Electrical permit history — 450 N 5th Av

450 N 5th Av, Tucson — built 1925, with 14 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

450 N 5th Av

Built 1925 — 1920s commercial stock · 14 permits on record; no permitted panel/service or HVAC work among them

Parcel
11705043A
Built
1925 (assessor record)
Jurisdiction
Tucson
Zoning
C-3
Assessor use
Municipal Residential Property
Parcel size
0.97 acres
Building area
174,008 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Warehouse Historic District — National Register district (City of Tucson)

See the property

County aerial photograph centered on 450 N 5th Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 pool / spa permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 pool / spa permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyPermitted — completion not confirmedA 2021 permit specifies this work (the permit description states “Fire Alarm & Detection Systems - Monitoring Permit for Union East Building.; Fire Alarm Systems - Monitor Only; Work Started Without Approved Permit”), but the available record does not show a final inspection. The permit expired without a confirmed final status. Official status: Expired. T21FC00737 — Fire Alarm & Detection Systems - Monitoring Permit for Union East Building.; Fire Alarm Systems - Monitor Only; Work Started Without Approved Permit
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2026-06-23 (TC-COM-0626-00947) — T.I. to just get power, mechanical systems, and plumbing systems to the suite for future tenant to utilize for suite improvements under their own permit.

Permit history (14)

Permit history for this parcel — 8 of 14 records
DateRecordWhatStatusValue
2026-06-23expires 2027-08-13TC-COM-0626-00947City permit recordCommercial BuildingT.I. to just get power, mechanical systems, and plumbing systems to the suite for future tenant to utilize for suite improvements under their own permitIssued
2025-08-22finaledTR-ROW-0825-01045City permit recordRight-of-Way (ROW)Need to put a storage container on east side of 5th Ave. Between 7th St and 6th St.Complete
2025-07-23finaledTR-ROW-0725-00942City permit recordRight-of-Way (ROW)Permit needed to place POD container for scheduled move out for Union on 6th Apartment on 5th ave. Dates of request is 7/29/25-8/1/25Complete
2025-07-22TZ-REV-0725-00003City permit recordZoning Review 60 Day**VOID - NEEDS ROW PERMIT** Requesting a permit for my POD to be placed for apartment move in. The POD is 8x8x16 and Union on 6th parking garage is not large enough to house the unit.This is a temporary permit needed.Void
2025-01-22finaledSP-NRP-0125-00029City permit recordPool / spa*Complete - Added to Utility Clearance Report* - - Just starting leasing the retail space and am looking to reconnect electric. TEP stated it had been disconnected for more than 6 months. No changes or additions have been made to the space - -Complete
2023-08-01finaledTR-ROW-0823-01027City permit recordPool / spaTemporary Employment Parking Spaces on N 5th Avenue, and 6th Street.Complete
2023-07-26finaledTR-ROW-0723-01001City permit recordRight-of-Way (ROW)Permit needed to park a POD 8x8x16 for a move into Union on 6th apartment. On the Corner of 5th Avenue and 6th street. Dates needed 8/19-8/21 to have meters covered zone #5202 Meters 394, 395,396,397.Complete
2023-07-24TZ-REV-0723-00019City permit recordPool / spaVOID - IN RIGHT-OF-WAY - Moving my son into apartment and need space for Pod unit to be delivered for the move due to the height of the container we will need parking spaces Corner of 5th avenue and 6th street left hand side of the building Union on 6th Apartment garage.Void
Show 6 older records
Permit history for this parcel — remaining 6 records
DateRecordWhatStatusValue
2023-05-24finaledTS-PRM-0523-00325City permit recordFence / wallSingle Face Wall Mount Illuminated CabinetComplete
2023-01-30expired 2024-06-17TC-COM-0123-00551City permit recordPool / spaVanilla Shell Improvement to space for future retail. Addition of bathroom space, electrical and mech associated.Issued
2022-11-14finaledTC-COM-1122-00111City permit recordCommercial BuildingReplacing 98 existing recirculating residential kitchen ventilation hoods with 98 ducted residential ventilation hoods.Complete
2021-12-30T21RW05416City permit recordROWThe contractor will be installing new concrete curb. No lane restrictions will be necessary and pedestrian walkway will be available.Withdrwn
2021-09-29expired 2022-10-13T21FC00737City permit recordFire ConstructionFire Alarm & Detection Systems - Monitoring Permit for Union East Building.; Fire Alarm Systems - Monitor Only; Work Started Without Approved PermitExpired
2020-05-11finaledT20RW02644City permit recordROWREMOVE 1’ W x 3000’ L OF ASPHALT NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 6TH was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. ***OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS.*** ***CONTRACTOR MUST REACH OUT TO INSPECTOR FOR PRE-CON BEFOR ANY WORK CAN BE DONE***Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (10)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 10 records
DateRecordWhatStatus
2023-08-11CE-VIO0823-05075Code enforcement caseWork without permitClosed - resolved
2022-12-07CE-VIO1222-00860Code enforcement caseCode enforcement caseClosed - resolved
2022-07-29T22DV04300Housing code violationRESIDENTIAL STORAGErecorded before 2023COMPLIAN
2021-09-06T21DV06131Housing code violationEMERGENCYrecorded before 2023COMPLIAN
2019-05-29T19DV04327Housing code violationMULTIPLE TYPESrecorded before 2023COMPLIAN
2016-10-28T16DV07516Housing code violationENVIRONMENTALrecorded before 2023COMPLIAN
2016-07-12T16DV04271Housing code violationGRAFFITIrecorded before 2023COMPLIAN
2015-08-27T15DV06294Housing code violationENVIRONMENTALrecorded before 2023NOVERIFY
Show 2 older records
Code enforcement history for this parcel — remaining 2 records
DateRecordWhatStatus
2010-12-16T10DV08978Housing code violationGRAFFITINotice of violation issued · recorded before 2023COMPLIAN
2009-04-15T09DV02018Housing code violationWEEDSrecorded before 2023NOVERIFY

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11705043A — 14 permits on file from 2020 to 2026 (4 pool / spa, 3 right-of-way (row), 2 commercial building, 2 row) and 10 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.