th Av

345 N 5th Av, Tucson — built 1930, with 45 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

345 N 5th Av

Built 1930 — 1930s commercial stock · last permitted panel/service work 2023 (finaled); a newer 2023 permit is issued · HVAC 2023 (finaled); a newer 2023 permit is issued

Parcel
11705069E
Built
1930 (assessor record)
Jurisdiction
Tucson
Zoning
I-1
Assessor use
Restaurant Sit Down W/ Cocktail Lounge
Parcel size
2.58 acres
Building area
13,976 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
AE — Special Flood Hazard Area (FEMA)
Historic preservation
Warehouse Historic District — National Register district (City of Tucson)
Service on record
City records show the 2023 permit was finalized; the permit description states “PLEASE PAY TCO EXTENSION FEE UNDER TC-CFO-0724-00150. WHEN REQUESTING TCO EXTENSIONS PLEASE REQUEST UNDER TC-CFO-0724-00150. Project is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service.”.

See the property

County aerial photograph centered on 345 N 5th Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentA newer 2023 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “PLEASE PAY TCO FEE TC-CFO-0823-00121. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 09/21/26. Please request TCO extension in SEPTEMBER Prior to 09/21/26 if needed. Project is A2 assembly (Pickleball Courts) tenant Improvement within existing building . New HVAC, Plumbing, and Electrical service.”. Last permitted 2023 (3 years ago). Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-CFO-0823-00120 — PLEASE PAY TCO EXTENSION FEE UNDER TC-CFO-0724-00150. WHEN REQUESTING TCO EXTENSIONS PLEASE REQUEST UNDER TC-CFO-0724-00150. Project is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service.
  • Heating, cooling & mechanicalCurrentA newer 2023 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “PLEASE PAY TCO FEE TC-CFO-0823-00121. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 09/21/26. Please request TCO extension in SEPTEMBER Prior to 09/21/26 if needed. Project is A2 assembly (Pickleball Courts) tenant Improvement within existing building . New HVAC, Plumbing, and Electrical service.”. Last permitted 2023 (3 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-CFO-0823-00120 — PLEASE PAY TCO EXTENSION FEE UNDER TC-CFO-0724-00150. WHEN REQUESTING TCO EXTENSIONS PLEASE REQUEST UNDER TC-CFO-0724-00150. Project is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service.
  • Fire alarm & life safetyCurrentLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-1122-00116 — EXTEND THE EXISTING MONITORING CIRCUIT TO THE NEW SPRINKLER RISER AND KITCHEN HOODS FIRE RELAY -UPDATED TO NEW NOTIFICATION SYSTEM
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.

  • Worth confirming

    A pool or spa was permitted in 2022. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2026-03-09 (TR-ROW-0326-00272) — On Sunday, April 12th, Living Streets Alliance will host its 24th Cyclovia Tucson event, having participants enjoy one of Tucson's Bike Boulevards from Downtown to Amphi. It connects the neighborhoods of West University, Feldman's, Sugar Hill, Keeling, Amphi which are part of Ward 3 and Ward 6. The route will also have activities at Doris J. Thompson Park and the smaller park, Catalina Park. Over 45 other nonprofit organizations and NGOs, local businesses, and community partners will bring the 3.25 route to life, providing a free, fun, car-free day for an anticipated 40,000 people from across the region to enjoy. Traffic control set up and take down: Setup: 4am - Take Down: 315pm.

Permit history (45)

Permit history for this parcel — 8 of 45 records
DateRecordWhatStatusValue
2026-03-09finaledTR-ROW-0326-00272City permit recordRight-of-Way (ROW)On Sunday, April 12th, Living Streets Alliance will host its 24th Cyclovia Tucson event, having participants enjoy one of Tucson's Bike Boulevards from Downtown to Amphi. It connects the neighborhoods of West University, Feldman's, Sugar Hill, Keeling, Amphi which are part of Ward 3 and Ward 6. The route will also have activities at Doris J. Thompson Park and the smaller park, Catalina Park. Over 45 other nonprofit organizations and NGOs, local businesses, and community partners will bring the 3.25 route to life, providing a free, fun, car-free day for an anticipated 40,000 people from across the region to enjoy. Traffic control set up and take down: Setup: 4am - Take Down: 315pmComplete
2025-12-03finaledTF-FOP-1225-01574City permit recordFire Operational2026 Tucson Jazz FiestaComplete
2025-12-03finaledTR-ROW-1225-01462City permit recordRight-of-Way (ROW)2026 Tucson Jazz Fiesta Traffic control set up and take down: Sunday, January 18, 9AM - Monday, January 19, 11PMComplete
2025-11-17finaledTR-ROW-1125-01410City permit recordRight-of-Way (ROW)Excavate in the asphalt between the Zayo HH and Lumen MH to repair a conduit. The estimated excavation dimensions are 10 x 6 x 4 feet. We will also be required to repave an area of 60 x 8 feet and restripe it with thermal material to match the existing surface. Address- 6TH AVE & TOOLE ***Complete
2025-09-15TF-FOP-0925-01222City permit recordFire OperationalVOID - Submit 30 days before event - 2026 Tucson Jazz FiestaVoid
2025-09-11finaledTC-CFO-0925-00132City permit recordCertificate of OccupancyTCO RENEWAL IN ORIGINAL REQUEST TC-CFO-0823-00121 - tenant improvement within existing shell. Work includes Architecture and Electrical.Complete
2024-10-14finaledTF-FOP-1024-01178City permit recordFire OperationalCorbett's - Downtown Jazz Fiesta 2025Complete
2024-10-14finaledTR-ROW-1024-01211City permit recordRight-of-Way (ROW)Downtown Jazz Fiesta 2025 Traffic control set up and take down: Sunday, January 19, 12PM - Monday, January 20, 11PMComplete
Show 37 older records
Permit history for this parcel — remaining 37 records
DateRecordWhatStatusValue
2024-07-25expires 2026-09-24TC-CFO-0724-00150City permit recordCertificate of OccupancyPLEASE PAY TCO FEE TC-CFO-0724-00150. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30 DAYS AND WILL EXPIRE 09/24/26. Please request TCO extension in SEPTEMBER Prior to 09/24/26 if needed. New metal building shell, covered patios, and interior restaurant fit out. Scope includes ArchitectIssued
2024-05-23finaledTC-CFO-0524-00115City permit recordCertificate of OccupancyPLEASE PAY TCO EXTENSION UNDER TC-CFO-0823-00120 . ONCE PAID NEW TCO WILL EXTEND ANOTHER 30 DAYS AND WILL EXPIRE 12/25/2024. PLEASE REQUEST TCO EXTENSION UNDER TC-CFO-0823-00120 IN DECEMBER PRIOR TO 12/22/24 IF NEEDED. New metal building shell, covered patios, and interior restaurant fit out. Scope includes ArchitectComplete
2023-12-12finaledTR-ROW-1223-01447City permit recordRight-of-Way (ROW)Downtown Jazz Fiesta Traffic Control set up and take down: Sunday, January 14, 9am - Monday, January 15, 11pmComplete
2023-11-19finaledTF-FOP-1123-01781City permit recordFire OperationalDowntown Jazz FiestaComplete
2023-08-22expires 2026-09-21TC-CFO-0823-00121City permit recordCertificate of OccupancyPLEASE PAY TCO FEE TC-CFO-0823-00121. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 09/21/26. Please request TCO extension in SEPTEMBER Prior to 09/21/26 if needed. Project is A2 assembly (Pickleball Courts) tenant Improvement within existing building . New HVAC, Plumbing, and Electrical service.Issued
2023-08-21expires 2026-09-21TC-CFO-0823-00119City permit recordCertificate of OccupancyPLEASE PAY TCO FEE TC-CFO-0823-00119. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 09/21/2026. Please request TCO extension in SEPTEMBER Prior to 09/21/2026 if needed. Project is A2 assembly (restaurant bar) and A2 assembly outdoor areas (ramadas and pickleball courts). New ground up construction, covered patios, and pickleball court site amenities. New HVAC, Plumbing, and Electrical service.Issued
2023-08-21finaledTC-CFO-0823-00120City permit recordCertificate of OccupancyPLEASE PAY TCO EXTENSION FEE UNDER TC-CFO-0724-00150. WHEN REQUESTING TCO EXTENSIONS PLEASE REQUEST UNDER TC-CFO-0724-00150. Project is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service.Complete
2023-08-16finaledTF-FCP-0823-00997City permit recordFence / wallAdd 6 sidewalls under overhead doorsComplete
2023-08-14TE-FPU-0823-00293City permit recordFloodplain Usetenant improvement within existing shell. Work includes Architecture and Electrical.Issued
2023-08-07finaledTS-PRM-0823-00448City permit recordSign - PermanentInstall (1) non-illuminated open pan cabinet with inlaid wooden planks w/ stencilled lettering "Corbett's", mounted to repurposed freestanding steel archway structure. *Steel archway requires separate building permit.*Complete
2023-08-04finaledTC-CFO-0823-00107City permit recordCertificate of OccupancyProject is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health dept compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service.Complete
2023-08-04TC-CFO-0823-00108City permit recordCertificate of OccupancyPlease pay TCO extension under TC-CFO-0823-00119 This project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector, Fire Inspector, and Engineering Inspector and the TCO level for the building. Please re-reques TCO when the inspector has given the okay for TCO Project is A2 assembly (restaurant bar) and A2 assembly outdoor areas (ramadas and pickleball courts). New ground up construction structures, covered patios, and pickleball court site amenities. health dept compliant bar. New HVAC, Plumbing, and Electrical service.Denied
2023-07-31finaledTF-FOP-0723-01302City permit recordFire Operationalplaces of assembly permitComplete
2023-07-31finaledTF-FOP-0723-01303City permit recordFire Operationalplaces of public assemblyComplete
2023-07-31finaledTF-FOP-0723-01304City permit recordFire Operationalplace of assemblyComplete
2023-07-28TC-CFO-0723-00102City permit recordCertificate of OccupancyThis project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector and Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request on the inspector has given the okay for TCO Requesting stock and training TCO. We have received the building finals, the health dept approval for a stock and train, and the fire approval for stock and train, and we have uploaded the water sterilization report.Denied
2023-06-23finaledTS-PRM-0623-00370City permit recordSign - PermanentFabricate & Install (1) set of neon illuminated open pan channel letters with clear acrylic faces, mounted to 2" steel square tube frame, mounted to canopy.Complete
2023-05-16expired 2023-12-17TC-COM-0523-01285City permit recordCommercial BuildingInstall new Electrical Meter to power existing site lighting. TEP is requesting a new permit for the new meter. plans live under T21CM06128 (340 N 6TH AV Unit:BLDG 2 TUCSON, AZ 85705) Permit for TEP purposes only.Issued
2023-03-16finaledTR-UTL-0323-01100City permit recordRight-of-Way (ROW) - UtilityCOX TO OVERLASH 1350' OF AERIAL STRAND FOR SYSTEM TIE.Complete
2023-02-13expired 2023-08-12TS-PRM-0223-00183City permit recordFence / wallFabricate & Install (2) canopy mounted ID signs "The Corbett" internally illuminated aluminum cabinet sign with copy routed from face and backed in acrylic, mounted to existing brick wall/pillar structure. Smaller tenant sign suspended below main sign cabinetExpired
2023-02-02finaledTR-ROW-0223-00332City permit recordRight-of-Way (ROW)LANE CLOSURES FOR CORBETT BLOCK, I-2020-017 - PIA T20PI00018; Work Order: CORBETT BLOCK PLAN 1 - HARD CLOSURE ON 7TH ST TO INSTALL STORM DRAIN - EXCAVATE APROX. 40’L X 8’D X 5’W. PLAN 2- REMOVE AND REPLACE 6' OF CURB AT THE SOUTH EST CORNER OF 6TH AV AND 7TH ST. 24 HR CLOSURES.Complete
2023-01-05expired 2023-07-04TS-PRM-0123-00106City permit recordSign - PermanentWITHDRAWN 5/11/2023 - SIGN DESIGN IS CHANGING, PER CONTRACTOR - Install (1) set of canopy mounted neon illuminated lettersWithdrawn
2022-11-18finaledTF-FCP-1122-00116City permit recordFire ConstructionEXTEND THE EXISTING MONITORING CIRCUIT TO THE NEW SPRINKLER RISER AND KITCHEN HOODS FIRE RELAY -UPDATED TO NEW NOTIFICATION SYSTEMComplete
2022-11-03expired 2024-02-19TC-COM-1122-00037City permit recordCommercial Buildingcourtyard remodel to add 3 Pickleball courts, small bar building , ramadas, and storage structure. Architectural, Mechanical, Plumbing, and electrical.Issued
2022-11-03expired 2024-02-27TC-COM-1122-00039City permit recordCommercial Buildingtenant improvement within existing shell. Work includes Architecture and Electrical.Issued
2022-10-31TC-COM-1022-00003City permit recordCommercial BuildingExisting building renovation, new commercial building, site workExpired
2022-08-20finaledT22RW03002City permit recordPool / spaLANE CLOSURES FOR CORBETT BLOCK, I-2020-017 - PIA T20PI00018; Work Order: CORBETT BLOCK PLAN 1 - HARD CLOSURE ON 7TH ST TO INSTALL STORM DRAIN - EXCAVATE APROX. 40’L X 8’D X 5’W. PLAN 2- REMOVE AND REPLACE 6' OF CURB AT THE SOUTH EST CORNER OF 6TH AV AND 7TH ST. 24 HR CLOSURES. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. STOP WORK AND NOTIFY HPO IF ANY BURIED CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722Complete
2022-01-27finaledT22FC00067City permit recordFence / wallAutomatic Fire Extingshing Sys - 8 uprights for new bathroom walls.; Commercial Fire Sprinkler Systems - Modification of heads: 8Complete
2021-12-03finaledT21FC00884City permit recordAddition / alterationAutomatic Fire Extingshing Sys - Installation of Protex II Fire Suppression System for kitchen hood.; Commercial Cooking Suppression - New System: 1; Additional Plan Reviews: 1Complete
2021-11-08finaledT21FC00829City permit recordFire ConstructionAutomatic Fire Extingshing Sys - New fire sprinkler system - 89 heads.Complete
2021-10-29finaledT21RW04859City permit recordRight-of-Way (ROW)CORBETT BLOCK, T20PI00018 , DP20-0125TRENCH TO INSTALL ELECTRIC CONDUIT 704L’ X 2’W X 3’D’ . TH; Work Order: CORBETT BLOCKComplete
2021-10-21finaledT21RW04795City permit recordFence / wallOFFSITE IMPROVEMENTS FOR CORBETT BLOCK, PIA T20PI00018, DP20-0125PLACEMENT OF FENCE ONLY AROUND; Work Order: DP20-0125Complete
2021-09-27expired 2022-03-28T21OT00712City permit recordFloodplain UseNew metal building shell, covered patios, and interior restaurant fit out. Scope includes ArchitectuIssued
2021-07-28expired 2024-11-18T21CM06128City permit recordCommercial BuildingNew metal building shell, covered patios, and interior restaurant fit out. Scope includes ArchitectNeeds resubmittal
2020-06-11expires 2026-08-30DP20-0125City permit recordDevelopment PackageSite/Grading/SWPPP / IID - Corbett Block, new entertainment and food service.Issued
2019-05-08finaledT19FC00348City permit recordFire ConstructionAutomatic Fire Extingshing Sys - REINSTALL NEW RISER AND 1ST FLOOR SPRINKLER SYSTEM = 61 HEADS; Commercial Fire Sprinkler Systems - Modification of heads: 61Complete
2018-07-12expired 2024-02-18T18CM05456City permit recordCommercial BuildingTI: SHELLExpired

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (7)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 7 of 7 records
DateRecordWhatStatus
2021-08-10T21DV05209Housing code violationPROP MAINT MULTIPLE TYPESrecorded before 2023COMPLIAN
2021-06-22T21DV03909Housing code violationREFUSErecorded before 2023NOVERIFY
2021-06-18T21DV03838Housing code violationREFUSErecorded before 2023NOVERIFY
2017-02-25T17DV00791Housing code violationFIRE AT COMMERCIAL BUILDINGrecorded before 2023COMPLIAN
2014-11-26T14DV09721Housing code violationCOM: VACANT & ABANDONEDrecorded before 2023COMPLIAN
2014-08-22T14DV06389Housing code violationMULTIPLE TYPESNotice of violation issued · recorded before 2023COMPLIAN
2013-02-27T13DV01169Housing code violationMULTIPLE TYPESNotice of violation issued · recorded before 2023COMPLIAN

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11705069E — 45 permits on file from 2018 to 2026 (9 certificate of occupancy, 7 right-of-way (row), 7 fire operational, 6 commercial building) and 7 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.